1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 03-Oct-2008 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 03-Oct-2008 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Oct-2008 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Oct-2008 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 03-Oct-2008 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 03-Oct-2008 | |
7 | 1 | No interference with Geodetic Survey Station SSM - G 15-2 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 03-Oct-2008 | |
8 | 1 | No excavation, excepting shafts, approaching closer to the Goldfields Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Goldfields Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 03-Oct-2008 | |
9 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Timber Reserve 199, Unnumbered Land Act Reserve 14, Water Supply Reserve 33752 and Trigonometrical Station Reserve 17173. | 03-Oct-2008 | |
10 | 1 | No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land (RCL/9) as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978. | 03-Oct-2008 | |
11 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by Condition (10) hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 03-Oct-2008 | |
12 | 1 | Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition (10) hereof being approved by the State Mining Engineer, DoCEP in consultation with the operator of the railway on corridor land. | 03-Oct-2008 | |
13 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition (10) hereof without the prior approval of the operator of the railway on corridor land. | 03-Oct-2008 | |
14 | 1 | The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition (10) hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 03-Oct-2008 | |
15 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods Safety Branch, DoCEP. | 03-Oct-2008 | |
16 | 1 | The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA. | 03-Oct-2008 | |
17 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land. | 03-Oct-2008 | |
18 | 1 | No mining within 25 metres of either side of the Pipeline Licence 59. | 03-Oct-2008 | |
19 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 18 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 03-Oct-2008 | |
20 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 18 hereof without the prior approval of the operators of the Gas pipeline. | 03-Oct-2008 | |
21 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 18 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 03-Oct-2008 | |
22 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer, DoCEP. | 03-Oct-2008 | |
23 | 1 | Mining on the Safety Zone established in Condition 18 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP. | 03-Oct-2008 | |
24 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 18 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 03-Oct-2008 | |
25 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline. | 03-Oct-2008 | |
| 1 | Consent to explore on Timber Reserve 199/25 (Kambalda) granted subject to the following further conditions: | 20-Oct-2022 | |
26 | 1 | Mining related activiities and measures to protect the environment being carried out in accordance with the document St Ives Gold Mine - Conservation Management Plan - Caves Rocks and Kambalda West Reserves - Kambalda Timber Reserve (199/25) and Kambalda Nature Reserve (33300) E15/973, E15/974, E15/975, E15/1347, M15/300, M15/720, M15/1221, M15/1222, M15/1379, M15/1224 - June 2020- V0, dated June 2020 - St Ives Gold Mining Company Pty Ltd and retained on Department of Mines, Industry Regulation and Safety (DMIRS) file numbered E15/975. | 20-Oct-2022 | |
27 | 1 | At least five working days prior to accessing the timber reserve, the licensee providing the relevant Regional Manger, Department of Biodiversity Conservation and Attraction (DBCA) with an itinerary and program of the locations of operations on the licence area and informing at least five days in advance of any changes to that itinerary. All actiivities and movements shall comply with reasonable access and travel requirements of the Regional Manager, DBCA regarding seasonal/ground conditions. | 20-Oct-2022 | |
28 | 1 | The licensee submitting to the Executive Director, Rsource and Environmental Compliance, DMIRS and to the relevant Regional Manager, DBCA annually within a month of the anniversary of grant in each year, a brief report outlining the operations and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitaion progrms for the next 12 months. The report must include a map showing the location of all disturbances and rehabilitation actiivities that occurred during the reporting period. | 20-Oct-2022 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 03-Oct-2008 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 03-Oct-2008 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Oct-2008 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Oct-2008 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 03-Oct-2008 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 03-Oct-2008 | |
