Extracted from MTO on 11-Jul-2025 00:43,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 27-Jan-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 27-Jan-2017 | |
3 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 22-Feb-2022 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 27-Jan-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 27-Jan-2017 | |
3 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 22-Feb-2022 | |
Type | Number | Details |
Application to Amend | 572088 | Lodged:12:04:28 11 February 2020Amending:Address (Including DTC Details)From:Principal Place of Business : ALDORO RESOURCES LIMITED, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxx@atmwa.net.au, xxxxxxx699 and DTC :ALDORO RESOURCES LIMITED, NINA MAS, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxx@atmwa.net.au, xxxxxxx699To:Principal Place of Business : ALDORO RESOURCES LIMITED, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913, xxxxxx@mk2consulting.com.au, xxxxxxxxx555 and DTC :ALDORO RESOURCES LIMITED, MKII CONSULTING PTY LTD, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913, xxxxxx@mk2consulting.com.au, xxxxxxxxx555RECORDED:12:04:28 11 February 2020 |
Extension of Time | 621134 | Lodged:16:16:05 23 April 2021Type:Stat DecRECORDED:16:16:05 23 April 2021APPROVED:08:31:08 04 May 2021Extension of time to lodge to 30 April 2021 |
Extension of Time | 621764 | Lodged:10:57:17 05 May 2021Type:Stat DecRECORDED:10:57:17 05 May 2021APPROVED:14:58:56 11 May 2021Time extended to lodge to 14 May 2021 |
Extension / Renewal of Term | 640228 | Lodged:14:18:33 25 January 2022Applied For Period:5 YearsRECORDED:14:18:33 25 January 2022GRANTED:24 March 2022Granted Period:5 YearsTerm Extended To:26/01/2027 |
Partial Surrender - Voluntary | 667649 | Lodged:13:55:21 25 January 2023Surrendered Blocks:KALGOORLIE 2233 h, t, z
KALGOORLIE 2306 a, f, gSurrendered Total:6 BL.REGISTERED:13:55:21 25 January 2023 |
Application to Amend | 710162 | Lodged:11:37:08 23 July 2024Amending:Address (Including DTC Details)From:Principal Place of Business : AURUM RESOURCES LIMITED, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913, xxxxxx@mk2consulting.com.au, xxxxxxxxx555 and DTC :AURUM RESOURCES LIMITED, AURUM RESOURCES LIMTIED, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913, xxxxxx@mk2consulting.com.au, xxxxxxxxx555To:Principal Place of Business : AURUM RESOURCES LIMITED, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :AURUM RESOURCES LIMITED, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:11:37:08 23 July 2024 |