Tenement: E15-983

View on Landtracker Maps (logon required)

Extracted from MTO on 07-Jul-2025 00:54, last changed 28-Jun-2025.

Tenement Summary

Identifier:E 15/983Type:Exploration Licence
Status:DeadDistrict:COOLGARDIE
Lodged:COOLGARDIEArea:8 BL
Purposes:Term:5 Years (Extended)
Markout:Received:29-Jan-2007 08:30
Commence:15-Apr-2009 Expiry:14-Apr-2021

Holders

Company NameSharesTotal Shares
ST IVES GOLD MINING COMPANY PTY LIMITED100100

Applicants on Receival

Company NameSharesTotal Shares
SOUTH KAL MINES PTY LTD100100

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Section 120AAConversion 259281FinalisedM 15/1140Dead
Section 120AAConversion 259281FinalisedM 15/1155Dead
Amalgamation (Same Holder)Amalgamation 469687GrantedP 15/4969Dead
Amalgamation (Different holder)Amalgamation 519933WithdrawnP 15/5980Dead

Shires

Shire NameShire NumberStartArea
COOLGARDIE SHIRE196029-Jan-2007 8.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.15-Apr-2009
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.15-Apr-2009
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.15-Apr-2009
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.15-Apr-2009
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.15-Apr-2009
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
15-Apr-2009
71The rights of ingress to and egress from Miscellaneous Licence 15/75 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.15-Apr-2009
81The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Unnumbered Land Act 11.15-Apr-2009
91No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land 10 as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978.15-Apr-2009
101No surface excavation approaching closer to the boundary of the Safety Zone established by Condition (9) hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DMP.15-Apr-2009
111Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition (9) hereof being approved by the State Mining Engineer, DMP in consultation with the operator of the railway on corridor land.15-Apr-2009
121No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition (9) hereof without the prior approval of the operator of the railway on corridor land.15-Apr-2009
131The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition (9) hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DMP.15-Apr-2009
141No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods Safety Branch, DMP.15-Apr-2009
151The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA.15-Apr-2009
161Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land.15-Apr-2009
171No mining within 25 metres of either side of the Goldfields Pipeline Licence 27 as shown in TENGRAPH.
15-Apr-2009
181No surface excavation approaching closer to the boundary of the Safety Zone established by condition {17} hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP15-Apr-2009
191No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 17 hereof without the prior approval of the operators of the Pipeline Licence 27.15-Apr-2009
201The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 17 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP15-Apr-2009
211No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 27  without the prior written consent of the State Mining Engineer DMP.15-Apr-2009
221Mining on the Safety Zone established in Condition 17 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP .15-Apr-2009
231The rights of ingress to and egress from the pipeline easement established in Condition 17 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 27.
15-Apr-2009
241Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 27.15-Apr-2009
251Consent to explore on Resting Place for Travellers and Stock Reserve 17477 granted on 15/04/2009.
15-Apr-2009
1Consent to mine on Kambalda Nature Reserve No. 33300 granted by the Minister responsible for the Mining Act 1978 subject to the following conditions.15-Apr-2009
261Prior to accessing the reserve the licensee consulting with and ensuring that, where required by the Regional/District Manager, Department of Environment and Conservation (DEC), all vehicles, machinery and equipment entering the area are cleaned down to remove soil and plant propagules and adhering to such conditions specified by the Regional/District Manager, DEC, for the prevention of the spread of soil borne diseases.15-Apr-2009
271Access to and from and the movement of vehicles and personnel being restricted to ground or seasonal conditions and routes approved by the Regional/District Manager, DEC.15-Apr-2009
281The Regional/District Manager, DEC, being supplied with an itinerary and program of the locations of operations on the licence area and informed at least seven days in advance of any changes to that itinerary.15-Apr-2009
291Prior to any activity not specified as "environmental disturbance" the licensee preparing a program for each phase of the proposed exploration for approval of the Director, Environment, DMP in agreement with the Regional/District Manager, DEC.15-Apr-2009
301Prior to any environmental disturbance, (as defined by the Director, Environment, DMP in agreement with the Executive Director, Department of Environment and Conservation (DEC), the Conservation Commission of WA (CCWA) and the Environmental Protection Authority), the licensee preparing a detailed program for each phase of proposed exploration for approval of the Director, Environment, DMP in agreement with the Regional/District Manager, DEC and the CCWA. This process may result in additional conditions being imposed together with a requirement to lodge an Unconditional Performance Bond if required. This program to describe the environmental impacts and programs for their management and is to include the following :
  • maps and/or aerial photographs showing the proposed locations of all ground activities and disturbances;
  • the purpose, specifications and extent of each activity and disturbance;
  • descriptions of all vegetation types (in general terms), land forms, and unusual features likely to be disturbed by such proposed disturbances. The Regional/District Manager, DEC, specifying the level of vegetation description;
  • details on proposals that may disturb sensitive terrestrial habitats including any declared rare flora and fauna if applicable;
  • techniques, prescriptions, and timetable for rehabilitation of all proposed disturbances;
  • undertaking for corrective measures for failed rehabilitation;
  • details of water requirements from within the reserve;
  • details of refuse disposal; and
  • proposals for instruction and supervision of personnel and contractors in respect to environmental conditions.
15-Apr-2009
311All rehabilitation being to the satisfaction of the Director, Environment, DMP in agreement with the Regional/District Manager, DEC.15-Apr-2009
321At agreed intervals, not greater than 12 monthly, the licensee reporting to the Director, Environment, DMP and the Regional/District Manager, DEC, on the progress of the operation and the rehabilitation program.15-Apr-2009
331Prior to the cessation of the exploration/prospecting activity in the reserve, the licensee notifying the Environmental Officer, DMP and the Regional/ District Manager, DEC, and arranging an inspection as required.15-Apr-2009
341The licensee making provision to prevent spillage of fuel and discharge of pollutants generally and for all exploration sites being kept free from any rubbish and being left in a clean and tidy state.15-Apr-2009
351The licensee not establishing any camp, base works or area, fuelling depot or similar establishment on the licence area unless the site and access has received prior approval of the Director, Environment, DMP in agreement with the Regional/District Manager, DEC.15-Apr-2009
361Domestic animals, traps, or firearms not being taken onto the reserve.15-Apr-2009

