# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 10-Aug-2007 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 10-Aug-2007 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 10-Aug-2007 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 10-Aug-2007 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 10-Aug-2007 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 10-Aug-2007 | |
7 | 1 | No interference with Geodetic Survey Station Lulworth and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 10-Aug-2007 | |
8 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Use & Benefit Of Aborigines Reserve 16670. | 10-Aug-2007 | |
9 | 5 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
- "Programme of Work for Midwest Corporation Ltd on E20/641 (EXP 7712) dated 18 October 2007 signed by Rachel Ryan, and retained on Department of Industry and Resources file No. T4472/200601;
- "Programme of Work on E20/492, E20/641 and P51/2581 for Sinosteel Midwest Corporation Limited (Reg ID 26317) dated 19 March 2010 signed by Jonathan Stott and retained on Department of Mines and Petroleum File No. 10612/00Vol01;
- "Programme of Work on E20/642 for Sinosteel Midwest Corporation Limited" (Reg ID 28738) dated 1 November 2010 signed by Jonathan Stott and retained on Department of Mines and Petroleum File No. EARS-POW-28738
- "Programme of Work on E20/641 for Sinosteel Midwest Corporation Limited" (Reg ID 29187) dated 14 December 2010 signed by Jarrad Woodland and retained on Department of Mines and Petroleum File No. EARS-POW-29187;
- (Pow Reg ID 79321) "Sinosteel Midwest Corporation Limited - Environmental Management Plan (Exploration)" dated 11 April 2019 signed by P Hogan, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-79321 as Doc ID 6475965
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 02-May-2019 | |
9 | 4 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Midwest Corporation Ltd on E20/641 (EXP 7712) dated 18 October 2007 signed by Rachel Ryan, and retained on Department of Industry and Resources file No. T4472/200601;
- "Programme of Work on E20/492, E20/641 and P51/2581 for Sinosteel Midwest Corporation Limited (Reg ID 26317) dated 19 March 2010 signed by Jonathan Stott and retained on Department of Mines and Petroleum File No. 10612/00Vol01;
- "Programme of Work on E20/642 for Sinosteel Midwest Corporation Limited" (Reg ID 28738) dated 1 November 2010 signed by Jonathan Stott and retained on Department of Mines and Petroleum File No. EARS-POW-28738
- "Programme of Work on E20/641 for Sinosteel Midwest Corporation Limited" (Reg ID 29187) dated 14 December 2010 signed by Jarrad Woodland and retained on Department of Mines and Petroleum File No. EARS-POW-29187
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 24-May-2011 | 01-May-2019 |
9 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Midwest Corporation Ltd on E20/641 (EXP 7712) dated 18 October 2007 signed by Rachel Ryan, and retained on Department of Industry and Resources file No. T4472/200601;
- "Programme of Work on E20/492, E20/641 and P51/2581 for Sinosteel Midwest Corporation Limited (Reg ID 26317) dated 19 March 2010 signed by Jonathan Stott and retained on Department of Mines and Petroleum File No. 10612/00Vol01;
- "Programme of Work on E20/641 for Sinosteel Midwest Corporation Limited" (Reg ID 29187) dated 14 December 2010 signed by Jarrad Woodland and retained on Department of Mines and Petroleum File No. EARS-POW-29187
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 30-Mar-2011 | 23-May-2011 |
9 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Midwest Corporation Ltd on E20/641 (EXP 7712) dated 18 October 2007 signed by Rachel Ryan, and retained on Department of Industry and Resources file No. T4472/200601;
- "Programme of Work on E20/492, E20/641 and P51/2581 for Sinosteel Midwest Corporation Limited (Reg ID 26317) dated 19 March 2010 signed by Jonathan Stott and retained on Department of Mines and Petroleum File No. 10612/00Vol01
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 24-May-2010 | 29-Mar-2011 |
9 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Midwest Corporation Ltd on E20/641 (EXP 7712) dated 18 October 2007 signed by Rachel Ryan, and retained on Department of Industry and Resources file No. T4472/200601.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 17-Nov-2008 | 23-May-2010 |
10 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 17-Nov-2008 | |
11 | 1 | All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 17-Nov-2008 | |
12 | 1 | At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the Director, Environment Division, DoIR. | 17-Nov-2008 | |
13 | 1 | All rubbish and scrap is to be progressively disposed of in a suitable manner. | 17-Nov-2008 | |
