Extracted from MTO on 09-Jul-2025 00:26,
last changed 01-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety (DMIRS). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 30-Nov-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-Nov-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-Nov-2017 | |
4 | 1 | The rights of ingress to and egress from Pending Miscellaneous Licence 15/217 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 30-Nov-2017 | |
5 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 30-Nov-2017 | |
| 1 | In respect to Rail Corridor Land RCL/9 Wigiemooltha to Kambalda West: | 30-Nov-2017 | |
6 | 1 | No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land RCL/9 (Widgiemooltha to Kambalda West) as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978. | 30-Nov-2017 | |
7 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by Condition 6 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DMIRS. | 30-Nov-2017 | |
8 | 1 | Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition 6 hereof being approved by the State Mining Engineer, DMIRS in consultation with the operator of the railway on corridor land. | 30-Nov-2017 | |
9 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 6 hereof without the prior approval of the operator of the railway on corridor land. | 30-Nov-2017 | |
10 | 1 | The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 6 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DMIRS. | 30-Nov-2017 | |
11 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods Safety Branch, DMIRS. | 30-Nov-2017 | |
12 | 1 | The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA. | 30-Nov-2017 | |
13 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land. | 30-Nov-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety (DMIRS). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 30-Nov-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 30-Nov-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 30-Nov-2017 | |
4 | 1 | The rights of ingress to and egress from Pending Miscellaneous Licence 15/217 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 30-Nov-2017 | |
5 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 30-Nov-2017 | |
| 1 | In respect to Rail Corridor Land RCL/9 Wigiemooltha to Kambalda West: | 30-Nov-2017 | |
6 | 1 | No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land RCL/9 (Widgiemooltha to Kambalda West) as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978. | 30-Nov-2017 | |
7 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by Condition 6 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DMIRS. | 30-Nov-2017 | |
8 | 1 | Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition 6 hereof being approved by the State Mining Engineer, DMIRS in consultation with the operator of the railway on corridor land. | 30-Nov-2017 | |
9 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 6 hereof without the prior approval of the operator of the railway on corridor land. | 30-Nov-2017 | |
10 | 1 | The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 6 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DMIRS. | 30-Nov-2017 | |
11 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods Safety Branch, DMIRS. | 30-Nov-2017 | |
12 | 1 | The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA. | 30-Nov-2017 | |
13 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land. | 30-Nov-2017 | |
Type | Number | Details |
Extension of Time | 505441 | Lodged:15:00 28 April 2017Type:Service on Tenement HolderRECORDED:15:00 28 April 2017APPROVED:09:11:27 08 May 2017 |
Forfeiture | 649306 | Initiated:16/05/2022 for non-compliance with reporting requirementsRECORDED:07:55 16 May 2022FINALISED:Order by Minister on 25 July 2023 that E 15/1601 be Penalty ImposedNotice Issued:Regulation 50 Notice sent 16/05/2022 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:20/06/2022 |
Extension / Renewal of Term | 664236 | Lodged:16:19:24 29 November 2022Applied For Period:5 YearsRECORDED:16:19:24 29 November 2022LAPSED:18 August 2023 |
Fine | 682354 | Fine in respect to:Forfeiture Process 649306Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$4,950.00Notification date:28/07/2023Due date:01/09/2023Pursuant to:Section 96A(5)RECORDED:28 July 2023PAYMENT RECEIVED:30 August 2023FINALISED:30 August 2023Receipt Number:10402348Amount:$4,950.00Remaining balance:$0.00 |
Surrender - Outright | 684032 | Lodged:15:29:26 18 August 2023REGISTERED:15:29:26 18 August 2023 |