Tenement: E16-503

View on Landtracker Maps (logon required)

Extracted from MTO on 07-Jul-2025 01:40, last changed 26-Jun-2025.

Tenement Summary

Identifier:E 16/503Type:Exploration Licence
Status:LiveDistrict:KUNANALLING
Lodged:ONLINEArea:7 BL
Purposes:Term:5 Years (Extended)
Markout:Received:07-Nov-2017 16:13
Commence:13-Dec-2018 Expiry:12-Dec-2028

Holders

Company NameSharesTotal Shares
BLACK MOUNTAIN GOLD LIMITED100100

Applicants on Receival

Company NameSharesTotal Shares
BLACK MOUNTAIN GOLD LIMITED100100

Shires

Shire NameShire NumberStartArea
COOLGARDIE SHIRE196007-Nov-2017 7.00000 BL

Conditions

#VerTextStartEnd
12All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.03-Jul-2024
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.13-Dec-2018 02-Jul-2024
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.13-Dec-2018
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.13-Dec-2018
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.13-Dec-2018
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
13-Dec-2018
61All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.03-Jul-2024
71All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.03-Jul-2024
81The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request.03-Jul-2024
91All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.03-Jul-2024

Endorsements

Cond #VerTextStartEnd
12All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.03-Jul-2024
11All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety.13-Dec-2018 02-Jul-2024
21All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.13-Dec-2018
31Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.13-Dec-2018
41The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.13-Dec-2018
51The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
13-Dec-2018
61All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.03-Jul-2024
71All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.03-Jul-2024
81The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request.03-Jul-2024
91All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.03-Jul-2024

Dealings

TypeNumberDetails
Application to Amend559636Lodged:12:59:48 01 August 2019Amending:Address (Including DTC Details)From:Principal Place of Business : BLACK MOUNTAIN GOLD LIMITED, PO BOX 1104, NEDLANDS, WA, 6909 and DTC :BLACK MOUNTAIN GOLD LIMITED, BIANCA TAVEIRA, PO BOX 1104, NEDLANDS, WA, 6909, xxxxxx@intermin.com.au, xxxxxxxxx699To:Principal Place of Business : BLACK MOUNTAIN GOLD LIMITED, 163-167 STIRLING HIGHWAY, NEDLANDS, WA, 6009, xxxxxxxxxxxxxx@horizonminerals.com.au, xxxxxxxxx699 and DTC :BLACK MOUNTAIN GOLD LIMITED, BIANCA TAVEIRA, PO BOX 1104, NEDLANDS, WA, 6909, xxxxxxxxxxxxxx@horizonminerals.com.au, xxxxxxxxx699RECORDED:12:59:48 01 August 2019
Application to Amend683876Lodged:15:26:17 17 August 2023Amending:Address (Including DTC Details)From:BLACK MOUNTAIN GOLD LIMITED, BIANCA TAVEIRA, PO BOX 1104, NEDLANDS, WA, 6909, xxxxxxxxxxxxxx@horizonminerals.com.au, xxxxxxxxx699To:BLACK MOUNTAIN GOLD LIMITED, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:15:26:17 17 August 2023
Caveat685979Lodged:09:59:40 14 September 2023Caveat Type:Consent CaveatCaveator:METAL HAWK LIMITEDShares Caveated:100/100 shares BLACK MOUNTAIN GOLD LIMITEDRECORDED:09:59:40 14 September 2023WITHDRAWN:09:48:44 10 December 2024
Extension / Renewal of Term691486Lodged:16:02:15 04 December 2023Applied For Period:5 YearsRECORDED:16:02:15 04 December 2023GRANTED:16 February 2024Granted Period:5 YearsTerm Extended To:12/12/2028
Withdrawal of Dealing721532Lodged:09:48:44 10 December 2024In respect to:Caveat 685979RECORDED:09:48:44 10 December 2024
Partial Surrender - Voluntary721663Lodged:09:46:50 11 December 2024Surrendered Blocks:KALGOORLIE 2313 d, j, o, tSurrendered Total:4 BL.REGISTERED:09:46:50 11 December 2024

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202505-Feb-2025 (REFUND) FIL-57044$1,656.007 BL11-Dec-2024 $2,898.00$0.00
Rental202511-Dec-2024 10720408$4,554.00
Rental202402-Jan-2024 10474940$4,345.0011 BL13-Dec-2018 $4,345.00$0.00
Rental202310-Jan-2023 10316739$3,025.0011 BL13-Dec-2018 $3,025.00$0.00
Rental202210-Dec-2021 10234865$2,882.0011 BL13-Dec-2018 $2,882.00$0.00
Rental202123-Dec-2020 10176717$1,551.0011 BL13-Dec-2018 $1,551.00$0.00
Rental202007-Jan-2020 10128479$1,518.0011 BL13-Dec-2018 $1,518.00$0.00
Rental201907-Nov-2017 78379256361$1,474.0011 BL13-Dec-2018 $1,474.00$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2025$50,000.00false
2024$50,000.0005-Feb-2025 $63,720.13$47,439.13$0.00$0.00$5,661.00$10,620.00$0.00false
2023$30,000.0002-Feb-2024 $82,014.71$58,095.50$0.00$6,247.97$4,002.12$13,669.12$0.00false
2022$30,000.0011-Jan-2023 $34,945.00$25,205.00$0.00$0.00$3,740.00$6,000.00$0.00false
2021$20,000.0002-Feb-2022 $25,396.00$17,656.00$0.00$0.00$3,740.00$4,000.00$0.00false
2020$20,000.0025-Jan-2021 $21,495.00$15,120.00$0.00$0.00$2,375.00$4,000.00$0.00false
2019$20,000.0029-Jan-2020 $20,444.00$13,659.00$0.00$0.00$2,785.00$4,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
28-Dec-2017 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2018-01-242018-05-24CLEARED - Expedited Applies2018-06-1311 BL30440S1204430E47km NW'ly of Coolgardie13GoldfieldsNative Title Services Goldfields