14 | 1 | At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil, deep ripped and revegetated with local native grasses, shrubs and trees to the satisfaction of the Director, Environment Division, DoIR. | 17-Nov-2008 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 10-Aug-2007 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 10-Aug-2007 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 10-Aug-2007 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 10-Aug-2007 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 10-Aug-2007 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 10-Aug-2007 | |
7 | 1 | No interference with Geodetic Survey Station Lulworth and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 10-Aug-2007 | |
8 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Use & Benefit Of Aborigines Reserve 16670. | 10-Aug-2007 | |
9 | 5 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
- "Programme of Work for Midwest Corporation Ltd on E20/641 (EXP 7712) dated 18 October 2007 signed by Rachel Ryan, and retained on Department of Industry and Resources file No. T4472/200601;
- "Programme of Work on E20/492, E20/641 and P51/2581 for Sinosteel Midwest Corporation Limited (Reg ID 26317) dated 19 March 2010 signed by Jonathan Stott and retained on Department of Mines and Petroleum File No. 10612/00Vol01;
- "Programme of Work on E20/642 for Sinosteel Midwest Corporation Limited" (Reg ID 28738) dated 1 November 2010 signed by Jonathan Stott and retained on Department of Mines and Petroleum File No. EARS-POW-28738
- "Programme of Work on E20/641 for Sinosteel Midwest Corporation Limited" (Reg ID 29187) dated 14 December 2010 signed by Jarrad Woodland and retained on Department of Mines and Petroleum File No. EARS-POW-29187;
- (Pow Reg ID 79321) "Sinosteel Midwest Corporation Limited - Environmental Management Plan (Exploration)" dated 11 April 2019 signed by P Hogan, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-79321 as Doc ID 6475965
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 02-May-2019 | |
9 | 4 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Midwest Corporation Ltd on E20/641 (EXP 7712) dated 18 October 2007 signed by Rachel Ryan, and retained on Department of Industry and Resources file No. T4472/200601;
- "Programme of Work on E20/492, E20/641 and P51/2581 for Sinosteel Midwest Corporation Limited (Reg ID 26317) dated 19 March 2010 signed by Jonathan Stott and retained on Department of Mines and Petroleum File No. 10612/00Vol01;
- "Programme of Work on E20/642 for Sinosteel Midwest Corporation Limited" (Reg ID 28738) dated 1 November 2010 signed by Jonathan Stott and retained on Department of Mines and Petroleum File No. EARS-POW-28738
- "Programme of Work on E20/641 for Sinosteel Midwest Corporation Limited" (Reg ID 29187) dated 14 December 2010 signed by Jarrad Woodland and retained on Department of Mines and Petroleum File No. EARS-POW-29187
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 24-May-2011 | 01-May-2019 |
9 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Midwest Corporation Ltd on E20/641 (EXP 7712) dated 18 October 2007 signed by Rachel Ryan, and retained on Department of Industry and Resources file No. T4472/200601;
- "Programme of Work on E20/492, E20/641 and P51/2581 for Sinosteel Midwest Corporation Limited (Reg ID 26317) dated 19 March 2010 signed by Jonathan Stott and retained on Department of Mines and Petroleum File No. 10612/00Vol01;
- "Programme of Work on E20/641 for Sinosteel Midwest Corporation Limited" (Reg ID 29187) dated 14 December 2010 signed by Jarrad Woodland and retained on Department of Mines and Petroleum File No. EARS-POW-29187
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 30-Mar-2011 | 23-May-2011 |
9 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Midwest Corporation Ltd on E20/641 (EXP 7712) dated 18 October 2007 signed by Rachel Ryan, and retained on Department of Industry and Resources file No. T4472/200601;
- "Programme of Work on E20/492, E20/641 and P51/2581 for Sinosteel Midwest Corporation Limited (Reg ID 26317) dated 19 March 2010 signed by Jonathan Stott and retained on Department of Mines and Petroleum File No. 10612/00Vol01
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 24-May-2010 | 29-Mar-2011 |
9 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work for Midwest Corporation Ltd on E20/641 (EXP 7712) dated 18 October 2007 signed by Rachel Ryan, and retained on Department of Industry and Resources file No. T4472/200601.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 17-Nov-2008 | 23-May-2010 |
10 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 17-Nov-2008 | |
11 | 1 | All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 17-Nov-2008 | |
12 | 1 | At the completion of operations, all buildings and structures being removed from site or demolished and buried to the satisfaction of the Director, Environment Division, DoIR. | 17-Nov-2008 | |
13 | 1 | All rubbish and scrap is to be progressively disposed of in a suitable manner. | 17-Nov-2008 | |
14 | 1 | At the completion of operations, or progressively where possible, all access roads and other disturbed areas being covered with topsoil, deep ripped and revegetated with local native grasses, shrubs and trees to the satisfaction of the Director, Environment Division, DoIR. | 17-Nov-2008 | |
