1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Jul-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Jul-2017 | |
| 1 | In respect to the area of land designated File Notation Area/s FNA 668 and FNA 275 in TENGRAPH the following shall apply: | 03-Jul-2017 | |
3 | 1 | The Licensee not establishing any camp, base works or area, fuelling depot or similar establishment on the Licence area unless the site and access has received prior approval of the Environmental Officer, DMP in agreement with Building Management and Works, Western Australia (BMW).
| 03-Jul-2017 | |
4 | 1 | Prior to any exploration or mining activity, the Licensee preparing a program for each phase of the proposed exploration or mining activity for the approval of the Environmental Officer, DMP in agreement with BMW.
| 03-Jul-2017 | |
5 | 1 | On completion of an exploration/drilling program, the Licensee to report the outcome of the program to DMP in accordance with section 115A of the Mining Act 1978. With the written approval of the Licensee, data about surveyed locations, lithology and depths to basements will be relayed by DMP to BMW.
| 03-Jul-2017 | |
6 | 1 | No use of the Access Road (Access Reserve No. 44102) without entering into an agreement with BMW.
| 03-Jul-2017 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on CR 36208. | 03-Jul-2017 | |
8 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 03-Jul-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Jul-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Jul-2017 | |
| 1 | In respect to the area of land designated File Notation Area/s FNA 668 and FNA 275 in TENGRAPH the following shall apply: | 03-Jul-2017 | |
3 | 1 | The Licensee not establishing any camp, base works or area, fuelling depot or similar establishment on the Licence area unless the site and access has received prior approval of the Environmental Officer, DMP in agreement with Building Management and Works, Western Australia (BMW).
| 03-Jul-2017 | |
4 | 1 | Prior to any exploration or mining activity, the Licensee preparing a program for each phase of the proposed exploration or mining activity for the approval of the Environmental Officer, DMP in agreement with BMW.
| 03-Jul-2017 | |
5 | 1 | On completion of an exploration/drilling program, the Licensee to report the outcome of the program to DMP in accordance with section 115A of the Mining Act 1978. With the written approval of the Licensee, data about surveyed locations, lithology and depths to basements will be relayed by DMP to BMW.
| 03-Jul-2017 | |
6 | 1 | No use of the Access Road (Access Reserve No. 44102) without entering into an agreement with BMW.
| 03-Jul-2017 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on CR 36208. | 03-Jul-2017 | |
8 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 03-Jul-2017 | |
Type | Number | Details |
Application to Amend | 521429 | Lodged:15:00 10 January 2018Amending:NameFrom:SEGUE (SALT CREEK) PTY LTDTo:ARROW (STRICKLAND) PTY LTDRECORDED:15:00 10 January 2018 |
Iron Ore Inclusion | 584126 | Lodged:14:40:21 13 August 2020RECORDED:14:40:21 13 August 2020AUTHORISED:08:48:49 08 October 2020 |
Extension / Renewal of Term | 652557 | Lodged:15:04:15 30 June 2022Applied For Period:5 YearsRECORDED:15:04:15 30 June 2022GRANTED:27 July 2022Granted Period:5 YearsTerm Extended To:02/07/2027 |
Partial Surrender - Voluntary | 677660 | Lodged:10:22:17 02 June 2023Surrendered Blocks:KALGOORLIE 1801 q
KALGOORLIE 1802 s, t, x, y
KALGOORLIE 1873 b, h, o, p, u
KALGOORLIE 1874 d, e, k, p, q, r, v, w, x
KALGOORLIE 1875 q, w
KALGOORLIE 1946 c, j, p
KALGOORLIE 1947 b, c, h, lSurrendered Total:28 BL.REGISTERED:10:22:17 02 June 2023 |