Extracted from MTO on 11-Jul-2025 00:43,
last changed 05-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 04-May-2008 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 31-Oct-2024 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 04-May-2008 | 30-Oct-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 04-May-2008 | |
4 | 2 | Unless the written approval of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 31-Oct-2024 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 04-May-2008 | 30-Oct-2024 |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 04-May-2008 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 04-May-2008 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 04-May-2008 | |
8 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
- "Programme of Work on P20/2086 and E20/625 for Sinosteel Midwest Corporation Ltd" (Reg ID 29199) dated 16 December 2010 signed by Jarrad Woodland and retained on Department of Mines and Petroleum File No. EARS-POW 29199;
- (PoW RegID 122742) “Sinosteel Midwest Corporation Limited - Environmental Management Plan (Exploration)” dated 29 September 2021 submitted by Sinosteel Midwest Corporation Limited, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-122742 as Object ID A72223769.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 31-Oct-2024 | |
8 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
- "Programme of Work on P20/2086 and E20/625 for Sinosteel Midwest Corporation Ltd" (Reg ID 29199) dated 16 December 2010 signed by Jarrad Woodland and retained on Department of Mines and Petroleum File No. EARS-POW 29199;
- (Pow Reg ID 79321) "Sinosteel Midwest Corporation Limited - Environmental Management Plan (Exploration)" dated 11 April 2019 signed by P Hogan, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-79321 as Doc ID 6475965
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 02-May-2019 | 30-Oct-2024 |
8 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work on P20/2086 and E20/625 for Sinosteel Midwest Corporation Ltd" (Reg ID 29199) dated 16 December 2010 signed by Jarrad Woodland and retained on Department of Mines and Petroleum File No. EARS-POW 29199
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 30-Mar-2011 | 01-May-2019 |
9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 30-Mar-2011 | |
10 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 30-Mar-2011 | |
11 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 31-Oct-2024 | |
12 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 31-Oct-2024 | |
13 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 31-Oct-2024 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 04-May-2008 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 31-Oct-2024 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 04-May-2008 | 30-Oct-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 04-May-2008 | |
4 | 2 | Unless the written approval of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 31-Oct-2024 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 04-May-2008 | 30-Oct-2024 |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 04-May-2008 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 04-May-2008 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 04-May-2008 | |
8 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
- "Programme of Work on P20/2086 and E20/625 for Sinosteel Midwest Corporation Ltd" (Reg ID 29199) dated 16 December 2010 signed by Jarrad Woodland and retained on Department of Mines and Petroleum File No. EARS-POW 29199;
- (PoW RegID 122742) “Sinosteel Midwest Corporation Limited - Environmental Management Plan (Exploration)” dated 29 September 2021 submitted by Sinosteel Midwest Corporation Limited, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-122742 as Object ID A72223769.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 31-Oct-2024 | |
8 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
- "Programme of Work on P20/2086 and E20/625 for Sinosteel Midwest Corporation Ltd" (Reg ID 29199) dated 16 December 2010 signed by Jarrad Woodland and retained on Department of Mines and Petroleum File No. EARS-POW 29199;
- (Pow Reg ID 79321) "Sinosteel Midwest Corporation Limited - Environmental Management Plan (Exploration)" dated 11 April 2019 signed by P Hogan, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-79321 as Doc ID 6475965
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 02-May-2019 | 30-Oct-2024 |
8 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work on P20/2086 and E20/625 for Sinosteel Midwest Corporation Ltd" (Reg ID 29199) dated 16 December 2010 signed by Jarrad Woodland and retained on Department of Mines and Petroleum File No. EARS-POW 29199
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 30-Mar-2011 | 01-May-2019 |
9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 30-Mar-2011 | |
10 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled appropriately for later respreading or immediately respread as rehabilitation progresses. | 30-Mar-2011 | |
11 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 31-Oct-2024 | |
12 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 31-Oct-2024 | |
13 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 31-Oct-2024 | |
Type | Number | Details |
Transfer | 284180 | Transfers 284178 to 284180 were registered on 04 Apr 2008 against E's 20/208, 20/450 and 20/474-I. Pursuant to Section 120AA the applicant details have been amended. |
