Tenement Summary

Identifier:E 15/808Type:Exploration Licence
Status:LiveDistrict:COOLGARDIE
Lodged:COOLGARDIEArea:9 BL
Purposes:Term:5 Years (Extended)
Markout:Received:16-Jun-2003 08:30
Commence:05-Jul-2006 Expiry:04-Jul-2025

Holders

Company NameSharesTotal Shares
AVOCA RESOURCES PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
AVOCA RESOURCES LTD100100

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Special ProspectingP 15/5999-SDead
Amalgamation (Different holder)Amalgamation 500597GrantedP 15/4841Dead
Amalgamation (Different holder)Amalgamation 500596GrantedP 15/4840Dead
Special ProspectingP 15/6297-SDead
Section 67Conversion 554832RecordedM 15/1872Pending
Amalgamation (Different holder)Amalgamation 562084GrantedP 15/5945Dead

Shires

Shire NameShire NumberStartArea
COOLGARDIE SHIRE196016-Jun-2003 9.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion.05-Jul-2006
22All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.19-Dec-2024
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.05-Jul-2006 18-Dec-2024
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.05-Jul-2006
41Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.05-Jul-2006
51The rights of ingress to and egress from Miscellaneous Licence 15/102 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.05-Jul-2006
61No mining on Cemetery Reserves 4375 and 32249 and mining within a distance of 140 metres laterally from the Reserve being confined to below a depth of 50 metres from the lowest part of the surface of the land with rights of ingress to and egress from the said Reserve being at all times preserved to the public.05-Jul-2006
71No excavation, excepting shafts, approaching closer to the Coolgardie-Esperance Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Coolgardie-Esperance Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface.05-Jul-2006
81The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing mining on Water Reserve 6880 and Railway Purposes Reserve 38183.05-Jul-2006
91Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof.05-Jul-2006
101No mining within 30 metres of either side of the rail corridor land (RCL/9 as shown in TENGRAPH).05-Jul-2006
111No surface excavation approaching closer to the boundary of the Safety Zone established by Condition (10) hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, Department of Consumer and Employment Protection (DoCEP).05-Jul-2006
121Mining below the surface of the Safety Zone established in Condition (10) hereof being approved by the State Mining Engineer, DoCEP in consultation with the operator of the railway on corridor land.05-Jul-2006
131No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition (10) hereof without the prior approval of the operator of the railway on corridor land.05-Jul-2006
141The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition (10) hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP.05-Jul-2006
151No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the State Mining Engineer, DoCEP.05-Jul-2006
161The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Rail Corridor Minister.05-Jul-2006
171Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land.05-Jul-2006
181No mining within 25 metres of either side of State Onshore Pipeline Licence 59.05-Jul-2006
191No surface excavation approaching closer to the boundary of the Safety Zone established by condition 18 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP.05-Jul-2006
201No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 18 hereof without the prior approval of the operators of the Gas pipeline.05-Jul-2006
211The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 18 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP.05-Jul-2006
221No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer, DoCEP.05-Jul-2006
231Mining on the Safety Zone established in Condition 18 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP.05-Jul-2006
241The rights of ingress to and egress from the pipeline easement established in Condition 18 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline.05-Jul-2006
251Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline.05-Jul-2006
1Consent to Mine on the Widgiemooltha Townsite granted subject to the following:-05-Jul-2006
261Access to the surface of land within Widgiemooltha Townsite for mining purposes being subject to the approval of the local Authority or relevant reserve vestees, and mining activities within the first 100 metres below the surface of the land being limited to such exploration activities as may be approved by the Director, Environment DoIR.05-Jul-2006
271All abandoned equipment and temporary buildings being removed from the mining tenement at the termination of exploration programme.05-Jul-2006
281No activities taking place to the detriment of any roads, streets or verges.05-Jul-2006
291Minimum disturbance being made to natural vegetation.05-Jul-2006
301Adequate dust suppression control methods and practices being used.05-Jul-2006
311All mining, excavation or drilling operations being backfilled and the ground reinstated and revegetated at the completion of operations to the satisfaction of the Environmental Officer, DoIR in consultation with the Shire of Coolgardie.05-Jul-2006
321All works to comply with noise regulations05-Jul-2006
331All waste materials, rubbish and plastic sample bags to be removed within 60 days of placement.05-Jul-2006
341The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 90124) "Exploration Environmental Management Plan - Higginsville Operations" dated 26 November 2020 by Timonthy Orme and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-90124 as Doc ID 7911988                                                    
09-Dec-2020
351The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any prospecting activities on Crown Reserve 4311 for Warter Supply Purposes.01-Apr-2021
361All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.13-Feb-2025
371The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request.13-Feb-2025
381All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.13-Feb-2025

