1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 26-Aug-2016 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 26-Jun-2024 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 26-Aug-2016 | 25-Jun-2024 |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 26-Aug-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 26-Aug-2016 | |
5 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 27-Jul-2018 | |
6 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 26-Jun-2024 | |
7 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 26-Jun-2024 | |
8 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 26-Jun-2024 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 26-Aug-2016 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 26-Jun-2024 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 26-Aug-2016 | 25-Jun-2024 |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 26-Aug-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 26-Aug-2016 | |
5 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 27-Jul-2018 | |
6 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 26-Jun-2024 | |
7 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 26-Jun-2024 | |
8 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 26-Jun-2024 | |
Type | Number | Details |
Application to Amend | 489472 | Lodged:11:02 28 June 2016Amending:Address (Including DTC Details)From:GOLDSTAR RESOURCES (WA) PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:GOLDSTAR RESOURCES (WA) PTY LTD, C/- EASTERN GOLDFIELDS LTD, 24 MUMFORD PLACE, BALCATTA, WA, 6021RECORDED:11:02 28 June 2016 |
Forfeiture | 516522 | Initiated:18/10/2017 for non-compliance with rent requirementsRECORDED:09:00 18 October 2017Notice Issued:Regulation 50 Notice sent 18/10/2017 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- non payment of rent.Compliance Date:22/11/2017FINALISED:Order by Minister on 30 November 2017 that E 16/484 be Penalty Imposed |
Forfeiture | 518423 | Initiated:16/11/2017 for non-compliance with reporting requirements( Form 5 )RECORDED:10:01:22 16 November 2017Notice Issued:Regulation 50 Notice sent 16/11/2017 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- non lodgement of Form 5.Compliance Date:21/12/2017FINALISED:Order by Minister on 12 January 2018 that E 16/484 be Penalty Imposed |
Fine | 521581 | Fine in respect to:Forfeiture Process 518423Fine reason:Non-compliance with expenditure obligationsPenalty amount:$360.00Notification date:07/03/2018Due date:11/04/2018Pursuant to:Section 96A(5)RECORDED:12 January 2018PAYMENT RECEIVED:11 April 2018FINALISED:11 April 2018Receipt Number:82707471616Amount:$360.00Remaining balance:$0.00 |
Fine | 521610 | Fine in respect to:Forfeiture Process 516522Fine reason:Non-compliance with rent obligationsPenalty amount:$203.00Notification date:05/12/2017Due date:09/01/2018Pursuant to:Section 96A(5)RECORDED: 05 December 2017PAYMENT RECEIVED: 09 January 2018Receipt Number:FIL-681Amount:$203.00Remaining balance:$0.00FINALISED:12 January 2018 |
Forfeiture | 540665 | Initiated:17/10/2018 for non-compliance with rent requirementsRECORDED:14:35:52 16 October 2018Notice Issued:Regulation 50 Notice sent 17/10/2018 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- non payment of rent.Compliance Date:21/11/2018FINALISED:Order by Minister on 11 December 2018 that E 16/484 be Penalty Imposed |
Application to Amend | 542384 | Lodged:14:40 08 November 2018Amending:Address (Including DTC Details)From:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, SAME AS CORRESPONDENCE and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, C/- EASTERN GOLDFIELDS LTD, 24 MUMFORD PLACE, BALCATTA, WA, 6021To:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, C/- EASTERN GOLDFIELDS LTD, LEVEL 2, 220 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, JACQUILINE LY, C/- EASTERN GOLDFIELDS LTD, PO BOX 7207, CLOISTERS SQUARE, PERTH, WA, 6850RECORDED:14:40 08 November 2018 |
Forfeiture | 542810 | Initiated:22/11/2018 for non-compliance with reporting requirements( Form 5 )RECORDED:08:25 23 November 2018Notice Issued:Regulation 50 Notice sent 22/11/2018 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- late lodgement of Form 5.Compliance Date:28/12/2018FINALISED:Order by Minister on 07 March 2019 that E 16/484 be Penalty Imposed |
