1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 08-Nov-2016 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 04-Sep-2024 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 08-Nov-2016 | 03-Sep-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Nov-2016 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Nov-2016 | |
| 1 | In respect to the area designated as CPL 50 in TENGRAPH the following conditions apply: | 08-Nov-2016 | |
5 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 08-Nov-2016 | |
6 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 08-Nov-2016 | |
7 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 08-Nov-2016 | |
8 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Nov-2016 | |
9 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Nov-2016 | |
10 | 1 | The rights of ingress to and egress from Miscellaneous Licence 16/58 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 08-Nov-2016 | |
11 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 04-Sep-2024 | |
12 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 04-Sep-2024 | |
13 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 04-Sep-2024 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 08-Nov-2016 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 04-Sep-2024 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 08-Nov-2016 | 03-Sep-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 08-Nov-2016 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 08-Nov-2016 | |
| 1 | In respect to the area designated as CPL 50 in TENGRAPH the following conditions apply: | 08-Nov-2016 | |
5 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 08-Nov-2016 | |
6 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 08-Nov-2016 | |
7 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 08-Nov-2016 | |
8 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 08-Nov-2016 | |
9 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 08-Nov-2016 | |
10 | 1 | The rights of ingress to and egress from Miscellaneous Licence 16/58 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 08-Nov-2016 | |
11 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 04-Sep-2024 | |
12 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 04-Sep-2024 | |
13 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 04-Sep-2024 | |
Type | Number | Details |
Objection | 473241 | Lodged:16:25 21 August 2015Objectors:SIBERIA MINING CORPORATION PTY LTDObjection Type:Tenement ApplicationRECORDED:16:25 21 August 2015FINALISED:14:48:59 13 May 2016Wardens Decision Made on:00:00 11 May 2016Wardens Decision Status:Dismissed |
Application to Amend | 489472 | Lodged:11:02 28 June 2016Amending:Address (Including DTC Details)From:GOLDSTAR RESOURCES (WA) PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:GOLDSTAR RESOURCES (WA) PTY LTD, C/- EASTERN GOLDFIELDS LTD, 24 MUMFORD PLACE, BALCATTA, WA, 6021RECORDED:11:02 28 June 2016 |
Forfeiture | 521752 | Initiated:25/01/2018 for non-compliance with rent requirementsRECORDED:13:08:49 16 January 2018Notice Issued:Regulation 50 Notice sent 25/01/2018 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- non payment of rent.Compliance Date:28/02/2018FINALISED:Order by Minister on 15 March 2018 that E 16/483 be Penalty Imposed |
Forfeiture | 524496 | Initiated:28/02/2018 for non-compliance with reporting requirements( Form 5 )RECORDED:09:12:28 27 February 2018Notice Issued:Regulation 50 Notice sent 28/02/2018 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- late lodgement of Form 5.Compliance Date:03/04/2018FINALISED:Order by Minister on 09 April 2018 that E 16/483 be Penalty Imposed |
Fine | 525641 | Fine in respect to:Forfeiture Process 521752Fine reason:Non-compliance with rent obligationsPenalty amount:$257.00Notification date:15/03/2018Due date:19/04/2018Pursuant to:Section 96A(5)RECORDED:15 March 2018PAYMENT RECEIVED:19 April 2018FINALISED:19 April 2018Receipt Number:82924734021Amount:$257.00Remaining balance:$0.00 |
Extension of Time | 526682 | Lodged:11:19 26 March 2018Type:Form 5RECORDED:14:37 28 March 2018REFUSED:15:32:18 03 April 2018 |
Fine | 527394 | Fine in respect to:Forfeiture Process 524496Fine reason:Non-compliance with expenditure obligationsPenalty amount:$90.00Notification date:10/04/2018Due date:14/05/2018Pursuant to:Section 96A(5)RECORDED:09 April 2018PAYMENT RECEIVED:04 May 2018FINALISED:04 May 2018Receipt Number:2008251908Amount:$90.00Remaining balance:$0.00 |