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion.05-Jul-2006
22All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.19-Dec-2024
21All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR.05-Jul-2006 18-Dec-2024
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.05-Jul-2006
41Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.05-Jul-2006
51The rights of ingress to and egress from Miscellaneous Licence 15/102 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.05-Jul-2006
61No mining on Cemetery Reserves 4375 and 32249 and mining within a distance of 140 metres laterally from the Reserve being confined to below a depth of 50 metres from the lowest part of the surface of the land with rights of ingress to and egress from the said Reserve being at all times preserved to the public.05-Jul-2006
71No excavation, excepting shafts, approaching closer to the Coolgardie-Esperance Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Coolgardie-Esperance Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface.05-Jul-2006
81The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing mining on Water Reserve 6880 and Railway Purposes Reserve 38183.05-Jul-2006
91Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof.05-Jul-2006
101No mining within 30 metres of either side of the rail corridor land (RCL/9 as shown in TENGRAPH).05-Jul-2006
111No surface excavation approaching closer to the boundary of the Safety Zone established by Condition (10) hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, Department of Consumer and Employment Protection (DoCEP).05-Jul-2006
121Mining below the surface of the Safety Zone established in Condition (10) hereof being approved by the State Mining Engineer, DoCEP in consultation with the operator of the railway on corridor land.05-Jul-2006
131No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition (10) hereof without the prior approval of the operator of the railway on corridor land.05-Jul-2006
141The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition (10) hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP.05-Jul-2006
151No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the State Mining Engineer, DoCEP.05-Jul-2006
161The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Rail Corridor Minister.05-Jul-2006
171Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land.05-Jul-2006
181No mining within 25 metres of either side of State Onshore Pipeline Licence 59.05-Jul-2006
191No surface excavation approaching closer to the boundary of the Safety Zone established by condition 18 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP.05-Jul-2006
201No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 18 hereof without the prior approval of the operators of the Gas pipeline.05-Jul-2006
211The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 18 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP.05-Jul-2006
221No explosives being used or stored within one hundred and fifty (150) metres of the Gas pipeline without the prior written consent of the State Mining Engineer, DoCEP.05-Jul-2006
231Mining on the Safety Zone established in Condition 18 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer, DoCEP.05-Jul-2006
241The rights of ingress to and egress from the pipeline easement established in Condition 18 hereof being at all times preserved for employees, contractors and agents of the operators of the Gas pipeline.05-Jul-2006
251Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Gas pipeline.05-Jul-2006
1Consent to Mine on the Widgiemooltha Townsite granted subject to the following:-05-Jul-2006
261Access to the surface of land within Widgiemooltha Townsite for mining purposes being subject to the approval of the local Authority or relevant reserve vestees, and mining activities within the first 100 metres below the surface of the land being limited to such exploration activities as may be approved by the Director, Environment DoIR.05-Jul-2006
271All abandoned equipment and temporary buildings being removed from the mining tenement at the termination of exploration programme.05-Jul-2006
281No activities taking place to the detriment of any roads, streets or verges.05-Jul-2006
291Minimum disturbance being made to natural vegetation.05-Jul-2006
301Adequate dust suppression control methods and practices being used.05-Jul-2006
311All mining, excavation or drilling operations being backfilled and the ground reinstated and revegetated at the completion of operations to the satisfaction of the Environmental Officer, DoIR in consultation with the Shire of Coolgardie.05-Jul-2006
321All works to comply with noise regulations05-Jul-2006
331All waste materials, rubbish and plastic sample bags to be removed within 60 days of placement.05-Jul-2006
341The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
  • (PoW Reg ID 90124) "Exploration Environmental Management Plan - Higginsville Operations" dated 26 November 2020 by Timonthy Orme and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-90124 as Doc ID 7911988                                                    
09-Dec-2020
351The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any prospecting activities on Crown Reserve 4311 for Warter Supply Purposes.01-Apr-2021
361All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety.13-Feb-2025
371The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request.13-Feb-2025
381All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work.13-Feb-2025