7 | 1 | No interference with Geodetic Survey Station SSM - G 15-2 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 03-Oct-2008 | |
8 | 1 | No excavation, excepting shafts, approaching closer to the Goldfields Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Goldfields Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 03-Oct-2008 | |
9 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Timber Reserve 199, Unnumbered Land Act Reserve 14, Water Supply Reserve 33752 and Trigonometrical Station Reserve 17173. | 03-Oct-2008 | |
10 | 1 | No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land (RCL/9) as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978. | 03-Oct-2008 | |
11 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by Condition (10) hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 03-Oct-2008 | |
12 | 1 | Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition (10) hereof being approved by the State Mining Engineer, DoCEP in consultation with the operator of the railway on corridor land. | 03-Oct-2008 | |
13 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition (10) hereof without the prior approval of the operator of the railway on corridor land. | 03-Oct-2008 | |
14 | 1 | The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition (10) hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 03-Oct-2008 | |
15 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods Safety Branch, DoCEP. | 03-Oct-2008 | |
16 | 1 | The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA. | 03-Oct-2008 | |
17 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land. | 03-Oct-2008 | |
18 | 1 | No mining within 25 metres of either side of the Pipeline Licence 59. | 03-Oct-2008 | |
19 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 18 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 03-Oct-2008 | |
20 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 18 hereof without the prior approval of the operators of the Gas pipeline. | 03-Oct-2008 | |
21 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 18 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 03-Oct-2008 | |
22 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer, DoCEP. | 03-Oct-2008 | |
23 | 1 | Mining on the Safety Zone established in Condition 18 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP. | 03-Oct-2008 | |
24 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 18 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline. | 03-Oct-2008 | |
25 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline. | 03-Oct-2008 | |
| 1 | Consent to explore on Timber Reserve 199/25 (Kambalda) granted subject to the following further conditions: | 20-Oct-2022 | |
26 | 1 | Mining related activiities and measures to protect the environment being carried out in accordance with the document St Ives Gold Mine - Conservation Management Plan - Caves Rocks and Kambalda West Reserves - Kambalda Timber Reserve (199/25) and Kambalda Nature Reserve (33300) E15/973, E15/974, E15/975, E15/1347, M15/300, M15/720, M15/1221, M15/1222, M15/1379, M15/1224 - June 2020- V0, dated June 2020 - St Ives Gold Mining Company Pty Ltd and retained on Department of Mines, Industry Regulation and Safety (DMIRS) file numbered E15/975. | 20-Oct-2022 | |
27 | 1 | At least five working days prior to accessing the timber reserve, the licensee providing the relevant Regional Manger, Department of Biodiversity Conservation and Attraction (DBCA) with an itinerary and program of the locations of operations on the licence area and informing at least five days in advance of any changes to that itinerary. All actiivities and movements shall comply with reasonable access and travel requirements of the Regional Manager, DBCA regarding seasonal/ground conditions. | 20-Oct-2022 | |
28 | 1 | The licensee submitting to the Executive Director, Rsource and Environmental Compliance, DMIRS and to the relevant Regional Manager, DBCA annually within a month of the anniversary of grant in each year, a brief report outlining the operations and rehabilitation work undertaken in the previous 12 months and the proposed operations, environmental management plans and rehabilitaion progrms for the next 12 months. The report must include a map showing the location of all disturbances and rehabilitation actiivities that occurred during the reporting period. | 20-Oct-2022 | |
Type | Number | Details |
Extension of Time | 263617 | Lodged 12:20 PM on 30 Mar 2007 for late lodgement of securitiesApproved by the Warden on 30 Mar 2007 |
Transfer | 285527 | Transfer 285527 was registered on 07 Mar 2008 against E 15/288. Pursuant to Section 120AA the applicant details have been amended. |
Application to Amend | 296292 | Lodged 3:35 PM on 30 Jul 2008 amending the address for Border Resources NL to read " C/- Moto Goldmines Ltd, PO Box 1255 Wesst Perth WA 6947"RECORDED 3:35 PM 30 Jul 2008 |
