Extracted from MTO on 27-Feb-2021 03:57,
last changed 25-Dec-2020.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 04-Sep-2014 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 04-Sep-2014 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 04-Sep-2014 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 04-Sep-2014 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 04-Sep-2014 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 04-Sep-2014 | |
| 1 | In respect to the area designated as CPL 50 in TENGRAPH the following conditions apply: | 04-Sep-2014 | |
7 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 04-Sep-2014 | |
8 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 04-Sep-2014 | |
9 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 04-Sep-2014 | |
10 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 04-Sep-2014 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 04-Sep-2014 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 04-Sep-2014 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 04-Sep-2014 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 04-Sep-2014 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 04-Sep-2014 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 04-Sep-2014 | |
| 1 | In respect to the area designated as CPL 50 in TENGRAPH the following conditions apply: | 04-Sep-2014 | |
7 | 1 | Prior to any ground-disturbing activity, as defined by the Executive Director, Environment Division, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Executive Director, Environment Division, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 04-Sep-2014 | |
8 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Executive Director, Environment Division, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 04-Sep-2014 | |
9 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 04-Sep-2014 | |
10 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 04-Sep-2014 | |
Type | Number | Details |
Application to Amend | 440285 | Lodged:08:30 12 February 2014Amending:Other/Non-title changesAmending the application at point "K" on the application form to read 13 blocks to reflect the aggregate blocks applied for.RECORDED:08:30 12 February 2014 |
Application to Amend | 442088 | Lodged:08:30 14 March 2014Amending:Other/Non-title changesAmending the Form 21 at section (k) to read '13 blocks'.RECORDED:08:30 14 March 2014 |
Application to Amend | 447662 | Lodged:13:57:21 30 May 2014Amending:AddressFrom:SANDHU, Tanvanth Singh, 1 COLDSTREAM STREET, WEST LEEDERVILLE, WA, 6007To:SANDHU, Tanvanth Singh, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913RECORDED:13:57:21 30 May 2014 |
Excess Tonnage | 507198 | Lodged:11:33 08 May 2017RECORDED:11:33 08 May 2017GRANTED:08:40:37 13 June 2017An additional 10,000 tonnes |
Extension of Time | 516130 | Lodged:08:30 11 October 2017Type:Form 5RECORDED:08:30 11 October 2017APPROVED:13:44:46 11 October 2017 |
Extension of Time | 516131 | Lodged:08:30 11 October 2017Type:RentRECORDED:08:30 11 October 2017LAPSED:14:21:10 03 November 2017Time extended to 7 November 2017 |
Extension of Time | 540776 | Lodged:12:00 17 September 2018Type:RentRECORDED:12:00 17 September 2018LAPSED:16:09:58 12 November 2018 |
Extension of Time | 539265 | Lodged:08:30 18 September 2018Type:RentRECORDED:08:30 18 September 2018LAPSED:16:01:17 12 November 2018 |
Application for Forfeiture | 540786 | Lodged:14:50 17 October 2018Applicant:OWEN, Tristan DavidRespondent:SANDHU, Tanvanth SinghRECORDED:14:50 17 October 2018 |
Application to Amend | 544969 | Lodged:12:17:55 18 December 2018Amending:Address (Including DTC Details)From:SANDHU, Tanvanth Singh, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913To:SANDHU, Tanvanth Singh, TANVANTH SINGH SANDHU, 12 VLAMINGH PARADE, MOSMAN PARK, WA, 6012, xxxxxxxx@gmail.com, xxxxxxxxx319RECORDED:12:17:55 18 December 2018 |
Application to Amend | 546190 | Lodged:12:59:49 17 January 2019Amending:Address (Including DTC Details)From:SANDHU, Tanvanth Singh, TANVANTH SINGH SANDHU, 12 VLAMINGH PARADE, MOSMAN PARK, WA, 6012, xxxxxxxx@gmail.com, xxxxxxxxx319To:SANDHU, Tanvanth Singh, NINA MAS, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxx@atmwa.net.au, xxxxxxx699RECORDED:12:59:49 17 January 2019 |
Extension / Renewal of Term | 550343 | Lodged:12:04:10 27 March 2019Applied For Period:5 YearsRECORDED:12:04:10 27 March 2019GRANTED:06 February 2020Granted Period:5 YearsTerm Extended To:03/09/2024 |
Partial Surrender - Compulsory | 585220 | Lodged:09:14:39 01 September 2020Section:Section 65 (3)Surrendered Blocks:KALGOORLIE 2098 s, x
KALGOORLIE 2170 h
KALGOORLIE 2171 c, dSurrendered Total:5 BL.REJECTED:09:14:39 01 September 2020 |
Partial Surrender - Compulsory | 585874 | Lodged:11:31:28 10 September 2020Section:Section 65 (3)Surrendered Blocks:KALGOORLIE 2098 s, x
KALGOORLIE 2170 h
KALGOORLIE 2171 c, dSurrendered Total:5 BL.REGISTERED:11:31:28 10 September 2020Surrendered area to be released 08:30:00 09/10/2020 under Section 65 (3)Surrendered area released 08:30:00 09/10/2020 under Section 65 (3) |