Dealings

TypeNumberDetails
Application to Amend182H/045Lodged 3:35:00 PM on 12 Oct 2004 amending the address to "c/- Barrick Gold of Australia Limited Locked Bag 12 Cloisters Square WA 6850"REGISTERED 3:35 PM 12 Oct 2004
Exemption from Drop-off324383Lodged:14:50 25 June 2009For relief from the provisions of Section 65(1)(a)RECORDED:14:50 25 June 2009GRANTED:28 January 2010
Exemption from Drop-off350238Lodged:13:40 01 July 2010For relief from the provisions of Section 65(1)(b)RECORDED:13:40 01 July 2010GRANTED:07 September 2010
Extension / Renewal of Term375549Lodged:10:30 04 July 2011Applied For Period:2 YearsRECORDED:10:30 04 July 2011GRANTED:06 September 2011Granted Period:2 YearsTerm Extended To:04/07/2013
Extension / Renewal of Term425441Lodged:10:55 18 June 2013Applied For Period:2 YearsRECORDED:10:55 18 June 2013GRANTED:27 June 2013Granted Period:2 YearsTerm Extended To:04/07/2015
Application to Amend434823Lodged:14:50 11 November 2013Amending:AddressFrom:AVOCA RESOURCES LTD, ATTN: DES STEEL (TENEMENT-GIS CO-ORDINATOR), PO BOX 796, KALGOORLIE, WA, 6430To:AVOCA RESOURCES LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:14:50 11 November 2013
Application to Amend441222Lodged:10:30:44 28 February 2014From:AVOCA RESOURCES LTDAmending:NameTo:AVOCA RESOURCES PTY LTDRECORDED:10:30:44 28 February 2014
Extension / Renewal of Term470524Lodged:15:50 02 July 2015Applied For Period:1 YearsRECORDED:15:50 02 July 2015GRANTED:03 September 2015Granted Period:1 YearsTerm Extended To:04/07/2016
Extension / Renewal of Term489821Lodged:10:35:36 04 July 2016Applied For Period:1 YearsRECORDED:10:35:36 04 July 2016GRANTED:19 October 2016Granted Period:1 YearsTerm Extended To:04/07/2017
Partial Surrender - Voluntary492095Lodged:09:47:33 11 August 2016Surrendered Blocks:KALGOORLIE 2971 d, e, j, k KALGOORLIE 2972 m, n, r, sSurrendered Total:8 BL.REGISTERED:09:47:33 11 August 2016
Amalgamation500596Lodged:11:46 01 February 2017Amalgamating:Portion of former P 15/4840Situated within:External boundaries of E 15/808Granted 27/07/2017 in respect to P 15/4840
Amalgamation500597Lodged:11:46 01 February 2017Amalgamating:Portion of former P 15/4841Situated within:External boundaries of E 15/808Granted 27/07/2017 in respect to P 15/4841
Extension / Renewal of Term509733Lodged:13:31:16 04 July 2017Applied For Period:1 YearsRECORDED:13:31:16 04 July 2017GRANTED:24 November 2017Granted Period:1 YearsTerm Extended To:04/07/2018
Application to Amend523327Lodged:15:26:54 09 February 2018Amending:Address (Including DTC Details)From:Principal Place of Business : AVOCA RESOURCES PTY LTD, SAME AS CORRESPONDENCE and DTC :AVOCA RESOURCES PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : AVOCA RESOURCES PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :AVOCA RESOURCES PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:15:26:54 09 February 2018
Extension / Renewal of Term534236Lodged:10:09:43 04 July 2018Applied For Period:1 YearsRECORDED:10:09:43 04 July 2018GRANTED:14 September 2018Granted Period:1 YearsTerm Extended To:04/07/2019
Conversion554832New Tenement:M 15/1872Application Date:14:13:04 27 May 2019Section:S67
Application to Amend556389Lodged:13:05:38 18 June 2019Amending:Address (Including DTC Details)From:Principal Place of Business : AVOCA RESOURCES PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :AVOCA RESOURCES PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400To:Principal Place of Business : AVOCA RESOURCES PTY LTD, C/- DEBLIN TENEMENT MANAGEMENT SERVICES, PO BOX 456, MOUNT HAWTHORN, WA, 6915, xxxx@deblin.com.au, xxxxxxx190 and DTC :AVOCA RESOURCES PTY LTD, THE TENEMENT MANAGER, DEBLIN TENEMENT MANAGEMENT SERVICES, PO BOX 456, MOUNT HAWTHORN, WA, 6915, xxxx@deblin.com.au, xxxxxxx190RECORDED:13:05:38 18 June 2019