Type | Number | Details |
Bond Requirement | 307668 | Requirement Date:17/11/2006Amount:$10,000.00RECORDED:08:41:56 17 November 2006FINALISED:13:45:58 24 May 2010 |
Excess Tonnage | 324062 | Lodged:09:30 28 April 2008for the extraction of an additional 3924 tonnes of materialRECORDED:09:30 28 April 2008GRANTED:10:30 14 May 2008for an additional 3900 tonnes of material |
Bond | 290948 | Lodged on 12 May 2008 For $10,000.00RECORDED 12 May 2008Lodged:00:00 12 May 2008Bond Type:Unconditional Performance BondBond Amount:$10,000.00RECORDED:12 May 2008RETIRED - MRF:19 September 2014 |
Application to Amend | 316907 | Lodged:15:00 30 March 2009Amending:NameFrom:MIDWEST CORPORATION LTDTo:SINOSTEEL MIDWEST CORPORATION LIMITEDRECORDED:15:00 30 March 2009 |
Copy Document | 317756 | Lodged:16:05 08 April 2009ISSUED:16:05 08 April 2009 |
Excess Tonnage | 323128 | Lodged:09:30 08 June 2009for the extraction of an additional 2,868 tonnes of materialRECORDED:09:30 08 June 2009GRANTED:13:04:25 12 March 2010 |
Caveat | 341093 | Lodged:15:55 16 February 2010Caveat Type:Absolute CaveatCaveator:HAMPTON HILL MINING NLShares Caveated:100/100 shares SINOSTEEL MIDWEST CORPORATION LIMITEDRECORDED:15:55 16 February 2010 |
Excess Tonnage | 343606 | Lodged:09:30 26 March 2010for the extraction of an additional 2,778 tonnesRECORDED:09:30 26 March 2010GRANTED:14:18:45 16 April 2010 |
Bond | 347151 | Lodged:10:15 20 May 2010Bond Type:Unconditional Performance BondBond Amount:$9,000.00RECORDED:20 May 2010RETIRED - MRF:19 September 2014 |
Bond Requirement | 347269 | Requirement Date:24/05/2010Amount:$19,000.00RECORDED:13:39:59 24 May 2010FINALISED:09:41 30 March 2011 |
Conversion | 349866 | New Tenement:M 51/869-IApplication Date:08:30 19 May 2010Section:S67Converted 00:00 03 June 2015 being commencement of term of M 51/869-I |
Excess Tonnage | 359348 | Lodged:00:00 12 November 2010for an additional 2,048 tonnes.GRANTED:00:00 18 November 2010 |
Excess Tonnage | 363822 | Lodged:13:50 20 January 2011RECORDED:13:50 20 January 2011Approved for 2,438 additional tonnes.GRANTED:14:53:44 28 January 2011 |
Bond | 364277 | Lodged:09:00 31 January 2011Bond Type:Unconditional Performance BondBond Amount:$10,000.00RECORDED:31 January 2011RETIRED - MRF:19 September 2014 |
Bond | 367785 | Lodged:15:50 17 March 2011Bond Type:Unconditional Performance BondBond Amount:$12,000.00RECORDED:17 March 2011RETIRED - MRF:19 September 2014 |
Bond Requirement | 368399 | Requirement Date:30/03/2011Amount:$41,000.00RECORDED:13:47:33 30 March 2011FINALISED:15:11:04 19 September 2014 |
Extension / Renewal of Term | 401450 | Lodged:15:30 13 July 2012Applied For Period:5 YearsRECORDED:15:30 13 July 2012GRANTED:05 September 2012Granted Period:5 YearsTerm Extended To:09/08/2017 |
Deferral of Drop Off | 402864 | Lodged:15:45 01 August 2012RECORDED:15:45 01 August 2012GRANTED:05 September 2012 |
Expiry - Partial | 470670 | Expired Land:Converted into M51/869Retained Blocks:MEEKATHARRA 2493 sRetained Total:1 BL.EFFECTIVE:00:00 03 July 2015 |
Application to Amend | 490195 | Lodged:13:03:58 07 July 2016Amending:Address (Including DTC Details)From:SINOSTEEL MIDWEST CORPORATION LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:13:03:58 07 July 2016 |
Extension / Renewal of Term | 512205 | Lodged:16:04:09 08 August 2017Applied For Period:2 YearsRECORDED:16:04:09 08 August 2017GRANTED:16 October 2017Granted Period:2 YearsTerm Extended To:09/08/2019 |
Extension / Renewal of Term | 558814 | Lodged:12:15:06 22 July 2019Applied For Period:2 YearsRECORDED:12:15:06 22 July 2019GRANTED:22 October 2019Granted Period:2 YearsTerm Extended To:09/08/2021 |
Application to Amend | 590049 | Lodged:14:30 11 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : SINOSTEEL MIDWEST CORPORATION LIMITED, SAME AS CORRESPONDENCE and DTC :SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : SINOSTEEL MIDWEST CORPORATION LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977REJECTED:14:30 11 November 2020 |
Application to Amend | 590404 | Lodged:16:09:27 13 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : SINOSTEEL MIDWEST CORPORATION LIMITED, SAME AS CORRESPONDENCE and DTC :SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : SINOSTEEL MIDWEST CORPORATION LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :SINOSTEEL MIDWEST CORPORATION LIMITED, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:16:09:27 13 November 2020 |
Extension / Renewal of Term | 629705 | Lodged:14:16:14 05 August 2021Applied For Period:2 YearsRECORDED:14:16:14 05 August 2021GRANTED:14 December 2021Granted Period:2 YearsTerm Extended To:09/08/2023 |
Extension / Renewal of Term | 683278 | Lodged:11:39:12 09 August 2023Applied For Period:2 YearsRECORDED:11:39:12 09 August 2023REFUSED:08 April 2024Licence Expired:08/04/2024 |
Expiry - Full | 700688 | EFFECTIVE:Midnight 08 April 2024 |