Caveat | 319H/045 | Pursuant to Section 120AA, Caveat 319H/045 by SHERLOCK BAY NICKEL CORPORATION LTD in respect to 80/100ths shares in the name of BHP BILLITON NICKEL WEST PTY LTD lodged against E 15/288 is now effective against this tenement.RECORDED 03 Oct 2008Order under Section 122(D)1 that Transfers 451515 and 451561 are registered while Caveat 319H/045 (210571) remains in force, signed F Zempilas, Warden, 21 Aug 2014.Order under Section 122(D)1 that Transfer 451561 is registered while Caveat 319H/045 (210571) remains in force, signed F Zempilas, Warden, 21/08/2014. |
Caveat | 285744 | Pursuant to Section 120AA, Caveat 285744 by BHP BILLITON NICKEL WEST PTY LTD in respect to 4/100ths shares in the name of BORDER RESOURCES NL lodged against E 15/288 is now effective against this tenement.RECORDED 03 Oct 2008WITHDRAWN:13:35 12 December 2008 |
Withdrawal of Dealing | 306888 | Lodged:13:35 12 December 2008In respect to:Caveat 285744RECORDED:13:35 12 December 2008 |
Forfeiture | 349702 | Initiated:25/06/2010 for non-compliance with expenditure conditionsRECORDED:08:30 25 June 2010Notice Issued:Regulation 50 Notice sent 25/06/2010 for non-compliance with expenditure conditions pursuant to Reg 21 & 22.Compliance Date:25/07/2010FINALISED:Order by Minister on 13 August 2010 that E 15/975 be Penalty Imposed |
Fine | 353764 | Fine in respect to:Forfeiture Process 349702Fine reason:Non-compliance with expenditure obligationsPenalty amount:$2,007.00Notification date:19/08/2010Due date:20/09/2010Pursuant to:Section 96A(5)RECORDED:19 August 2010PAYMENT RECEIVED:27 August 2010Receipt Number:83452Amount:$2,007.00Remaining balance:$0.00FINALISED:27 August 2010 |
Extension / Renewal of Term | 431605 | Lodged:12:30 20 September 2013Applied For Period:5 YearsRECORDED:12:30 20 September 2013GRANTED:21 November 2013Granted Period:5 YearsTerm Extended To:02/10/2018 |
Application to Amend | 434634 | Lodged:13:54 06 November 2013Amending:AddressFrom:BHP BILLITON NICKEL WEST PTY LTD, C/- LAND SERVICES, PO BOX 8301, PERTH BUSINESS CENTRE, WA, 6849To:BHP BILLITON NICKEL WEST PTY LTD, C/- TENEMENTS, PO BOX 628, WEST PERTH, WA, 6872RECORDED:13:54 06 November 2013 |
Partial Surrender - Compulsory | 455615 | Lodged:11:17:42 02 October 2014Section:Section 65 (3)Surrendered Blocks:KALGOORLIE 2755 f, g, q, v
KALGOORLIE 2827 a, f, g, l, m, r, s, w
KALGOORLIE 2828 g, mSurrendered Total:14 BL.REGISTERED:Midnight 02 October 2014Surrendered area to be released 08:30:00 28/10/2014 under Section 65 (3)Surrendered area released 08:30:00 28/10/2014 under Section 65 (3) |
Application to Amend | 460544 | Lodged:13:50 16 January 2015Amending:AddressFrom:BORDER RESOURCES NL, C/- MOTO GOLDMINES LTD, PO BOX 1255, WEST PERTH, WA, 6872To:BORDER RESOURCES NL, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931RECORDED:13:50 16 January 2015 |
Amalgamation | 461990 | Lodged:15:15 09 February 2015Amalgamating:Whole of former P 15/5630Situated within:External boundaries of E 15/975Granted 08/07/2015 in respect to P 15/5630 |
Amalgamation | 473973 | Lodged:10:15 04 September 2015Amalgamation : Portions of P15/4976 and P15/4977
Situated within : External boundaries of E15/975Granted 28/09/2016 in respect to P15/4976 and P15/4977 |
Application to Amend | 493044 | Lodged:09:42:29 30 August 2016Amending:Address (Including DTC Details)From:ST IVES GOLD MINING COMPANY PTY LIMITED, C/- TENEMENTS, PO BOX 628, WEST PERTH, WA, 6872To:ST IVES GOLD MINING COMPANY PTY LIMITED, GEMMA GLASS / RACHAEL CHALMERS, C/- TENEMENTS, PO BOX 628, WEST PERTH, WA, 6872, xxxxxxxxxxxxxx@goldfields.com, xxxxx204RECORDED:09:42:29 30 August 2016 |
Extension / Renewal of Term | 539201 | Lodged:11:24:29 17 September 2018Applied For Period:2 YearsRECORDED:11:24:29 17 September 2018GRANTED:30 November 2018Granted Period:2 YearsTerm Extended To:02/10/2020 |
Amalgamation | 541991 | Lodged:11:39 02 November 2018Amalgamating:Whole of former P 15/6058Situated within:External boundaries of E 15/975Granted 06/06/2019 in respect to P 15/6058 |
Extension / Renewal of Term | 586986 | Lodged:13:51:41 24 September 2020Applied For Period:2 YearsRECORDED:13:51:41 24 September 2020GRANTED:13 January 2021Granted Period:2 YearsTerm Extended To:02/10/2022 |
Application to Amend | 616447 | Lodged:14:27:01 23 February 2021Amending:Address (Including DTC Details)From:ST IVES GOLD MINING COMPANY PTY LIMITED, GEMMA GLASS / RACHAEL CHALMERS, C/- TENEMENTS, PO BOX 628, WEST PERTH, WA, 6872, xxxxxxxxxxxxxx@goldfields.com, xxxxx204To:ST IVES GOLD MINING COMPANY PTY LIMITED, GEMMA GLASS / RACHAEL CHALMERS, C/- TENEMENTS, GPO BOX 2731, CLOISTERS SQUARE PO, WA, 6850, xxxxxxxxxxxxxx@goldfields.com, xxxxx204RECORDED:14:27:01 23 February 2021 |
Extension / Renewal of Term | 658525 | Lodged:14:30:15 13 September 2022Applied For Period:2 YearsRECORDED:14:30:15 13 September 2022GRANTED:06 December 2022Granted Period:2 YearsTerm Extended To:02/10/2024 |
Extension / Renewal of Term | 714585 | Lodged:14:54:17 12 September 2024Applied For Period:2 YearsRECORDED:14:54:17 12 September 2024GRANTED:02 December 2024Granted Period:2 YearsTerm Extended To:02/10/2026 |