Extracted from MTO on 06-Jul-2025 00:48,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 31-Mar-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 31-Mar-2017 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 31-Mar-2017 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 31-Mar-2017 | |
5 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 31-Mar-2017 | |
6 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks are to avoid any active malleefowl mounds by a minimum of 50m. | 25-Jul-2022 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 31-Mar-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 31-Mar-2017 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 31-Mar-2017 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 31-Mar-2017 | |
5 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 31-Mar-2017 | |
6 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks are to avoid any active malleefowl mounds by a minimum of 50m. | 25-Jul-2022 | |
Type | Number | Details |
Application to Amend | 559636 | Lodged:12:59:48 01 August 2019Amending:Address (Including DTC Details)From:Principal Place of Business : BLACK MOUNTAIN GOLD LIMITED, PO BOX 1104, NEDLANDS, WA, 6909 and DTC :BLACK MOUNTAIN GOLD LIMITED, BIANCA TAVEIRA, PO BOX 1104, NEDLANDS, WA, 6909, xxxxxx@intermin.com.au, xxxxxxx699To:Principal Place of Business : BLACK MOUNTAIN GOLD LIMITED, 163-167 STIRLING HIGHWAY, NEDLANDS, WA, 6009, xxxxxxxxxxxxxx@horizonminerals.com.au, xxxxxxxxx699 and DTC :BLACK MOUNTAIN GOLD LIMITED, BIANCA TAVEIRA, PO BOX 1104, NEDLANDS, WA, 6909, xxxxxxxxxxxxxx@horizonminerals.com.au, xxxxxxxxx699RECORDED:12:59:48 01 August 2019 |
Forfeiture | 560733 | Initiated:15/08/2019 for non-compliance with reporting requirementsRECORDED:08:30 15 August 2019Notice Issued:Regulation 50 Notice sent 15/08/2019 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:19/09/2019FINALISED:Order by Minister on 07 October 2019 that E 16/493 be Penalty Imposed |
Fine | 564207 | Fine in respect to:Forfeiture Process 560733Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$180.00Notification date:07/10/2019Due date:11/11/2019Pursuant to:Section 96A(5)RECORDED:07 October 2019PAYMENT RECEIVED:23 October 2019FINALISED:24 October 2019Receipt Number:10119615Amount:$180.00Remaining balance:$0.00 |
Extension / Renewal of Term | 645238 | Lodged:13:09:47 21 March 2022Applied For Period:5 YearsRECORDED:13:09:47 21 March 2022GRANTED:30 May 2022Granted Period:5 YearsTerm Extended To:30/03/2027 |