Caveat | 288146 | Pursuant to Section 120AA, Caveats 288145, 288146 and 288147 by HAMPTON HILL MINING NL in respect to 100/100ths shares in the name of MIDWEST CORPORATION LTD lodged against E20/450-I, E20/474-I and E20/208-I are now effective against this tenement.RECORDED 04 May 2008 |
Application to Amend | 316907 | Lodged:15:00 30 March 2009Amending:NameFrom:MIDWEST CORPORATION LTDTo:SINOSTEEL MIDWEST CORPORATION LIMITEDRECORDED:15:00 30 March 2009 |
Application to Amend | 323728 | Lodged:15:39 19 June 2009Amending:AddressFrom:SINOSTEEL MIDWEST CORPORATION LIMITED, SUITE 2 1ST FLOOR, 32 KINGS PARK ROAD, WEST PERTH, WA, 6005To:SINOSTEEL MIDWEST CORPORATION LIMITED, C/- HETHERINGTON EXPLORATION AND MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849RECORDED:15:39 19 June 2009 |
Excess Tonnage | 336928 | Lodged:09:30 14 December 2009RECORDED:09:30 14 December 2009approved for 2290 excess tonnesGRANTED:00:00 10 March 2010 |
Excess Tonnage | 338152 | Lodged:09:30 07 January 2010RECORDED:09:30 07 January 2010approved for 510 excess tonnesGRANTED:00:00 10 March 2010 |
Conversion | 339251 | New Tenement:M 20/518-IApplication Date:08:30 19 May 2010Section:S67Converted 00:00 03 June 2015 being commencement of term of M 20/518-I |
Excess Tonnage | 354255 | Lodged:10:00 13 August 2010RECORDED:10:00 13 August 2010WITHDRAWN:14:07:08 22 November 2010 |
Excess Tonnage | 359790 | Lodged:13:50 22 November 2010RECORDED:13:50 22 November 2010Approved for 1,005 additional tonnesGRANTED:10:53:16 23 November 2010 |
Excess Tonnage | 362129 | Lodged:11:10 23 December 2010RECORDED:11:10 23 December 2010Approved for 1,749 additional tonnesGRANTED:13:04:13 13 January 2011 |
Bond | 366763 | Lodged:13:15 02 March 2011Bond Type:Unconditional Performance BondBond Amount:$14,000.00RECORDED:02 March 2011RETIRED - MRF:19 September 2014 |
Bond Requirement | 368255 | Requirement Date:30/03/2011Amount:$14,000.00RECORDED:08:47:23 30 March 2011FINALISED:15:09:04 19 September 2014 |
Excess Tonnage | 386819 | Lodged:14:00 07 December 2011RECORDED:14:00 07 December 2011Approved for additional 750 tonnesGRANTED:15:24:11 13 December 2011 |
Extension / Renewal of Term | 422011 | Lodged:15:15:55 30 April 2013Applied For Period:5 YearsRECORDED:15:15:55 30 April 2013GRANTED:02 May 2013Granted Period:5 YearsTerm Extended To:03/05/2018 |
Excess Tonnage | 433665 | Lodged:12:02 17 October 2013RECORDED:12:02 17 October 2013An additional 340 tonnesGRANTED:10:58:03 23 October 2013 |
Partial Surrender - Compulsory | 445318 | Lodged:15:40 01 May 2014Section:Section 65 (3)Surrendered Blocks:MEEKATHARRA 2562 o, p, r, s, t, v
MEEKATHARRA 2563 l, m, n
MEEKATHARRA 2564 dSurrendered Total:10 BL.REGISTERED:Midnight 03 May 2014Surrendered area to be released 08:30:00 03/06/2014 under Section 65 (3)Surrendered area released 08:30:00 03/06/2014 under Section 65 (3) |
Excess Tonnage | 446386 | Lodged:13:34 14 May 2014RECORDED:13:34 14 May 2014An additional 353 tonnesGRANTED:15:17:22 14 May 2014 |
Expiry - Partial | 470665 | Expired Land:Blocks converted to M20/518Retained Blocks:MEEKATHARRA 2493 v
MEEKATHARRA 2562 u, w, x, y, z
MEEKATHARRA 2563 q, r
MEEKATHARRA 2564 e, jRetained Total:10 BL.EFFECTIVE:00:00 03 June 2015 |
Excess Tonnage | 480029 | Lodged:11:29 12 January 2016RECORDED:11:29 12 January 2016GRANTED:11:44:17 01 April 2016Approved for additional 2671 tonnes |
Amalgamation | 489097 | Lodged:15:35 22 June 2016Amalgamating:Portion of P 20/2080-ISituated within:External boundaries of E 20/625-IGranted 22/12/2016 in respect to P 20/2080-I |
Application to Amend | 490195 | Lodged:13:03:58 07 July 2016Amending:Address (Including DTC Details)From:SINOSTEEL MIDWEST CORPORATION LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:13:03:58 07 July 2016 |
Extension / Renewal of Term | 528922 | Lodged:11:46:49 30 April 2018Applied For Period:2 YearsRECORDED:11:46:49 30 April 2018GRANTED:03 August 2018Granted Period:2 YearsTerm Extended To:03/05/2020 |
Extension / Renewal of Term | 577024 | Lodged:10:27:39 30 April 2020Applied For Period:2 YearsRECORDED:10:27:39 30 April 2020GRANTED:26 June 2020Granted Period:2 YearsTerm Extended To:03/05/2022 |
Application to Amend | 590049 | Lodged:14:30 11 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : SINOSTEEL MIDWEST CORPORATION LIMITED, SAME AS CORRESPONDENCE and DTC :SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : SINOSTEEL MIDWEST CORPORATION LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977REJECTED:14:30 11 November 2020 |
Application to Amend | 590404 | Lodged:16:09:27 13 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : SINOSTEEL MIDWEST CORPORATION LIMITED, SAME AS CORRESPONDENCE and DTC :SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : SINOSTEEL MIDWEST CORPORATION LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :SINOSTEEL MIDWEST CORPORATION LIMITED, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:16:09:27 13 November 2020 |
Extension / Renewal of Term | 648346 | Lodged:10:26:46 03 May 2022Applied For Period:2 YearsRECORDED:10:26:46 03 May 2022GRANTED:28 October 2022Granted Period:2 YearsTerm Extended To:03/05/2024 |
Extension / Renewal of Term | 702977 | Lodged:10:46:23 03 May 2024Applied For Period:2 YearsRECORDED:10:46:23 03 May 2024GRANTED:14 August 2024Granted Period:2 YearsTerm Extended To:03/05/2026 |