1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 27-Mar-2007 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 27-Mar-2007 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 27-Mar-2007 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 27-Mar-2007 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 27-Mar-2007 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 27-Mar-2007 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing mining on Use & Benefit Of Aborigines Reserves 16670 & 21805. | 27-Mar-2007 | |
8 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
- "Programme of Work on E20/492, E20/641 and P51/2581 for Sinosteel Midwest Corporation Limited (Reg ID 26317) dated 19 March 2010 signed by Jonathan Stott, and retained on Department of Mines and Petroleum File No. 10612/00Vol01;
- (PoW Reg ID 84789) “Sinosteel Midwest Corporation Limited - Environmental Management Plan (Exploration)” dated 28 November 2019 submitted by Sinosteel Midwest Corporation Limited, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-84789 as Doc ID 7120612;
- (PoW Reg ID 84789) “Programme of Work on E 20/459-I, E 20/492-I, E 20/633-I, E 20/753-I, E 51/1354-I and M 20/403-I, for Sinosteel Midwest Corporation Limited” (REG ID: 84789) dated 20 January 2020 submitted by Roger Kemp, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-84789 as Doc ID 7120615
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 14-May-2020 | |
8 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
- "Programme of Work on E20/492, E20/641 and P51/2581 for Sinosteel Midwest Corporation Limited (Reg ID 26317) dated 19 March 2010 signed by Jonathan Stott, and retained on Department of Mines and Petroleum File No. 10612/00Vol01;
- (Pow Reg ID 79321) "Sinosteel Midwest Corporation Limited - Environmental Management Plan (Exploration)" dated 11 April 2019 signed by P Hogan, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-79321 as Doc ID 6475965
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 02-May-2019 | 13-May-2020 |
8 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work on E20/492, E20/641 and P51/2581 for Sinosteel Midwest Corporation Limited (Reg ID 26317) dated 19 March 2010 signed by Jonathan Stott, and retained on Department of Mines and Petroleum File No. 10612/00Vol01
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 24-May-2010 | 01-May-2019 |
9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 24-May-2010 | |
10 | 1 | All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 24-May-2010 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 27-Mar-2007 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 27-Mar-2007 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 27-Mar-2007 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 27-Mar-2007 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 27-Mar-2007 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 27-Mar-2007 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing mining on Use & Benefit Of Aborigines Reserves 16670 & 21805. | 27-Mar-2007 | |
8 | 3 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
- "Programme of Work on E20/492, E20/641 and P51/2581 for Sinosteel Midwest Corporation Limited (Reg ID 26317) dated 19 March 2010 signed by Jonathan Stott, and retained on Department of Mines and Petroleum File No. 10612/00Vol01;
- (PoW Reg ID 84789) “Sinosteel Midwest Corporation Limited - Environmental Management Plan (Exploration)” dated 28 November 2019 submitted by Sinosteel Midwest Corporation Limited, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-84789 as Doc ID 7120612;
- (PoW Reg ID 84789) “Programme of Work on E 20/459-I, E 20/492-I, E 20/633-I, E 20/753-I, E 51/1354-I and M 20/403-I, for Sinosteel Midwest Corporation Limited” (REG ID: 84789) dated 20 January 2020 submitted by Roger Kemp, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-84789 as Doc ID 7120615
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 14-May-2020 | |
8 | 2 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:
- "Programme of Work on E20/492, E20/641 and P51/2581 for Sinosteel Midwest Corporation Limited (Reg ID 26317) dated 19 March 2010 signed by Jonathan Stott, and retained on Department of Mines and Petroleum File No. 10612/00Vol01;
- (Pow Reg ID 79321) "Sinosteel Midwest Corporation Limited - Environmental Management Plan (Exploration)" dated 11 April 2019 signed by P Hogan, and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-79321 as Doc ID 6475965
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 02-May-2019 | 13-May-2020 |
8 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work on E20/492, E20/641 and P51/2581 for Sinosteel Midwest Corporation Limited (Reg ID 26317) dated 19 March 2010 signed by Jonathan Stott, and retained on Department of Mines and Petroleum File No. 10612/00Vol01
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 24-May-2010 | 01-May-2019 |
9 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 24-May-2010 | |
10 | 1 | All topsoil being removed ahead of all mining operations from sites such as pit areas, waste disposal areas, ore stockpile areas, pipeline, haul roads and new access roads and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 24-May-2010 | |
