Extracted from MTO on 02-Jul-2025 00:31,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 11-Oct-2011 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 26-Mar-2025 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 11-Oct-2011 | 25-Mar-2025 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Oct-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Oct-2011 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 11-Oct-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 11-Oct-2011 | |
7 | 1 | No interference with Geodetic Survey Station G20-8 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 11-Oct-2011 | |
8 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 26-Mar-2025 | |
9 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 26-Mar-2025 | |
10 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 26-Mar-2025 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 11-Oct-2011 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 26-Mar-2025 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 11-Oct-2011 | 25-Mar-2025 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Oct-2011 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Oct-2011 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 11-Oct-2011 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 11-Oct-2011 | |
7 | 1 | No interference with Geodetic Survey Station G20-8 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 11-Oct-2011 | |
8 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 26-Mar-2025 | |
9 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 26-Mar-2025 | |
10 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 26-Mar-2025 | |
Type | Number | Details |
Application to Amend | 323191 | Lodged:09:30 10 June 2009Amending:AddressFrom:PETERSONS, George Juris, 21 KING WILLIAM STREET, SOUTH FREMANTLE, WA, 6162To:PETERSONS, George Juris, C/-, 84 SHAW STREET, COOLGARDIE, WA, 6429RECORDED:09:30 10 June 2009 |
Application to Amend | 370444 | Lodged:16:00 21 April 2011Amending:AddressFrom:PETERSONS, George Juris, C/-, 84 SHAW STREET, COOLGARDIE, WA, 6429To:PETERSONS, George Juris, C/-AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:16:00 21 April 2011 |
Caveat | 421319 | Lodged:11:25 19 April 2013Caveat Type:Consent CaveatCaveator:SILVER LAKE RESOURCES LIMITEDShares Caveated:10/100 shares PETERSONS, George JurisRECORDED:11:25 19 April 2013WITHDRAWN:11:58:19 20 November 2018 |
Caveat | 480389 | Lodged:14:40 18 January 2016Caveat Type:Consent CaveatCaveator:MUSGRAVE MINERALS LIMITEDShares Caveated:90/100 shares SILVER LAKE RESOURCES LIMITEDRECORDED:14:40 18 January 2016WITHDRAWN:08:33:50 03 April 2017 |
Extension / Renewal of Term | 494053 | Lodged:13:54:42 16 September 2016Applied For Period:5 YearsRECORDED:13:54:42 16 September 2016GRANTED:16 January 2017Granted Period:5 YearsTerm Extended To:10/10/2021 |
Amalgamation | 498605 | Lodged:11:25 15 December 2016Amalgamating:Portion of former P 20/2041Situated within:External boundaries of E 20/630Amalgamating:Portion of P 20/2042Situated within:External boundaries of E 20/630Granted 24/07/2017 in respect to P 20/2041Granted 24/07/2017 in respect to P 20/2042 |
Application to Amend | 503632 | Lodged:15:05:40 30 March 2017Amending:Address (Including DTC Details)From:Principal Place of Business : SILVER LAKE RESOURCES LIMITED, SAME AS CORRESPONDENCE and DTC :SILVER LAKE RESOURCES LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : SILVER LAKE RESOURCES LIMITED, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxx866 and DTC :SILVER LAKE RESOURCES LIMITED, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008, xxxxxx@mmwc.com.au, xxxxxxx866RECORDED:15:05:40 30 March 2017 |
Withdrawal of Dealing | 503768 | Lodged:08:33:50 03 April 2017In respect to:Caveat 480389RECORDED:08:33:50 03 April 2017 |
Withdrawal of Dealing | 543075 | Lodged:11:58:19 20 November 2018In respect to:Caveat 421319RECORDED:11:58:19 20 November 2018 |
Extension / Renewal of Term | 633503 | Lodged:16:23:32 04 October 2021Applied For Period:2 YearsRECORDED:16:23:32 04 October 2021GRANTED:06 May 2022Granted Period:2 YearsTerm Extended To:10/10/2023 |
Mortgage | 671795 | Lodged:11:45:01 27 March 2023Mortgaged Shares:80/100 shares CYPRIUM METALS LIMITEDMortgagee:AVIOR ASSET MANAGEMENT NO.2 PTY LTDREGISTERED:11:45:01 27 March 2023DISCHARGED:14:37:54 23 June 2023Full Discharge:679328 Registered 14:37:54 23 June 2023 |
Caveat | 678896 | Lodged:10:40 20 June 2023REJECTED:10:40 20 June 2023 |
Mortgage - Discharge | 679328 | Lodged:14:37:54 23 June 2023In respect to:Mortgage 671795REGISTERED:14:37:54 23 June 2023 |
Withdrawal of Dealing | 679942 | Lodged:14:31:38 30 June 2023In respect to:Caveat 678896REJECTED:14:31:38 30 June 2023 |
Mortgage | 679943 | Lodged:14:31:38 30 June 2023Mortgaged Shares:80/100 shares CYPRIUM METALS LIMITEDMortgagee:GLOBAL LOAN AGENCY SERVICES AUSTRALIA NOMINEES PTY LIMITEDREGISTERED:14:31:38 30 June 2023 |
Extension / Renewal of Term | 687044 | Lodged:10:28:06 02 October 2023Applied For Period:2 YearsRECORDED:10:28:06 02 October 2023GRANTED:14 February 2024Granted Period:2 YearsTerm Extended To:10/10/2025 |