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.15-Apr-2009
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.15-Apr-2009
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.15-Apr-2009
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.15-Apr-2009
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.15-Apr-2009
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
15-Apr-2009
71The rights of ingress to and egress from Miscellaneous Licence 15/75 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.15-Apr-2009
81The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Unnumbered Land Act 11.15-Apr-2009
91No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land 10 as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978.15-Apr-2009
101No surface excavation approaching closer to the boundary of the Safety Zone established by Condition (9) hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DMP.15-Apr-2009
111Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition (9) hereof being approved by the State Mining Engineer, DMP in consultation with the operator of the railway on corridor land.15-Apr-2009
121No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition (9) hereof without the prior approval of the operator of the railway on corridor land.15-Apr-2009
131The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition (9) hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DMP.15-Apr-2009
141No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods Safety Branch, DMP.15-Apr-2009
151The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA.15-Apr-2009
161Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land.15-Apr-2009
171No mining within 25 metres of either side of the Goldfields Pipeline Licence 27 as shown in TENGRAPH.
15-Apr-2009
181No surface excavation approaching closer to the boundary of the Safety Zone established by condition {17} hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP15-Apr-2009
191No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 17 hereof without the prior approval of the operators of the Pipeline Licence 27.15-Apr-2009
201The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 17 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP15-Apr-2009
211No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 27  without the prior written consent of the State Mining Engineer DMP.15-Apr-2009
221Mining on the Safety Zone established in Condition 17 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP .15-Apr-2009
231The rights of ingress to and egress from the pipeline easement established in Condition 17 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 27.
15-Apr-2009
241Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 27.15-Apr-2009
251Consent to explore on Resting Place for Travellers and Stock Reserve 17477 granted on 15/04/2009.
15-Apr-2009
1Consent to mine on Kambalda Nature Reserve No. 33300 granted by the Minister responsible for the Mining Act 1978 subject to the following conditions.15-Apr-2009
261Prior to accessing the reserve the licensee consulting with and ensuring that, where required by the Regional/District Manager, Department of Environment and Conservation (DEC), all vehicles, machinery and equipment entering the area are cleaned down to remove soil and plant propagules and adhering to such conditions specified by the Regional/District Manager, DEC, for the prevention of the spread of soil borne diseases.15-Apr-2009
271Access to and from and the movement of vehicles and personnel being restricted to ground or seasonal conditions and routes approved by the Regional/District Manager, DEC.15-Apr-2009
281The Regional/District Manager, DEC, being supplied with an itinerary and program of the locations of operations on the licence area and informed at least seven days in advance of any changes to that itinerary.15-Apr-2009
291Prior to any activity not specified as "environmental disturbance" the licensee preparing a program for each phase of the proposed exploration for approval of the Director, Environment, DMP in agreement with the Regional/District Manager, DEC.15-Apr-2009
301Prior to any environmental disturbance, (as defined by the Director, Environment, DMP in agreement with the Executive Director, Department of Environment and Conservation (DEC), the Conservation Commission of WA (CCWA) and the Environmental Protection Authority), the licensee preparing a detailed program for each phase of proposed exploration for approval of the Director, Environment, DMP in agreement with the Regional/District Manager, DEC and the CCWA. This process may result in additional conditions being imposed together with a requirement to lodge an Unconditional Performance Bond if required. This program to describe the environmental impacts and programs for their management and is to include the following :
  • maps and/or aerial photographs showing the proposed locations of all ground activities and disturbances;
  • the purpose, specifications and extent of each activity and disturbance;
  • descriptions of all vegetation types (in general terms), land forms, and unusual features likely to be disturbed by such proposed disturbances. The Regional/District Manager, DEC, specifying the level of vegetation description;
  • details on proposals that may disturb sensitive terrestrial habitats including any declared rare flora and fauna if applicable;
  • techniques, prescriptions, and timetable for rehabilitation of all proposed disturbances;
  • undertaking for corrective measures for failed rehabilitation;
  • details of water requirements from within the reserve;
  • details of refuse disposal; and
  • proposals for instruction and supervision of personnel and contractors in respect to environmental conditions.
15-Apr-2009
311All rehabilitation being to the satisfaction of the Director, Environment, DMP in agreement with the Regional/District Manager, DEC.15-Apr-2009
321At agreed intervals, not greater than 12 monthly, the licensee reporting to the Director, Environment, DMP and the Regional/District Manager, DEC, on the progress of the operation and the rehabilitation program.15-Apr-2009
331Prior to the cessation of the exploration/prospecting activity in the reserve, the licensee notifying the Environmental Officer, DMP and the Regional/ District Manager, DEC, and arranging an inspection as required.15-Apr-2009
341The licensee making provision to prevent spillage of fuel and discharge of pollutants generally and for all exploration sites being kept free from any rubbish and being left in a clean and tidy state.15-Apr-2009
351The licensee not establishing any camp, base works or area, fuelling depot or similar establishment on the licence area unless the site and access has received prior approval of the Director, Environment, DMP in agreement with the Regional/District Manager, DEC.15-Apr-2009
361Domestic animals, traps, or firearms not being taken onto the reserve.15-Apr-2009

