Tenement: E20-627

View on Landtracker Maps (logon required)

Extracted from MTO on 07-Jul-2025 00:59, last changed 18-Jun-2025.

Tenement Summary

Identifier:E 20/627-IType:Exploration Licence
Status:LiveDistrict:CUE
Lodged:MT. MAGNETArea:4 BL
Purposes:Term:5 Years (Extended)
Markout:Received:27-Feb-2006 08:30
Commence:29-Sep-2010 Expiry:28-Sep-2026

Holders

Company NameSharesTotal Shares
SINOSTEEL MIDWEST CORPORATION LIMITED100100

Applicants on Receival

Company NameSharesTotal Shares
MIDWEST CORPORATION LIMITED100100

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Section 120AAConversion 304808FinalisedM 20/493Dead

Shires

Shire NameShire NumberStartArea
MEEKATHARRA SHIRE525027-Feb-2006 3.00000 BL
MURCHISON SHIRE616027-Feb-2006 1.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.29-Sep-2010
22All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.19-Dec-2024
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.29-Sep-2010 18-Dec-2024
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.29-Sep-2010
42Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.19-Dec-2024
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.29-Sep-2010 18-Dec-2024
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.29-Sep-2010
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
29-Sep-2010
71The rights of ingress to and egress from Miscellaneous Licence 20/53 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.29-Sep-2010
81No activities being carried out within the proposed railway corridor (designated FNA 9031) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent.29-Sep-2010
92The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • “Sinosteel Midwest Corporation Limited – Environmental Management Plan (Exploration)” dated 29 September 2021 signed by P. Hogan, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-122884 as Object ID A73805900                  
19-Dec-2024
91The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (POW REG ID 78084) Sinosteel Midwest Corporation Limited – Environmental Management Plan (Exploration)dated 11 April 2019 signed by P. Hogan, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-78084 as Doc ID 6517596                                  
15-May-2019 18-Dec-2024
101All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.19-Dec-2024
111The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request.19-Dec-2024
121All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.19-Dec-2024

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.29-Sep-2010
22All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.19-Dec-2024
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.29-Sep-2010 18-Dec-2024
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.29-Sep-2010
42Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.19-Dec-2024
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.29-Sep-2010 18-Dec-2024
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.29-Sep-2010
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
29-Sep-2010
71The rights of ingress to and egress from Miscellaneous Licence 20/53 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.29-Sep-2010
81No activities being carried out within the proposed railway corridor (designated FNA 9031) that interfere with or restrict any rail route investigation activities being undertaken by the rail line proponent.29-Sep-2010
92The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • “Sinosteel Midwest Corporation Limited – Environmental Management Plan (Exploration)” dated 29 September 2021 signed by P. Hogan, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-122884 as Object ID A73805900                  
19-Dec-2024
91The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (POW REG ID 78084) Sinosteel Midwest Corporation Limited – Environmental Management Plan (Exploration)dated 11 April 2019 signed by P. Hogan, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-78084 as Doc ID 6517596                                  
15-May-2019 18-Dec-2024
101All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.19-Dec-2024
111The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request.19-Dec-2024
121All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.19-Dec-2024

Dealings

TypeNumberDetails
ObjectionMM67/056Lodged 10:37:00 AM on 10 Mar 2006 by MURCHISON METALS LTDRECORDED 10:37 AM 10 Mar 2006WITHDRAWN 11:30 AM 31 Aug 2006
ObjectionMM70/056Lodged 3:44:00 PM on 03 Apr 2006 by ST. BARBARA MINES LTDRECORDED 3:44 PM 03 Apr 2006WITHDRAWN 10:00 AM 21 Sep 2007
Application to Amend316907Lodged:15:00 30 March 2009Amending:NameFrom:MIDWEST CORPORATION LTDTo:SINOSTEEL MIDWEST CORPORATION LIMITEDRECORDED:15:00 30 March 2009
Extension of Time385939Lodged:15:41 25 November 2011Type:Form 5RECORDED:15:41 25 November 2011APPROVED:15:51:14 25 November 2011Time to lodge Form 5 extended to 16 December 2011
Extension / Renewal of Term474564Lodged:08:30 18 September 2015Applied For Period:5 YearsRECORDED:08:30 18 September 2015GRANTED:03 December 2015Granted Period:5 YearsTerm Extended To:28/09/2020
Application to Amend490195Lodged:13:03:58 07 July 2016Amending:Address (Including DTC Details)From:SINOSTEEL MIDWEST CORPORATION LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:13:03:58 07 July 2016
Extension of Time519047Lodged:16:03:11 24 November 2017Type:Form 5RECORDED:16:03:11 24 November 2017APPROVED:17:02:59 01 December 2017Time to lodge extended to 15 Dec 2017
Excess Tonnage546555Lodged:14:30:35 24 January 2019RECORDED:14:30:35 24 January 2019GRANTED:11:25:48 15 February 2019For an additional 315 tonnes
Excess Tonnage570610Lodged:10:00:44 21 January 2020RECORDED:10:00:44 21 January 2020GRANTED:12:14:22 28 April 2020For an additional 1,949 tonnes
Extension / Renewal of Term586980Lodged:12:51:28 24 September 2020Applied For Period:2 YearsRECORDED:12:51:28 24 September 2020GRANTED:05 January 2021Granted Period:2 YearsTerm Extended To:28/09/2022
Application to Amend590049Lodged:14:30 11 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : SINOSTEEL MIDWEST CORPORATION LIMITED, SAME AS CORRESPONDENCE and DTC :SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : SINOSTEEL MIDWEST CORPORATION LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977REJECTED:14:30 11 November 2020
Application to Amend590404Lodged:16:09:27 13 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : SINOSTEEL MIDWEST CORPORATION LIMITED, SAME AS CORRESPONDENCE and DTC :SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : SINOSTEEL MIDWEST CORPORATION LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :SINOSTEEL MIDWEST CORPORATION LIMITED, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:16:09:27 13 November 2020
Extension / Renewal of Term659365Lodged:08:30 23 September 2022Applied For Period:2 YearsRECORDED:08:30 23 September 2022GRANTED:24 February 2023Granted Period:2 YearsTerm Extended To:28/09/2024
Extension / Renewal of Term715170Lodged:16:29:15 19 September 2024Applied For Period:2 YearsRECORDED:16:29:15 19 September 2024GRANTED:09 December 2024Granted Period:2 YearsTerm Extended To:28/09/2026