Extension / Renewal of Term557860Lodged:11:09:20 04 July 2019Applied For Period:1 YearsRECORDED:11:09:20 04 July 2019GRANTED:17 September 2019Granted Period:1 YearsTerm Extended To:04/07/2020
Amalgamation562084Lodged:15:46 29 August 2019Amalgamating:Portion of former P 15/5945Situated within:External boundaries of E 15/808Granted 01/04/2021 in respect to P 15/5945
Mortgage562266Lodged:08:30 03 September 2019Mortgaged Shares:100/100 shares AVOCA RESOURCES PTY LTDMortgagee:CORTLAND CREDIT LENDING CORPORATIONREGISTERED:08:30 03 September 2019DISCHARGED:09:14:55 15 July 2022Full Discharge:653492 Registered 09:14:55 15 July 2022
Extension / Renewal of Term580777Lodged:15:13:51 24 June 2020Applied For Period:2 YearsRECORDED:15:13:51 24 June 2020WITHDRAWN:02 July 2020
Extension / Renewal of Term580951Lodged:15:50:02 26 June 2020Applied For Period:1 YearsRECORDED:15:50:02 26 June 2020GRANTED:14 April 2021Granted Period:1 YearsTerm Extended To:04/07/2021
Extension / Renewal of Term627167Lodged:12:59:49 30 June 2021Applied For Period:1 YearsRECORDED:12:59:49 30 June 2021GRANTED:26 October 2021Granted Period:1 YearsTerm Extended To:04/07/2022
Extension of Time628332Lodged:16:29:11 16 July 2021Type:OtherRECORDED:16:29:11 16 July 2021APPROVED:11:36:01 30 August 2021Time extended to lodge to 16 July 2021
Extension of Time631402Lodged:08:30 30 August 2021Type:Form 5RECORDED:08:30 30 August 2021APPROVED:14:38:41 22 September 2021Time extended to lodge to 30 September 2021
Extension / Renewal of Term650775Lodged:14:29:03 02 June 2022Applied For Period:1 YearsRECORDED:14:29:03 02 June 2022GRANTED:05 October 2022Granted Period:1 YearsTerm Extended To:04/07/2023
Mortgage - Discharge653492Lodged:09:14:55 15 July 2022In respect to:Mortgage 562266REGISTERED:09:14:55 15 July 2022
Extension of Time657329Lodged:10:33:32 30 August 2022Type:Form 5RECORDED:10:33:32 30 August 2022WITHDRAWN:16:17 02 September 2022
Extension of Time657728Lodged:16:13:35 02 September 2022Type:Form 5RECORDED:16:13:35 02 September 2022APPROVED:13:38:45 09 September 2022Time extended to lodge to 3 October 2022
Mortgage674050Lodged:14:32:20 21 April 2023Mortgaged Shares:100/100 shares AVOCA RESOURCES PTY LTDMortgagee:MACQUARIE BANK LIMITEDREGISTERED:14:32:20 21 April 2023DISCHARGED:14:15 31 July 2024Full Discharge:711092 Registered 14:15 31 July 2024
Extension / Renewal of Term679377Lodged:08:30 26 June 2023Applied For Period:1 YearsRECORDED:08:30 26 June 2023GRANTED:30 August 2023Granted Period:1 YearsTerm Extended To:04/07/2024
Caveat700533Lodged:15:16:40 05 April 2024Caveat Type:Consent CaveatCaveator:KALI METALS LIMITEDShares Caveated:100/100 shares AVOCA RESOURCES PTY LTDRECORDED:15:16:40 05 April 2024
Extension / Renewal of Term704977Lodged:08:30 27 May 2024Applied For Period:1 YearsRECORDED:08:30 27 May 2024GRANTED:09 September 2024Granted Period:1 YearsTerm Extended To:04/07/2025
Extension of Time706613Lodged:08:30 14 June 2024Type:OtherRECORDED:08:30 14 June 2024APPROVED:10:58:54 14 June 2024Time extended to lodge to 24 June 2024
Extension of Time708309Lodged:13:19:03 02 July 2024Type:OtherRECORDED:13:19:03 02 July 2024APPROVED:15:28:59 04 July 2024Time extended to 19 July 2024 to lodge
Mortgage - Discharge711092Lodged:14:15 31 July 2024In respect to:Mortgage 674050REGISTERED:14:15 31 July 2024
Extension / Renewal of Term736997Lodged:08:30 30 June 2025PENDING

