Tenement: E16-497

View on Landtracker Maps (logon required)

Extracted from MTO on 09-Jul-2025 01:19, last changed 08-Jul-2025.

Tenement Summary

Identifier:E 16/497Type:Exploration Licence
Status:LiveDistrict:KUNANALLING
Lodged:ONLINEArea:1 BL
Purposes:Term:5 Years (Extended)
Markout:Received:13-Dec-2016 14:08
Commence:06-Jul-2017 Expiry:05-Jul-2027

Holders

Company NameSharesTotal Shares
BLACK MOUNTAIN GOLD LIMITED100100

Applicants on Receival

Company NameSharesTotal Shares
BLACK MOUNTAIN GOLD LIMITED100100

Shires

Shire NameShire NumberStartArea
COOLGARDIE SHIRE196013-Dec-2016 1.00000 BL

Conditions

#VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.06-Jul-2017
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.06-Jul-2017
31The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.06-Jul-2017
41The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
06-Jul-2017
51All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.06-Jul-2017
61All disturbances to the surface of the land as a result of exploration, including costeans, drill pads, grid lines and access tracks are to avoid any active malleefowl mounds by a minimum of 50m.25-Jul-2022

Endorsements

Cond #VerTextStartEnd
11All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.06-Jul-2017
21Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.06-Jul-2017
31The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.06-Jul-2017
41The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
06-Jul-2017
51All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.06-Jul-2017
61All disturbances to the surface of the land as a result of exploration, including costeans, drill pads, grid lines and access tracks are to avoid any active malleefowl mounds by a minimum of 50m.25-Jul-2022

Dealings

TypeNumberDetails
Application to Amend559636Lodged:12:59:48 01 August 2019Amending:Address (Including DTC Details)From:Principal Place of Business : BLACK MOUNTAIN GOLD LIMITED, 163-167 STIRLING HIGHWAY, NEDLANDS, WA, 6009, xxxxxxxxxxxxxx@intermin.com.au, xxxxxxx534 and DTC :BLACK MOUNTAIN GOLD LIMITED, BIANCA TAVEIRA, PO BOX 1104, NEDLANDS, WA, 6909, xxxxxxxxxxxxxx@intermin.com.au, xxxxxxx534To:Principal Place of Business : BLACK MOUNTAIN GOLD LIMITED, 163-167 STIRLING HIGHWAY, NEDLANDS, WA, 6009, xxxxxxxxxxxxxx@horizonminerals.com.au, xxxxxxxxx699 and DTC :BLACK MOUNTAIN GOLD LIMITED, BIANCA TAVEIRA, PO BOX 1104, NEDLANDS, WA, 6909, xxxxxxxxxxxxxx@horizonminerals.com.au, xxxxxxxxx699RECORDED:12:59:48 01 August 2019
Extension / Renewal of Term651617Lodged:09:13:05 16 June 2022Applied For Period:5 YearsRECORDED:09:13:05 16 June 2022GRANTED:05 September 2022Granted Period:5 YearsTerm Extended To:05/07/2027

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202604-Jul-2025 10858123$480.001 BL06-Jul-2017 $480.00$480.00
Rental202601-Jul-2025 10855465$480.00
Rental202503-Jul-2024 10608921$469.001 BL06-Jul-2017 $469.00$0.00
Rental202413-Jul-2023 10383178$447.001 BL06-Jul-2017 $447.00$0.00
Rental202315-Jul-2022 10275908$426.001 BL06-Jul-2017 $426.00$0.00
Rental202230-Jul-2021 10210650$406.001 BL06-Jul-2017 $406.00$0.00
Rental202131-Jul-2020 10156775$369.001 BL06-Jul-2017 $369.00$0.00
Rental202004-Jul-2019 10103913$361.001 BL06-Jul-2017 $361.00$0.00
Rental201924-Jul-2018 8767175782$341.001 BL06-Jul-2017 $341.00$0.00
Rental201813-Dec-2016 69375900824$311.601 BL06-Jul-2017 $311.60$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2026$20,000.00false
2025$20,000.00false
2024$15,000.0013-Aug-2024 $17,994.73$14,047.12$0.00$0.00$947.61$3,000.00$0.00false
2023$15,000.0021-Aug-2023 $16,458.00$12,574.00$0.00$0.00$884.00$3,000.00$0.00false
2022$10,000.0024-Aug-2022 $15,103.00$12,252.00$0.00$0.00$851.00$2,000.00$0.00false
2021$10,000.0024-Aug-2021 $13,855.00$11,049.00$0.00$0.00$806.00$2,000.00$0.00false
2020$10,000.0026-Aug-2020 $11,468.00$8,636.00$0.00$0.00$832.00$2,000.00$0.00false
2019$10,000.0027-Aug-2019 $10,109.00$7,294.00$0.00$0.00$815.00$2,000.00$0.00false
2018$10,000.0026-Jul-2018 $10,083.00$7,336.00$0.00$0.00$747.00$2,000.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
31-Jan-2017 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2017-02-222017-06-22CLEARED - Expedited Applies2017-07-061 BL303730S1204230E57km NW'ly of Coolgardie13GoldfieldsNative Title Services Goldfields