Dealings

TypeNumberDetails
Extension of Time262393Lodged on 21 Feb 2007 to serve Pastoralist and Chief Executive.Approved by the Warden on 16 Mar 2007
Extension of Time273994Lodged 10:20 AM on 03 Aug 2007 to lodge late service on grazing lease holder.Approved by the Warden on 04 Sep 2007
Transfer285529Transfer 285529 was registered on 07 Mar 2008 against E 15/320. Pursuant to Section 120AA the applicant details have been amended.
Application to Amend434630Lodged:13:42:31 06 November 2013Amending:AddressFrom:BHP BILLITON NICKEL WEST PTY LTD, C/- LAND SERVICES, PO BOX 8301, PERTH BUSINESS CENTRE, WA, 6849To:BHP BILLITON NICKEL WEST PTY LTD, C/- TENEMENTS, PO BOX 628, WEST PERTH, WA, 6872RECORDED:13:42:31 06 November 2013
Extension / Renewal of Term443568Lodged:08:30 04 April 2014Applied For Period:5 YearsRECORDED:08:30 04 April 2014GRANTED:16 June 2014Granted Period:5 YearsTerm Extended To:14/04/2019
Partial Surrender - Compulsory465580Lodged:14:21:51 13 April 2015Section:Section 65 (3)Surrendered Blocks:KALGOORLIE 2611 y, z KALGOORLIE 2683 d, e KALGOORLIE 2684 aSurrendered Total:5 BL.REGISTERED:Midnight 14 April 2015Surrendered area to be released 08:30:00 15/05/2015 under Section 65 (3)Surrendered area released 08:30:00 15/05/2015 under Section 65 (3)
Amalgamation469687Lodged:10:25 19 June 2015Amalgamating:Portion of P 15/4969Situated within:External boundaries of E 15/983Granted 01/12/2015 in respect to P 15/4969
Application to Amend493044Lodged:09:42:29 30 August 2016Amending:Address (Including DTC Details)From:ST IVES GOLD MINING COMPANY PTY LIMITED, C/- TENEMENTS, PO BOX 628, WEST PERTH, WA, 6872To:ST IVES GOLD MINING COMPANY PTY LIMITED, GEMMA GLASS / RACHAEL CHALMERS, C/- TENEMENTS, PO BOX 628, WEST PERTH, WA, 6872, xxxxxxxxxxxxxx@goldfields.com, xxxxx204RECORDED:09:42:29 30 August 2016
Amalgamation519933Lodged:09:10 12 December 2017Amalgamating:Whole of former P 15/5980Situated within:External boundaries of E 15/983Withdrawn 12/12/2017 in respect to P 15/5980
Extension / Renewal of Term551466Lodged:16:06:29 11 April 2019Applied For Period:2 YearsRECORDED:16:06:29 11 April 2019GRANTED:05 November 2019Granted Period:2 YearsTerm Extended To:14/04/2021
Application to Amend616447Lodged:14:27:01 23 February 2021Amending:Address (Including DTC Details)From:ST IVES GOLD MINING COMPANY PTY LIMITED, GEMMA GLASS / RACHAEL CHALMERS, C/- TENEMENTS, PO BOX 628, WEST PERTH, WA, 6872, xxxxxxxxxxxxxx@goldfields.com, xxxxx204To:ST IVES GOLD MINING COMPANY PTY LIMITED, GEMMA GLASS / RACHAEL CHALMERS, C/- TENEMENTS, GPO BOX 2731, CLOISTERS SQUARE PO, WA, 6850, xxxxxxxxxxxxxx@goldfields.com, xxxxx204RECORDED:14:27:01 23 February 2021
Expiry - Full620988EFFECTIVE:Midnight 14 April 2021