Application to Amend | 542384 | Lodged:14:40 08 November 2018Amending:Address (Including DTC Details)From:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, SAME AS CORRESPONDENCE and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, C/- EASTERN GOLDFIELDS LTD, 24 MUMFORD PLACE, BALCATTA, WA, 6021To:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, C/- EASTERN GOLDFIELDS LTD, LEVEL 2, 220 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, JACQUILINE LY, C/- EASTERN GOLDFIELDS LTD, PO BOX 7207, CLOISTERS SQUARE, PERTH, WA, 6850RECORDED:14:40 08 November 2018 |
Forfeiture | 548182 | Initiated:27/02/2019 for non-compliance with reporting requirements( Form 5 )RECORDED:08:42 27 February 2019Notice Issued:Regulation 50 Notice sent 27/02/2019 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- late lodgement of Form 5.Compliance Date:03/04/2019FINALISED:Order by Minister on 14 March 2019 that E 16/483 be Penalty Imposed |
Fine | 549328 | Fine in respect to:Forfeiture Process 548182Fine reason:Non-compliance with expenditure obligationsPenalty amount:$180.00Notification date:14/03/2019Due date:18/04/2019Pursuant to:Section 96A(5)RECORDED:14 March 2019PAYMENT RECEIVED:19 March 2019FINALISED:20 March 2019Receipt Number:10089476Amount:$180.00Remaining balance:$0.00 |
Partial Surrender - Voluntary | 551111 | Lodged:15:45 05 April 2019Surrendered Blocks:KALGOORLIE 2242 b, c, hSurrendered Total:3 BL.REGISTERED:15:45 05 April 2019 |
Application to Amend | 569164 | Lodged:08:30 19 December 2019Amending:Address (Including DTC Details)From:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, C/- ORA BANDA MINING LTD, LEVEL 1, 2 KINGS PARK ROAD, WEST PERTH, WA, 6005 and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, JACQUILINE LY, PO BOX 464, WEST PERTH, WA, 6872, xxxxxxxxx@orabandamining.com.au, xxxxx548To:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, C/- ORA BANDA MINING LTD, LEVEL 1, 2 KINGS PARK ROAD, WEST PERTH, WA, 6005, xxxxxxxxx@orabandamining.com.au, xxxxx548 and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, JACQUILINE LY, C/- ORA BANDA MINING LTD, PO BOX 464, WEST PERTH, WA, 6872, xxxxxxxxx@orabandamining.com.au, xxxxx548RECORDED:08:30 19 December 2019 |
Application to Amend | 569169 | Lodged:08:30 19 December 2019Amending:Address (Including DTC Details)From:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, C/- EASTERN GOLDFIELDS LTD, LEVEL 2, 220 ST GEORGES TERRACE, PERTH, WA, 6000 and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, JACQUILINE LY, C/- EASTERN GOLDFIELDS LTD, PO BOX 7207, CLOISTERS SQUARE, PERTH, WA, 6850To:Principal Place of Business : GOLDSTAR RESOURCES (WA) PTY LTD, C/- ORA BANDA MINING LTD, LEVEL 1, 2 KINGS PARK ROAD, WEST PERTH, WA, 6005 and DTC :GOLDSTAR RESOURCES (WA) PTY LTD, JACQUILINE LY, PO BOX 464, WEST PERTH, WA, 6872, xxxxxxxxx@orabandamining.com.au, xxxxx548RECORDED:08:30 19 December 2019 |
Extension / Renewal of Term | 635281 | Lodged:12:56:39 05 November 2021Applied For Period:5 YearsRECORDED:12:56:39 05 November 2021GRANTED:07 February 2022Granted Period:5 YearsTerm Extended To:07/11/2026 |
Partial Surrender - Compulsory | 662674 | Lodged:14:49:23 04 November 2022Section:Section 65 (3)Surrendered Blocks:KALGOORLIE 2242 j, lSurrendered Total:2 BL.REGISTERED:Midnight 07 November 2022Surrendered area to be released 08:30:00 09/12/2022 under Section 65 (3)Surrendered area released 08:30:00 09/12/2022 under Section 65 (3) |
Application to Amend | 679993 | Lodged:09:00:59 03 July 2023Amending:Address (Including DTC Details)From:Principal Place of Business : SIBERIA MINING CORPORATION PTY LTD, LEVEL 1, 2 KINGS PARK ROAD, WEST PERTH, WA, 6005 and DTC :SIBERIA MINING CORPORATION PTY LTD, JACQUILINE LY, PO BOX 464, WEST PERTH, WA, 6872, xxxxxxxxx@orabandamining.com.au, xxxxx548To:Principal Place of Business : SIBERIA MINING CORPORATION PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxx997 and DTC :SIBERIA MINING CORPORATION PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxx997RECORDED:09:00:59 03 July 2023 |
Application to Amend | 691099 | Lodged:14:23:51 29 November 2023Amending:Address (Including DTC Details)From:Principal Place of Business : BEACON MINING PTY LTD, 144 VIVIAN STREET, BOULDER, WA, 6432 and DTC :BEACON MINING PTY LTD, 144 VIVIAN STREET, BOULDER, WA, 6432To:Principal Place of Business : BEACON MINING PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxx997 and DTC :BEACON MINING PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxx997RECORDED:14:23:51 29 November 2023 |
Caveat | 693247 | Lodged:12:21:41 22 December 2023Caveat Type:Consent CaveatCaveator:DAVYSTON EXPLORATION PTY LTDShares Caveated:100/100 shares BEACON MINING PTY LTDRECORDED:12:21:41 22 December 2023 |
Caveat | 723356 | Lodged:11:40:32 13 January 2025Caveat Type:Consent CaveatCaveator:SIBERIA MINING CORPORATION PTY LTDShares Caveated:100/100 shares BEACON MINING PTY LTDRECORDED:11:40:32 13 January 2025 |