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202627-Jun-2025 10852957$7,227.009 BL11-Aug-2016 $7,227.00$0.00
Rental202528-Jun-2024 10604642$7,056.009 BL11-Aug-2016 $7,056.00$0.00
Rental202430-Jun-2023 10378000$6,723.009 BL11-Aug-2016 $6,723.00$0.00
Rental202330-Jun-2022 10272589$6,399.009 BL11-Aug-2016 $6,399.00$0.00
Rental202209-Jul-2021 10205333$6,093.009 BL11-Aug-2016 $6,093.00$0.00
Rental202102-Jul-2020 10151653$5,535.009 BL11-Aug-2016 $5,535.00$0.00
Rental202002-Jul-2019 94918168788$306.009 BL11-Aug-2016 $5,409.00$0.00
Rental202001-Jul-2019 10103221$5,103.00
Rental201903-Jul-2018 84948292878$5,103.009 BL11-Aug-2016 $5,103.00$0.00
Rental201830-Jun-2017 8274302614$4,815.009 BL11-Aug-2016 $4,815.00$0.00
Rental201701-Jul-2016 MT-210010651299-EF$8,799.2017 BL05-Jul-2006 $8,799.20$0.00
Rental201601-Jul-2015 MT-210010295722-EF$215.9017 BL05-Jul-2006 $8,510.20$0.00
Rental201615-Jun-2015 MT-210010280630-EF$8,294.30
Rental201513-Jun-2014 MT-210010184228-EF$8,294.3017 BL05-Jul-2006 $8,294.30$0.00
Rental201418-Jun-2013 06-125130PERTH$7,925.4017 BL05-Jul-2006 $7,925.40$0.00
Rental201325-Jun-2012 22340KALGOORLIE$4,185.4017 BL05-Jul-2006 $4,185.40$0.00
Rental201201-Jul-2011 19771KALGOORLIE$4,071.5017 BL05-Jul-2006 $4,071.50$0.00
Rental201102-Jul-2010 16613KALGOORLIE$3,203.3117 BL05-Jul-2006 $3,203.31$0.00
Rental201017-Jul-2009 13398KALGOORLIE$3,137.8617 BL05-Jul-2006 $3,137.86$0.00
Rental200911-Jul-2008 10144KALGOORLIE$1,935.4517 BL05-Jul-2006 $1,935.45$0.00
Rental200806-Jul-2007 7003KALGOORLIE$1,871.8717 BL05-Jul-2006 $1,871.87$0.00
Rental200704-Jul-2006 26046PERTH$143.8217 BL05-Jul-2006 $1,582.02$0.00
Rental200716-Jun-2003 4136COOLGARDIE$1,438.20

