Extracted from MTO on 02-Jul-2025 00:49,
last changed 02-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 10-Dec-2010 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 10-Dec-2010 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 10-Dec-2010 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 10-Dec-2010 | |
5 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 10-Dec-2010 | |
| 1 | In respect to the area designated as CPL 50 in TENGRAPH the following conditions apply: | 10-Dec-2010 | |
6 | 1 | Prior to any ground-disturbing activity, as defined by the Director, Environment, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Director, Environment, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 10-Dec-2010 | |
7 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Director, Environment, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 10-Dec-2010 | |
8 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 10-Dec-2010 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 10-Dec-2010 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 10-Dec-2010 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 10-Dec-2010 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 10-Dec-2010 | |
5 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 10-Dec-2010 | |
| 1 | In respect to the area designated as CPL 50 in TENGRAPH the following conditions apply: | 10-Dec-2010 | |
6 | 1 | Prior to any ground-disturbing activity, as defined by the Director, Environment, DMP the licensee preparing a detailed program for each phase of proposed exploration for approval of the Director, Environment, DMP. The program to include:- maps and/or aerial photographs showing all proposed routes, construction and upgrading of tracks, camps, drill sites and any other disturbances;
- the purpose, specifications and life of all proposed disturbances;
- proposals which may disturb any declared rare or geographically restricted flora and fauna; and
- techniques, prescriptions and timetable for the rehabilitation of all proposed disturbances
| 10-Dec-2010 | |
7 | 1 | The licensee, at his expense, rehabilitating all areas cleared, explored or otherwise disturbed during the term of the licence to the satisfaction of the Director, Environment, DMP. Such rehabilitation as is appropriate and may include:- stockpiling and return of topsoil;
- backfilling all holes, trenches and costeans;
- ripping;
- contouring to the original landform;
- revegetation with seed; and
- capping and backfilling of all drill holes.
| 10-Dec-2010 | |
8 | 1 | Prior to the cessation of exploration/prospecting activity the licensee notifying the Environmental Officer, DMP and arranging an inspection as required. | 10-Dec-2010 | |
Type | Number | Details |
Extension of Time | 344384 | Lodged:10:38 08 April 2010Type:AdvertRECORDED:10:38 08 April 2010APPROVED:09:45 20 April 2010 |
Excess Tonnage | 368169 | Lodged:00:00 23 March 2011RECORDED:00:00 23 March 2011For an additional 3500 tonnes for the purpose of Scraping, Detecting and Dryblowing.GRANTED:00:00 24 March 2011 |
Excess Tonnage | 435010 | Lodged:00:00 12 November 2013RECORDED:00:00 12 November 2013GRANTED:08:30 18 December 2013For additional 9212 tonnes |
Application to Amend | 447662 | Lodged:13:57:21 30 May 2014Amending:AddressFrom:SANDHU, Tanvanth Singh, C/- M & M WALTER CONSULTING, PO BOX 8197, SUBIACO EAST, WA, 6008To:SANDHU, Tanvanth Singh, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913RECORDED:13:57:21 30 May 2014 |
Excess Tonnage | 477154 | Lodged:00:00 09 November 2015RECORDED:00:00 09 November 2015For an additional ten thousand (10,000) tonnes of material for the purposes of scraping, detecting, dry blowing and costean/trenching activities.GRANTED:12:03:07 09 November 2015 |
Extension / Renewal of Term | 478738 | Lodged:16:18:28 09 December 2015Applied For Period:5 YearsRECORDED:16:18:28 09 December 2015GRANTED:08 March 2016Granted Period:5 YearsTerm Extended To:09/12/2020 |
Forfeiture | 483433 | Initiated:21/03/2016 for non-compliance with reporting requirements( Form 5 )RECORDED:11:53:45 18 March 2016Notice Issued:Regulation 50 Notice sent 21/03/2016 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- late lodgement of Form 5.Compliance Date:11/05/2016WITHDRAWN:20 April 2016 (Extension of Time approved.) |
Extension of Time | 485400 | Lodged:13:41 31 March 2016Type:Form 5RECORDED:13:41 31 March 2016APPROVED:13:45 20 April 2016 |
Excess Tonnage | 500238 | Lodged:00:00 23 January 2017RECORDED:00:00 23 January 2017For an additional 10,000 tonnes of material for the purposes of scraping, detecting, dry blowing and costean activities.GRANTED:09:16:28 24 January 2017 |
Extension of Time | 500879 | Lodged:16:15:51 07 February 2017Type:Form 5RECORDED:16:15:51 07 February 2017APPROVED:08:59:34 13 February 2017Time extended to 17 February 2017 |
Excess Tonnage | 524453 | Lodged:13:30 26 February 2018RECORDED:13:30 26 February 2018WITHDRAWN:08:30 15 March 2018 |
Excess Tonnage | 525638 | Lodged:08:30 15 March 2018RECORDED:08:30 15 March 2018An additional 16,288 tonnesGRANTED:11:57:05 08 May 2018 |
