# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 28-Oct-2005 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 19-Dec-2024 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 28-Oct-2005 | 18-Dec-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 28-Oct-2005 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 28-Oct-2005 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 28-Oct-2005 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 28-Oct-2005 | |
7 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (PoW Reg ID 90124) "Exploration Environmental Management Plan - Higginsville Operations" dated 26 November 2020 by Timonthy Orme and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-90124 as Doc ID 7911988
| 09-Dec-2020 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 28-Oct-2005 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 19-Dec-2024 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 28-Oct-2005 | 18-Dec-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 28-Oct-2005 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 28-Oct-2005 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 28-Oct-2005 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 28-Oct-2005 | |
7 | 1 | The construction and operation of the project and measures to protect the environment to be carried out in accordance with the document titled:
- (PoW Reg ID 90124) "Exploration Environmental Management Plan - Higginsville Operations" dated 26 November 2020 by Timonthy Orme and retained on Department of Mines, Industry Regulation and Safety File No. EARS-POW-90124 as Doc ID 7911988
| 09-Dec-2020 | |
Type | Number | Details |
Application to Amend | 182H/045 | Lodged 3:35:00 PM on 12 Oct 2004 amending the address to "c/- Barrick Gold of Australia Limited Locked Bag 12 Cloisters Square WA 6850"REGISTERED 3:35 PM 12 Oct 2004 |
Partial Surrender - Compulsory | 302004 | Lodged:10:04 17 October 2008Section:Section 65 (1)(a)Surrendered Blocks:KALGOORLIE 3117 d, e, k, p
KALGOORLIE 3118 f, l, m, q, r, s, v, w
KALGOORLIE 3190 a, fSurrendered Total:14 BL.REGISTERED:23:59:59 27 October 2008Surrendered area to be released 08:30:00 13/02/2009 under Section 65(5)Surrendered area released 08:30:00 13/02/2009 under Section 65(5) |
Exemption from Drop-off | 333022 | Lodged:10:30 23 October 2009applying for relief from the provisions of Section 65(1)(b)RECORDED:10:30 23 October 2009GRANTED:21 June 2010 |
Extension / Renewal of Term | 357622 | Lodged:13:35 18 October 2010Applied For Period:2 YearsRECORDED:13:35 18 October 2010GRANTED:07 December 2010Granted Period:2 YearsTerm Extended To:27/10/2012 |
Extension / Renewal of Term | 409057 | Lodged:12:55 26 October 2012Applied For Period:2 YearsRECORDED:12:55 26 October 2012GRANTED:15 November 2012Granted Period:2 YearsTerm Extended To:27/10/2014 |
Application to Amend | 434823 | Lodged:14:50 11 November 2013Amending:AddressFrom:AVOCA RESOURCES LTD, ATTN: DES STEEL (TENEMENT-GIS CO-ORDINATOR), PO BOX 796, KALGOORLIE, WA, 6430To:AVOCA RESOURCES LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947RECORDED:14:50 11 November 2013 |
Application to Amend | 441222 | Lodged:10:30:44 28 February 2014Amending:NameFrom:AVOCA RESOURCES LTDTo:AVOCA RESOURCES PTY LTDRECORDED:10:30:44 28 February 2014 |
Extension / Renewal of Term | 456657 | Lodged:14:50 23 October 2014Applied For Period:1 YearsRECORDED:14:50 23 October 2014GRANTED:21 May 2015Granted Period:1 YearsTerm Extended To:27/10/2015 |
Amalgamation | 461046 | Lodged:15:20 22 January 2015Amalgamating:Portion of former P 15/5695Situated within:External boundaries of E 15/786Amalgamating:Portion of former P 15/5696Situated within:External boundaries of E 15/786Amalgamating:Portion of former P 15/5697Situated within:External boundaries of E 15/786Granted 08/07/2015 in respect to P15/5695, P15/5696 & P15/5697 |
Extension / Renewal of Term | 476280 | Lodged:15:00 21 October 2015Applied For Period:1 YearsRECORDED:15:00 21 October 2015GRANTED:22 December 2015Granted Period:1 YearsTerm Extended To:27/10/2016 |