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2025$70,000.00false
2024$70,000.0029-Aug-2024 $917,167.00$812,183.00$0.00$0.00$7,522.00$97,462.00$0.00false
2023$70,000.0025-Aug-2023 $138,359.00$109,343.00$0.00$0.00$7,148.00$21,868.00$0.00false
2022$70,000.0030-Sep-2022 $103,098.15$82,303.15$0.00$0.00$6,795.00$14,000.00$0.00false
2021$70,000.0029-Sep-2021 $179,398.00$144,287.00$0.00$0.00$6,209.00$28,902.00$0.00false
2020$70,000.0002-Sep-2020 $71,294.00$51,135.00$0.00$34.00$6,125.00$14,000.00$0.00false
2019$70,000.0028-Aug-2019 $40,736.0056183128-Aug-2019 $70,000.00Granted19-Dec-2019 $20,662.00$0.00$0.00$6,074.00$14,000.00$0.00false
2018$70,000.0003-Sep-2018 $169,027.00$149,282.00$0.00$0.00$5,745.00$14,000.00$0.00false
2017$70,000.0004-Sep-2017 $93,867.00$74,369.00$0.00$0.00$5,498.00$14,000.00$0.00false
2016$70,000.0031-Aug-2016 $64,842.0049327902-Sep-2016 $70,000.00Granted10-Oct-2016 $37,991.00$0.00$0.00$12,851.00$14,000.00$0.00false
2015$70,000.0002-Sep-2015 $88,458.00$62,269.00$0.00$0.00$12,189.00$14,000.00$0.00false
2014$70,000.0002-Sep-2014 $64,383.0045401902-Sep-2014 $70,000.00Granted20-May-2015 $41,528.00$0.00$0.00$8,855.00$14,000.00$0.00false
2013$50,000.0023-Aug-2013 $56,979.00$42,416.00$0.00$0.00$5,067.00$9,496.00$0.00false
2012$50,000.0023-Aug-2012 $120,025.00$58,466.00$0.00$0.00$48,888.00$12,671.00$0.00false
2011$30,000.0030-Aug-2011 $31,585.00$22,218.00$0.00$0.00$4,103.00$5,264.00$0.00false
2010$30,000.0026-Aug-2010 $32,189.00$22,956.00$0.00$0.00$3,868.00$5,365.00$0.00false
2009$20,000.0026-Aug-2009 $20,635.00$15,258.00$0.00$0.00$2,685.00$2,692.00$0.00false
2008$20,000.0021-Aug-2008 $69,395.00$57,776.00$0.00$0.00$2,567.00$9,052.00$0.00false
2007$20,000.0024-Aug-2007 $136,274.00$113,158.00$0.00$3,120.00$2,221.00$17,775.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
27-Sep-2019 Tenement AmalgamationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2019-11-202020-03-20CLEARED - Expedited Applies2021-03-3041.55 HA312952S1213451E31.8km S'ly of KambaldaWO2020/02782020-03-19WC2017/007Objection Withdrawn2021-03-30Ngadju Part B(WCD2017/002)WC1999/002WAD6020/1998falseWCD2017/002EXISTNoMarlinyu Ghoorlie(WC2017/007)WC2017/007WAD647/2017falseRegistered13GoldfieldsNative Title Services Goldfields
13-Feb-2017 Tenement AmalgamationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2017-03-082017-07-08CLEARED - Expedited Applies2017-07-2532.63 HA313021S1213644E3km N'ly of WidgiemoolthaNgadju(WC1999/002)WC1999/002WAD6020/1998truePartially Determined13GoldfieldsNative Title Services Goldfields
13-Feb-2017 Tenement AmalgamationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2017-03-082017-07-08CLEARED - Expedited Applies2017-07-2514.06 HA312958S121366E3km N'ly of WidgiemoolthaNgadju(WC1999/002)WC1999/002WAD6020/1998truePartially Determined13GoldfieldsNative Title Services Goldfields
09-Feb-2004 Tenement ApplicationIn Progress