Conversion | 543536 | New Tenement:M 16/567Application Date:12:15:57 19 Nov 2018Section:S67Converted 00:00 04 March 2022 being commencement of term of M 16/567Retained Blocks:KALGOORLIE 2097 e, k, o, p, t
KALGOORLIE 2098 a, fRetained Total:7 |
Excess Tonnage | 544997 | Lodged:14:36 17 December 2018RECORDED:14:36 17 December 2018WITHDRAWN:16:15 13 March 2019 |
Application to Amend | 544969 | Lodged:12:17:55 18 December 2018Amending:Address (Including DTC Details)From:SANDHU, Tanvanth Singh, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913To:SANDHU, Tanvanth Singh, TANVANTH SINGH SANDHU, 12 VLAMINGH PARADE, MOSMAN PARK, WA, 6012, xxxxxxxx@gmail.com, xxxxxxxxx319RECORDED:12:17:55 18 December 2018 |
Application to Amend | 546190 | Lodged:12:59:49 17 January 2019Amending:Address (Including DTC Details)From:Principal Residence : SANDHU, Tanvanth Singh, SAME AS CORRESPONDENCE and DTC :SANDHU, Tanvanth Singh, TANVANTH SINGH SANDHU, 12 VLAMINGH PARADE, MOSMAN PARK, WA, 6012, xxxxxxxx@gmail.com, xxxxxxxxx319To:Principal Residence : SANDHU, Tanvanth Singh, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxx@atmwa.net.au, xxxxxxx699 and DTC :SANDHU, Tanvanth Singh, NINA MAS, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxx@atmwa.net.au, xxxxxxx699RECORDED:12:59:49 17 January 2019 |
Excess Tonnage | 549804 | Lodged:12:34 14 March 2019RECORDED:12:34 14 March 2019WITHDRAWN:14:46 03 April 2019 |
Excess Tonnage | 563645 | Lodged:08:30 26 September 2019RECORDED:08:30 26 September 2019GRANTED:11:52:39 06 November 2019An additional 20,000 tonnes |
Application for Forfeiture | 569411 | Lodged:15:04 20 December 2019Applicant:OWEN, Tristan DavidRespondent:SANDHU, Tanvanth SinghRECORDED:15:04 20 December 2019[2021] WAMW 15 Decision by Warden Wilson. Application for Forfeiture is dismissed.Warden's Determination:Dismissed 17/09/2021 14:02:00 |
Extension / Renewal of Term | 589847 | Lodged:12:15:02 09 November 2020Applied For Period:2 YearsRECORDED:12:15:02 09 November 2020GRANTED:12 February 2021Granted Period:2 YearsTerm Extended To:09/12/2022 |
Excess Tonnage | 621203 | Lodged:11:11 27 April 2021RECORDED:11:11 27 April 2021GRANTED:16:38 13 May 2021An additional 10,000 tonnes |
Application to Amend | 639215 | Lodged:14:32:10 13 January 2022Amending:Address (Including DTC Details)From:Principal Place of Business : GOLD TIGER HOLDINGS (AUSTRALIA) PTY LTD, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024 and DTC :GOLD TIGER HOLDINGS (AUSTRALIA) PTY LTD, NINA MAS, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxx@atmwa.net.au, xxxxxxx699To:Principal Place of Business : GOLD TIGER HOLDINGS (AUSTRALIA) PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :GOLD TIGER HOLDINGS (AUSTRALIA) PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:14:32:10 13 January 2022 |
Application to Amend | 643655 | Lodged:12:33:40 11 March 2022Amending:Address (Including DTC Details)From:Principal Place of Business : GOLD TIGER HOLDINGS (AUSTRALIA) PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :GOLD TIGER HOLDINGS (AUSTRALIA) PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400To:Principal Place of Business : GOLD TIGER HOLDINGS (AUSTRALIA) PTY LTD, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxx@atmwa.net.au, xxxxxxx699 and DTC :GOLD TIGER HOLDINGS (AUSTRALIA) PTY LTD, NINA MAS, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxx@atmwa.net.au, xxxxxxx699RECORDED:12:33:40 11 March 2022 |
Application for Forfeiture | 651387 | Lodged:15:08:57 13 June 2022Respondent:GOLD TIGER HOLDINGS (AUSTRALIA) PTY LTDApplicant:ASHCROFT RESOURCES PTY LTDRECORDED:15:08:57 13 June 2022Warden's Determination:Dismissed 04/12/2023 10:00:001. Applications for forfeiture 651386 and 651387 be dismissed.2. There is no order as to costs.Warden:McPhee |
Extension / Renewal of Term | 664092 | Lodged:15:22:35 28 November 2022Applied For Period:2 YearsRECORDED:15:22:35 28 November 2022GRANTED:11 January 2023Granted Period:2 YearsTerm Extended To:09/12/2024 |
Interlocutory Application | 684149 | Lodged:15:26 21 August 2023Applicant:OWEN, Tristan DavidRespondent:SANDHU, Tanvanth SinghAffecting:Application for Forfeiture 569411 E 16/396RECORDED:15:26 21 August 2023Outcome:Dismissed 22/05/2024 11:49:001. Interlocutory Application is dismissed.2. The Applicant pay the Respondents costs of application.Warden:Maughan |
Extension / Renewal of Term | 720435 | Lodged:09:24:21 26 November 2024RECORDED:09:24:21 26 November 2024LAPSED:17 April 2025 |
Application for Forfeiture | 728672 | Lodged:15:07:57 18 March 2025for year ending 9 December 2024Applicant:ASHCROFT, Sean CameronRespondent:GOLD TIGER HOLDINGS (AUSTRALIA) PTY LTDRECORDED:15:07:57 18 March 2025Warden's Determination:Dismissed 18/06/2025 16:30:001. Application for Forfeiture 728672 be dismissed.2. There is no order as to costs.Warden:DaviesOutright surrender 731441 - 14-day prior right notice Delivered 07/05/2025 |
Surrender - Outright | 731441 | Lodged:11:59:56 17 April 2025REGISTERED:11:59:56 17 April 2025Application for Forfeiture 728672 - 14-day prior right notice Delivered 07/05/2025 |