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202517-Oct-2024 47836025423$3,136.004 BL29-Sep-2010 $3,136.00$0.00
Rental202427-Oct-2023 38074957396$2,988.004 BL29-Sep-2010 $2,988.00$0.00
Rental202301-Sep-2022 10286913$2,844.004 BL29-Sep-2010 $2,844.00$0.00
Rental202207-Sep-2021 10219257$2,708.004 BL29-Sep-2010 $2,708.00$0.00
Rental202131-Aug-2020 10161293$2,460.004 BL29-Sep-2010 $2,460.00$0.00
Rental202030-Aug-2019 10112649$2,404.004 BL29-Sep-2010 $2,404.00$0.00
Rental201931-Aug-2018 7724899872$2,268.004 BL29-Sep-2010 $2,268.00$0.00
Rental201831-Aug-2017 9464908509$2,140.004 BL29-Sep-2010 $2,140.00$0.00
Rental201731-Aug-2016 MT-210010726420-EF$1,093.404 BL29-Sep-2010 $1,093.40$0.00
Rental201616-Sep-2015 MT-210010371450-EF$1,057.404 BL29-Sep-2010 $1,057.40$0.00
Rental201519-Sep-2014 MT-210010205075-EF$759.604 BL29-Sep-2010 $759.60$0.00
Rental201416-Sep-2013 MT-210010133241-EF$740.404 BL29-Sep-2010 $740.40$0.00
Rental201314-Sep-2012 MT-210010063893-EF$466.804 BL29-Sep-2010 $466.80$0.00
Rental201220-Sep-2011 100323PERTH$454.004 BL29-Sep-2010 $454.00$0.00
Rental201128-Sep-2010 14769MT. MAGNET$36.884 BL29-Sep-2010 $405.68$0.00
Rental201127-Feb-2006 3964MT. MAGNET$368.80

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2025$50,000.00false
2024$50,000.0008-Nov-2024 $97,850.00$78,048.00$0.00$0.00$4,192.00$15,610.00$0.00false
2023$50,000.0023-Nov-2023 $81,181.00$64,277.00$0.00$0.00$4,048.00$12,856.00$0.00false
2022$50,000.0016-Nov-2022 $51,844.00$37,664.00$0.00$322.00$3,858.00$10,000.00$0.00false
2021$50,000.0023-Nov-2021 $71,456.00$56,705.00$0.00$0.00$3,410.00$11,341.00$0.00false
2020$50,000.0027-Nov-2020 $36,093.0059100624-Nov-2020 $50,000.00Granted21-Jan-2021 $21,229.00$0.00$1,670.00$3,194.00$10,000.00$0.00false
2019$50,000.0020-Nov-2019 $72,350.50$57,234.08$0.00$0.00$3,058.00$12,058.42$0.00false
2018$50,000.0027-Nov-2018 $114,185.70$85,113.86$0.00$6,982.89$3,058.00$19,030.95$0.00false
2017$30,000.0030-Nov-2017 $61,298.00$42,057.00$0.00$7,183.00$1,842.00$10,216.00$0.00false
2016$30,000.0012-Oct-2016 $35,928.00$28,472.00$0.00$0.00$1,456.00$6,000.00$0.00false
2015$20,000.0029-Oct-2015 $31,491.00$25,982.00$0.00$0.00$1,509.00$4,000.00$0.00false
2014$20,000.0014-Nov-2014 $38,579.00$31,120.00$0.00$2,000.00$1,459.00$4,000.00$0.00false
2013$15,000.0023-Oct-2013 $42,112.37$38,279.57$0.00$0.00$832.80$3,000.00$0.00false
2012$15,000.0017-Oct-2012 $34,731.00$30,964.00$0.00$0.00$767.00$3,000.00$0.00false
2011$15,000.0030-Nov-2011 $111,406.00$107,412.00$0.00$0.00$994.00$3,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
16-Mar-2010 Tenement ApplicationNT Cleared