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202109-Apr-2020 10140307$4,808.008 BL14-Apr-2015 $4,808.00$0.00
Rental202011-Apr-2019 92709124900$4,536.008 BL14-Apr-2015 $4,536.00$0.00
Rental201904-Apr-2018 8563900367$4,280.008 BL14-Apr-2015 $4,280.00$0.00
Rental201828-Mar-2017 MT-210010998006-DD$4,140.808 BL14-Apr-2015 $4,140.80$0.00
Rental201720-Apr-2016 MT-210010578335-DD$4,004.808 BL14-Apr-2015 $4,004.80$0.00
Rental201624-Apr-2015 (REFUND) MT-210010247653-DDPERTH$1,288.258 BL14-Apr-2015 $2,061.20$0.00
Rental201620-Apr-2015 MT-210010247653-DD$3,349.45
Rental201503-Apr-2014 409320487471$3,264.3013 BL15-Apr-2009 $3,264.30$0.00
Rental201424-Apr-2013 06-123167PERTH$2,358.8513 BL15-Apr-2009 $2,358.85$0.00
Rental201330-Apr-2012 06-109143PERTH$2,294.5013 BL15-Apr-2009 $2,294.50$0.00
Rental201220-Apr-2011 92974PERTH$1,574.4313 BL15-Apr-2009 $1,574.43$0.00
Rental201127-Apr-2010 78354PERTH$1,541.5413 BL15-Apr-2009 $1,541.54$0.00
Rental201008-Apr-2009 12259KALGOORLIE$124.1513 BL15-Apr-2009 $1,365.65$0.00
Rental201029-Jan-2007 1537COOLGARDIE$1,241.50

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2021$70,000.0004-Jun-2021 $13,494.00$7,629.00$0.00$0.00$5,407.00$458.00$0.00false
2020$70,000.0022-May-2020 $166,348.00$150,680.00$0.00$0.00$600.00$15,068.00$0.00false
2019$70,000.0005-Jun-2019 $70,965.00$51,298.00$0.00$0.00$9,407.00$10,260.00$0.00false
2018$70,000.0014-May-2018 $42,956.0053037616-May-2018 $70,000.00Granted03-Jul-2018 $36,079.00$0.00$0.00$4,712.00$2,165.00$0.00false
2017$70,000.0023-May-2017 $93,976.00$83,569.00$0.00$0.00$4,557.00$5,850.00$0.00false
2016$50,000.0017-May-2016 $9,754.0048684717-May-2016 $50,000.00Granted22-Jun-2016 $6,700.00$0.00$0.00$2,686.00$368.00$0.00false
2015$50,000.0026-May-2015 $23,315.0046818727-May-2015 $50,000.00Granted06-Aug-2015 $17,125.00$0.00$0.00$4,478.00$1,712.00$0.00false
2014$30,000.0029-May-2014 $136,376.00$121,218.00$0.00$0.00$3,037.00$12,121.00$0.00false
2013$30,000.0007-Jun-2013 $41,491.00$31,665.00$0.00$0.00$2,911.00$6,915.00$0.00false
2012$20,000.0018-May-2012 $12,510.0039920308-Jun-2012 $7,490.00Granted06-Aug-2012 $6,311.00$0.00$0.00$2,200.00$0.00$3,999.00false
2011$20,000.0018-May-2011 $20,280.00$10,038.00$0.00$4,253.00$1,989.00$4,000.00$0.00false
2010$20,000.0020-May-2010 $37,758.00$30,954.00$0.00$0.00$2,145.00$4,659.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
26-Jun-2015 Tenement AmalgamationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2015-07-152015-11-15CLEARED - Expedited Applies2015-11-3036.29 HA31828S1213351E13km NW'ly of Kambalda13GoldfieldsNative Title Services Goldfields
10-Mar-2008 Tenement ApplicationNT Cleared