Type | Number | Details |
Application to Amend | 650H/012 | Lodged 11:20 AM on 14 Feb 2002 amending address to read " Ground floor , 17 Ord St West Perth WA 6005"REGISTERED 11:20 AM 14 Feb 2002 |
Application to Amend | 316907 | Lodged:15:00 30 March 2009Amending:NameFrom:MIDWEST CORPORATION LTDTo:SINOSTEEL MIDWEST CORPORATION LIMITEDRECORDED:15:00 30 March 2009 |
Exemption from Drop-off | 341845 | Lodged:15:55 26 February 2010For relief from the provisions of Section 65(1)(a).RECORDED:15:55 26 February 2010GRANTED:09 March 2010 |
Excess Tonnage | 343607 | Lodged:09:30 26 March 2010for the removal of an extra 2,240 tonnesRECORDED:09:30 26 March 2010GRANTED:14:14:11 16 April 2010 |
Bond | 347147 | Lodged:10:15 20 May 2010Bond Type:Unconditional Performance BondBond Amount:$10,000.00RECORDED:20 May 2010RETIRED - MRF:19 September 2014 |
Bond Requirement | 347268 | Requirement Date:24/05/2010Amount:$10,000.00RECORDED:13:31:23 24 May 2010FINALISED:15:08:07 19 September 2014 |
Conversion | 349866 | New Tenement:M 51/869-IApplication Date:08:30 19 May 2010Section:S67Converted 00:00 03 June 2015 being commencement of term of M 51/869-I |
Caveat | 355628 | Lodged:15:59 15 September 2010Caveat Type:Consent CaveatCaveator:HAMPTON HILL MINING NLShares Caveated:100/100 shares SINOSTEEL MIDWEST CORPORATION LIMITEDRECORDED:15:59 15 September 2010WITHDRAWN:15:38:09 07 April 2017 |
Excess Tonnage | 363830 | Lodged:14:10 20 January 2011RECORDED:14:10 20 January 2011Approved for 458 additional tonnes.GRANTED:14:55:59 28 January 2011 |
Exemption from Drop-off | 366269 | Lodged:15:45 18 February 2011for relief from the provisions of Section 65(1)(b)RECORDED:15:45 18 February 2011GRANTED:28 February 2011 |
Extension / Renewal of Term | 393634 | Lodged:08:30 20 March 2012Applied For Period:2 YearsRECORDED:08:30 20 March 2012GRANTED:26 March 2012Granted Period:2 YearsTerm Extended To:26/03/2014 |
Extension / Renewal of Term | 442851 | Lodged:15:43:42 24 March 2014Applied For Period:2 YearsRECORDED:15:43:42 24 March 2014GRANTED:01 July 2014Granted Period:2 YearsTerm Extended To:26/03/2016 |
Extension / Renewal of Term | 483027 | Lodged:14:30:09 11 March 2016Applied For Period:1 YearsRECORDED:14:30:09 11 March 2016GRANTED:27 May 2016Granted Period:1 YearsTerm Extended To:26/03/2017 |
Amalgamation | 489096 | Lodged:15:35 22 June 2016Amalgamating:Portion of P 20/2016-ISituated within:External boundaries of E 20/492-IAmalgamating:Whole of P 51/2581-ISituated within:External boundaries of E 20/492-IGranted 29/11/2016 in respect to P 20/2016-IGranted 29/11/2016 in respect to P 51/2581-I |
Application to Amend | 490195 | Lodged:13:03:58 07 July 2016Amending:Address (Including DTC Details)From:SINOSTEEL MIDWEST CORPORATION LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:13:03:58 07 July 2016 |
Extension / Renewal of Term | 502712 | Lodged:15:55:52 16 March 2017Applied For Period:1 YearsRECORDED:15:55:52 16 March 2017GRANTED:05 April 2017Granted Period:1 YearsTerm Extended To:26/03/2018 |
Withdrawal of Dealing | 504187 | Lodged:15:38:09 07 April 2017In respect to:Caveat 355628RECORDED:15:38:09 07 April 2017 |
Extension / Renewal of Term | 524444 | Lodged:12:47:58 26 February 2018Applied For Period:1 YearsRECORDED:12:47:58 26 February 2018GRANTED:07 March 2018Granted Period:1 YearsTerm Extended To:26/03/2019 |
Extension / Renewal of Term | 549600 | Lodged:10:27:40 19 March 2019Applied For Period:1 YearsRECORDED:10:27:40 19 March 2019GRANTED:28 May 2019Granted Period:1 YearsTerm Extended To:26/03/2020 |
Extension / Renewal of Term | 574436 | Lodged:08:30 19 March 2020Applied For Period:1 YearsRECORDED:08:30 19 March 2020GRANTED:05 May 2020Granted Period:1 YearsTerm Extended To:26/03/2021 |
Application to Amend | 590049 | Lodged:14:30 11 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : SINOSTEEL MIDWEST CORPORATION LIMITED, SAME AS CORRESPONDENCE and DTC :SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : SINOSTEEL MIDWEST CORPORATION LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxx977REJECTED:14:30 11 November 2020 |
Application to Amend | 590404 | Lodged:16:09:27 13 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : SINOSTEEL MIDWEST CORPORATION LIMITED, SAME AS CORRESPONDENCE and DTC :SINOSTEEL MIDWEST CORPORATION LIMITED, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : SINOSTEEL MIDWEST CORPORATION LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :SINOSTEEL MIDWEST CORPORATION LIMITED, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:16:09:27 13 November 2020 |
Extension / Renewal of Term | 618876 | Lodged:08:30 26 March 2021Applied For Period:1 YearsRECORDED:08:30 26 March 2021GRANTED:30 June 2021Granted Period:1 YearsTerm Extended To:26/03/2022 |
Extension / Renewal of Term | 645276 | Lodged:08:30 22 March 2022Applied For Period:1 YearsRECORDED:08:30 22 March 2022GRANTED:26 July 2022Granted Period:1 YearsTerm Extended To:26/03/2023 |
Extension / Renewal of Term | 671705 | Lodged:12:31:07 24 March 2023RECORDED:12:31:07 24 March 2023REFUSED:07 December 2023Licence Expired:07/12/2023 |
Expiry - Full | 691848 | EFFECTIVE:Midnight 07 December 2023 |