Extracted from MTO on 09-Jul-2025 00:44,
last changed 30-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulations and Safety (DMIRS). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 30-Nov-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-Nov-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-Nov-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulations and Safety (DMIRS). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 30-Nov-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-Nov-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-Nov-2017 | |
Type | Number | Details |
Forfeiture | 639304 | Initiated:17/01/2022 for non-compliance with rent requirementsRECORDED:09:52 17 January 2022Notice Issued:Regulation 50 Notice sent 17/01/2022 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- non payment of rent.Compliance Date:21/02/2022FINALISED:Order by Minister on 10 March 2022 that E 15/1605 be Penalty Imposed |
Fine | 644906 | Fine in respect to:Forfeiture Process 639304Fine reason:Non-compliance with rent obligationsPenalty amount:$198.00Notification date:17/03/2022Due date:21/04/2022Pursuant to:Section 96A(5)RECORDED:17 March 2022PAYMENT RECEIVED:18 March 2022FINALISED:18 March 2022Receipt Number:10249167Amount:$198.00Remaining balance:$0.00 |
Forfeiture | 645556 | Initiated:24/03/2022 for non-compliance with reporting requirements( Form 5 )RECORDED:11:32:09 23 March 2022Notice Issued:Regulation 50 Notice sent 24/03/2022 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- late lodgement of Form 5.Compliance Date:29/04/2022FINALISED:Order by Minister on 08 June 2022 that E 15/1605 be Penalty Imposed |
Fine | 651014 | Fine in respect to:Forfeiture Process 645556Fine reason:Non-compliance with expenditure obligationsPenalty amount:$90.00Notification date:09/06/2022Due date:14/07/2022Pursuant to:Section 96A(5)RECORDED:08 June 2022PAYMENT RECEIVED:10 June 2022FINALISED:13 June 2022Receipt Number:10268365Amount:$90.00Remaining balance:$0.00 |
Extension / Renewal of Term | 664251 | Lodged:08:30 30 November 2022Applied For Period:5 YearsRECORDED:08:30 30 November 2022LAPSED:30 November 2022 |
Expiry - Full | 666815 | EFFECTIVE:Midnight 29 November 2022 |