1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 29-Apr-2008 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 29-Apr-2008 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Apr-2008 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Apr-2008 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Apr-2008 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Apr-2008 | |
7 | 1 | No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 29-Apr-2008 | |
8 | 1 | No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land (RCL/15) as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978. | 29-Apr-2008 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by Condition (8) hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 29-Apr-2008 | |
10 | 1 | Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition (8) hereof being approved by the State Mining Engineer, DoCEP in consultation with the operator of the railway on corridor land. | 29-Apr-2008 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition (8) hereof without the prior approval of the operator of the railway on corridor land. | 29-Apr-2008 | |
12 | 1 | The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition (8) hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 29-Apr-2008 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods Safety Branch, DoCEP. | 29-Apr-2008 | |
14 | 1 | The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA. | 29-Apr-2008 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land. | 29-Apr-2008 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 29-Apr-2008 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 29-Apr-2008 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 29-Apr-2008 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 29-Apr-2008 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 29-Apr-2008 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 29-Apr-2008 | |
7 | 1 | No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 29-Apr-2008 | |
8 | 1 | No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land (RCL/15) as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978. | 29-Apr-2008 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by Condition (8) hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 29-Apr-2008 | |
10 | 1 | Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition (8) hereof being approved by the State Mining Engineer, DoCEP in consultation with the operator of the railway on corridor land. | 29-Apr-2008 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition (8) hereof without the prior approval of the operator of the railway on corridor land. | 29-Apr-2008 | |
12 | 1 | The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition (8) hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 29-Apr-2008 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods Safety Branch, DoCEP. | 29-Apr-2008 | |
14 | 1 | The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA. | 29-Apr-2008 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land. | 29-Apr-2008 | |
Type | Number | Details |
Forfeiture | 375878 | Initiated:05/07/2011 for non-compliance with reporting requirementsRECORDED:11:33:58 07 July 2011Notice Issued:Regulation 50 Notice sent 05/07/2011 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:05/08/2011FINALISED:Order by Minister on 02 September 2011 that E 15/961 be Penalty Imposed |
Fine | 380580 | Fine in respect to:Forfeiture Process 375878Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$90.00Notification date:02/09/2011Due date:05/10/2011Pursuant to:Section 96A(5)RECORDED:02 September 2011PAYMENT RECEIVED:12 September 2011Receipt Number:99902Amount:$90.00Remaining balance:$0.00FINALISED:12 September 2011 |
Mortgage | 420518 | Lodged:15:40 08 April 2013Mortgaged Shares:100/100 shares LA MANCHA RESOURCES AUSTRALIA PTY LTDMortgagee:MACQUARIE BANK LTDREGISTERED:15:40 08 April 2013DISCHARGED:14:30 09 September 2015Full Discharge:474168 Registered 14:30 09 September 2015 |
Extension / Renewal of Term | 421653 | Lodged:14:05 24 April 2013Applied For Period:5 YearsRECORDED:14:05 24 April 2013GRANTED:30 May 2013Granted Period:5 YearsTerm Extended To:28/04/2018 |
Application to Amend | 433139 | Lodged:14:10 11 October 2013Amending:AddressFrom:LA MANCHA RESOURCES AUSTRALIA PTY LTD, C/- CENTRAL TENEMENT SERVICES, PO BOX 722, WEST PERTH, WA, 6872To:LA MANCHA RESOURCES AUSTRALIA PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931RECORDED:14:10 11 October 2013 |
Mortgage - Discharge | 474168 | Lodged:14:30 09 September 2015In respect to:Mortgage 420518REGISTERED:14:30 09 September 2015 |
Application to Amend | 475435 | Lodged:15:45 05 October 2015Amending:NameFrom:LA MANCHA RESOURCES AUSTRALIA PTY LTDTo:EVOLUTION MINING (MUNGARI) PTY LTDRECORDED:15:45 05 October 2015 |
Extension / Renewal of Term | 528717 | Lodged:16:24:39 24 April 2018Applied For Period:2 YearsRECORDED:16:24:39 24 April 2018GRANTED:30 July 2018Granted Period:2 YearsTerm Extended To:28/04/2020 |
Application to Amend | 533080 | Lodged:15:00 18 June 2018Amending:Address (Including DTC Details)From:Principal Place of Business : EVOLUTION MINING (MUNGARI) PTY LTD, SAME AS CORRESPONDENCE and DTC :EVOLUTION MINING (MUNGARI) PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:Principal Place of Business : EVOLUTION MINING (MUNGARI) PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :EVOLUTION MINING (MUNGARI) PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:15:00 18 June 2018 |
Application to Amend | 558242 | Lodged:15:10 10 July 2019Including email and telephone details in DTCRECORDED:15:10 10 July 2019 |
Extension / Renewal of Term | 573775 | Lodged:09:12:49 11 March 2020Applied For Period:2 YearsRECORDED:09:12:49 11 March 2020GRANTED:30 June 2020Granted Period:2 YearsTerm Extended To:28/04/2022 |