Extension / Renewal of Term | 495766 | Lodged:15:25 18 October 2016Applied For Period:1 YearsRECORDED:15:25 18 October 2016GRANTED:24 January 2017Granted Period:1 YearsTerm Extended To:27/10/2017 |
Extension / Renewal of Term | 517105 | Lodged:14:55 26 October 2017Applied For Period:1 YearsRECORDED:14:55 26 October 2017GRANTED:28 December 2017Granted Period:1 YearsTerm Extended To:27/10/2018 |
Application to Amend | 523327 | Lodged:15:26:54 09 February 2018Amending:Address (Including DTC Details)From:Principal Place of Business : AVOCA RESOURCES PTY LTD, SAME AS CORRESPONDENCE and DTC :AVOCA RESOURCES PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : AVOCA RESOURCES PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :AVOCA RESOURCES PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:15:26:54 09 February 2018 |
Extension / Renewal of Term | 540755 | Lodged:11:08:57 17 October 2018Applied For Period:1 YearsRECORDED:11:08:57 17 October 2018GRANTED:08 January 2019Granted Period:1 YearsTerm Extended To:27/10/2019 |
Application to Amend | 556389 | Lodged:13:05:38 18 June 2019Amending:Address (Including DTC Details)From:Principal Place of Business : AVOCA RESOURCES PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :AVOCA RESOURCES PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400To:Principal Place of Business : AVOCA RESOURCES PTY LTD, C/- DEBLIN TENEMENT MANAGEMENT SERVICES, PO BOX 456, MOUNT HAWTHORN, WA, 6915, xxxx@deblin.com.au, xxxxxxx190 and DTC :AVOCA RESOURCES PTY LTD, THE TENEMENT MANAGER, DEBLIN TENEMENT MANAGEMENT SERVICES, PO BOX 456, MOUNT HAWTHORN, WA, 6915, xxxx@deblin.com.au, xxxxxxx190RECORDED:13:05:38 18 June 2019 |
Mortgage | 562261 | Lodged:08:30 03 September 2019Mortgaged Shares:100/100 shares AVOCA RESOURCES PTY LTDMortgagee:CORTLAND CREDIT LENDING CORPORATIONREGISTERED:08:30 03 September 2019DISCHARGED:09:14:55 15 July 2022Full Discharge:653490 Registered 09:14:55 15 July 2022 |
Extension / Renewal of Term | 565381 | Lodged:08:30 24 October 2019Applied For Period:1 YearsRECORDED:08:30 24 October 2019GRANTED:12 March 2020Granted Period:1 YearsTerm Extended To:27/10/2020 |
Extension / Renewal of Term | 588762 | Lodged:08:30 23 October 2020Applied For Period:1 YearsRECORDED:08:30 23 October 2020GRANTED:16 December 2020Granted Period:1 YearsTerm Extended To:27/10/2021 |
Extension of Time | 589764 | Lodged:14:43:17 06 November 2020Type:OtherRECORDED:14:43:17 06 November 2020APPROVED:09:25:06 11 November 2020Time extended to 30 November 2020 |
Extension / Renewal of Term | 634538 | Lodged:08:30 22 October 2021Applied For Period:1 YearsRECORDED:08:30 22 October 2021GRANTED:20 December 2021Granted Period:1 YearsTerm Extended To:27/10/2022 |
Mortgage - Discharge | 653490 | Lodged:09:14:55 15 July 2022In respect to:Mortgage 562261REGISTERED:09:14:55 15 July 2022 |
Extension / Renewal of Term | 661804 | Lodged:10:28:43 25 October 2022Applied For Period:1 YearsRECORDED:10:28:43 25 October 2022GRANTED:08 December 2022Granted Period:1 YearsTerm Extended To:27/10/2023 |
Mortgage | 674050 | Lodged:14:32:20 21 April 2023Mortgaged Shares:100/100 shares AVOCA RESOURCES PTY LTDMortgagee:MACQUARIE BANK LIMITEDREGISTERED:14:32:20 21 April 2023DISCHARGED:14:15 31 July 2024Full Discharge:711092 Registered 14:15 31 July 2024 |
Extension / Renewal of Term | 687249 | Lodged:08:30 05 October 2023Applied For Period:1 YearsRECORDED:08:30 05 October 2023GRANTED:05 January 2024Granted Period:1 YearsTerm Extended To:27/10/2024 |
Caveat | 700532 | Lodged:15:16:40 05 April 2024Caveat Type:Consent CaveatCaveator:KALI METALS LIMITEDShares Caveated:100/100 shares AVOCA RESOURCES PTY LTDRECORDED:15:16:40 05 April 2024 |
Mortgage - Discharge | 711092 | Lodged:14:15 31 July 2024In respect to:Mortgage 674050REGISTERED:14:15 31 July 2024 |
Extension / Renewal of Term | 716798 | Lodged:08:30 14 October 2024Applied For Period:1 YearsRECORDED:08:30 14 October 2024GRANTED:06 January 2025Granted Period:1 YearsTerm Extended To:27/10/2025 |