1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 11-Mar-2020 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Mar-2020 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Mar-2020 | |
4 | 1 | The rights of ingress to and egress from Miscellaneous Licence 15/254 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 11-Mar-2020 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 11-Mar-2020 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Mar-2020 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Mar-2020 | |
4 | 1 | The rights of ingress to and egress from Miscellaneous Licence 15/254 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 11-Mar-2020 | |
Type | Number | Details |
Objection | 529058 | Lodged:15:29:42 01 May 2018Objectors:APOLLO PHOENIX RESOURCES PTY LTDObjection Type:Tenement ApplicationRECORDED:15:29:42 01 May 2018FINALISED:14:20 29 March 2019Wardens Decision Made on:14:20 29 March 2019Wardens Decision Status:FinalisedWardens Decision Text:Objection withdrawn by consent |
Caveat | 709424 | Lodged:12:35:22 15 July 2024Caveat Type:Consent CaveatCaveator:A.C.N. 654 242 690 PTY LTDShares Caveated:100/100 shares DYNAMIC METALS LIMITEDRECORDED:12:35:22 15 July 2024 |
Extension / Renewal of Term | 727398 | Lodged:08:30 05 March 2025Applied For Period:5 YearsRECORDED:08:30 05 March 2025GRANTED:21 May 2025Granted Period:5 YearsTerm Extended To:10/03/2030 |