Fine | 544429 | Fine in respect to:Forfeiture Process 540665Fine reason:Non-compliance with rent obligationsPenalty amount:$374.00Notification date:11/12/2018Due date:15/01/2019Pursuant to:Section 96A(5)RECORDED:11 December 2018PAYMENT RECEIVED:21 December 2018FINALISED:03 January 2019Receipt Number:10080884Amount:$374.00Remaining balance:$0.00 |
Extension of Time | 545158 | Lodged:16:05 19 December 2018Type:Form 5RECORDED:16:05 19 December 2018REFUSED:09:50:26 10 January 2019 |
Fine | 548800 | Fine in respect to:Forfeiture Process 542810Fine reason:Non-compliance with expenditure obligationsPenalty amount:$180.00Notification date:07/03/2019Due date:11/04/2019Pursuant to:Section 96A(5)RECORDED:07 March 2019PAYMENT RECEIVED:10 April 2019FINALISED:11 April 2019Receipt Number:10091992Amount:$180.00Remaining balance:$0.00 |
Partial Surrender - Voluntary | 551112 | Lodged:15:45 05 April 2019Surrendered Blocks:KALGOORLIE 2313 u
KALGOORLIE 2314 j, o, pSurrendered Total:4 BL.REGISTERED:15:45 05 April 2019 |
Application to Amend | 569164 | Lodged:08:30 19 December 2019Amending:Address (Including DTC Details)From:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, C/- ORA BANDA MINING LTD, LEVEL 1, 2 KINGS PARK ROAD, WEST PERTH, WA, 6005 and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, JACQUILINE LY, PO BOX 464, WEST PERTH, WA, 6872, xxxxxxxxx@orabandamining.com.au, xxxxx548To:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, C/- ORA BANDA MINING LTD, LEVEL 1, 2 KINGS PARK ROAD, WEST PERTH, WA, 6005, xxxxxxxxx@orabandamining.com.au, xxxxx548 and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, JACQUILINE LY, C/- ORA BANDA MINING LTD, PO BOX 464, WEST PERTH, WA, 6872, xxxxxxxxx@orabandamining.com.au, xxxxx548RECORDED:08:30 19 December 2019 |
Application to Amend | 569169 | Lodged:08:30 19 December 2019Amending:Address (Including DTC Details)From:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, C/- EASTERN GOLDFIELDS LTD, LEVEL 2, 220 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, JACQUILINE LY, C/- EASTERN GOLDFIELDS LTD, PO BOX 7207, CLOISTERS SQUARE, PERTH, WA, 6850To:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, C/- ORA BANDA MINING LTD, LEVEL 1, 2 KINGS PARK ROAD, WEST PERTH, WA, 6005 and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, JACQUILINE LY, PO BOX 464, WEST PERTH, WA, 6872, xxxxxxxxx@orabandamining.com.au, xxxxx548RECORDED:08:30 19 December 2019 |
Extension / Renewal of Term | 631121 | Lodged:14:24:01 24 August 2021Applied For Period:5 YearsRECORDED:14:24:01 24 August 2021GRANTED:02 November 2021Granted Period:5 YearsTerm Extended To:25/08/2026 |
Application to Amend | 679993 | Lodged:09:00:59 03 July 2023Amending:Address (Including DTC Details)From:Principal Place of Business : SIBERIA MINING CORPORATION PTY LTD, LEVEL 1, 2 KINGS PARK ROAD, WEST PERTH, WA, 6005 and DTC :SIBERIA MINING CORPORATION PTY LTD, JACQUILINE LY, PO BOX 464, WEST PERTH, WA, 6872, xxxxxxxxx@orabandamining.com.au, xxxxx548To:Principal Place of Business : SIBERIA MINING CORPORATION PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxx997 and DTC :SIBERIA MINING CORPORATION PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxx997RECORDED:09:00:59 03 July 2023 |
Application to Amend | 691099 | Lodged:14:23:51 29 November 2023Amending:Address (Including DTC Details)From:Principal Place of Business : BEACON MINING PTY LTD, 144 VIVIAN STREET, BOULDER, WA, 6432 and DTC :BEACON MINING PTY LTD, 144 VIVIAN STREET, BOULDER, WA, 6432To:Principal Place of Business : BEACON MINING PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxx997 and DTC :BEACON MINING PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxx997RECORDED:14:23:51 29 November 2023 |
Caveat | 693248 | Lodged:12:24:54 22 December 2023Caveat Type:Consent CaveatCaveator:DAVYSTON EXPLORATION PTY LTDShares Caveated:100/100 shares BEACON MINING PTY LTDRECORDED:12:24:54 22 December 2023WITHDRAWN:11:35:30 06 November 2024 |
Withdrawal of Dealing | 718918 | Lodged:11:35:30 06 November 2024In respect to:Caveat 693248RECORDED:11:35:30 06 November 2024 |
Surrender - Outright | 718988 | Lodged:08:30 07 November 2024REGISTERED:08:30 07 November 2024 |