Extracted from MTO on 13-Jul-2025 00:42,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 15-Apr-2024 | |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 03-Aug-2018 | 14-Apr-2024 |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Aug-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Aug-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 03-Aug-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 03-Aug-2018 | |
6 | 1 | The rights of ingress to and egress from Miscellaneous Licence 15/355 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 03-Aug-2018 | |
7 | 1 | No interference with Geodetic Survey Station SSM-KG 16 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 03-Aug-2018 | |
8 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 15-Apr-2024 | |
9 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 15-Apr-2024 | |
10 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 15-Apr-2024 | |
Cond # | Ver | Text | Start | End |
1 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 15-Apr-2024 | |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 03-Aug-2018 | 14-Apr-2024 |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Aug-2018 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Aug-2018 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 03-Aug-2018 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 03-Aug-2018 | |
6 | 1 | The rights of ingress to and egress from Miscellaneous Licence 15/355 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 03-Aug-2018 | |
7 | 1 | No interference with Geodetic Survey Station SSM-KG 16 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 03-Aug-2018 | |
8 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 15-Apr-2024 | |
9 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 15-Apr-2024 | |
10 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 15-Apr-2024 | |
Type | Number | Details |
Objection | 501699 | Lodged:11:18:46 27 February 2017Objectors:GOLDEN EAGLE MINING LTDObjection Type:Tenement ApplicationRECORDED:11:18:46 27 February 2017WITHDRAWN:00:00 17 January 2018Wardens Decision Made on:00:00 17 January 2018Wardens Decision Status:Finalised |
Objection | 502017 | Lodged:14:01:36 02 March 2017Objectors:BULLABULLING OPERATIONS PTY LTDObjection Type:Tenement ApplicationRECORDED:14:01:36 02 March 2017WITHDRAWN:00:00 09 June 2017Wardens Decision Made on:00:00 09 June 2017Wardens Decision Status:Finalised |
Application to Amend | 502052 | Lodged:09:59:43 03 March 2017Amending:Address (Including DTC Details)From:Principal Place of Business : MGK RESOURCES PTY LTD, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024 and DTC :MGK RESOURCES PTY LTD, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024To:Principal Place of Business : MGK RESOURCES PTY LTD, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913, xxxxxx@mk2consulting.com.au, xxxxxxx555 and DTC :MGK RESOURCES PTY LTD, MGK RESOURCES PTY LTD, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913, xxxxxx@mk2consulting.com.au, xxxxxxx555RECORDED:09:59:43 03 March 2017 |
Application to Amend | 514513 | Lodged:16:15:48 13 September 2017Amending:Address (Including DTC Details)From:Principal Place of Business : MGK RESOURCES PTY LTD, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913, xxxxxx@mk2consulting.com.au, xxxxxxx555 and DTC :MGK RESOURCES PTY LTD, MGK RESOURCES PTY LTD, C/- MKII CONSULTING PTY LTD, PO BOX 753, WEMBLEY, WA, 6913, xxxxxx@mk2consulting.com.au, xxxxxxx555To:Principal Place of Business : MGK RESOURCES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :MGK RESOURCES PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:16:15:48 13 September 2017 |
Application to Amend | 530814 | Lodged:13:57:29 21 May 2018Amending:Address (Including DTC Details)From:MGK RESOURCES PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997To:MGK RESOURCES PTY LTD, ALT RESOURCES LIMITED, 11-13 BAGGS STREET, JINDABYNE, NSW, 2627, xxxx@altresources.com.au, xxxxxxx915REJECTED:13:57:29 21 May 2018 |
Application to Amend | 530949 | Lodged:08:30 23 May 2018Amending:Address (Including DTC Details)From:Principal Place of Business : MGK RESOURCES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :MGK RESOURCES PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997To:Principal Place of Business : MGK RESOURCES PTY LTD, 11-13 BAGGS STREET, JINDABYNE, NSW, 2627, xxxx@altresources.com.au, xxxxxxxxx001 and DTC :MGK RESOURCES PTY LTD, C/O ALT RESOURCES LIMITED, 11-13 BAGGS STREET, JINDABYNE, NSW, 2627, xxxx@altresources.com.au, xxxxxxxxx001RECORDED:08:30 23 May 2018 |
Application to Amend | 537117 | Lodged:10:11:26 15 August 2018Amending:Address (Including DTC Details)From:Principal Place of Business : MGK RESOURCES PTY LTD, 11-13 BAGGS STREET, JINDABYNE, NSW, 2627, xxxx@altresources.com.au, xxxxxxxxx001 and DTC :MGK RESOURCES PTY LTD, C/O ALT RESOURCES LIMITED, 11-13 BAGGS STREET, JINDABYNE, NSW, 2627, xxxx@altresources.com.au, xxxxxxxxx001To:Principal Place of Business : MGK RESOURCES PTY LTD, PO BOX 1054, JINDABYNE, NSW, 2627, xxxx@altresources.com.au, xxxxxxx915 and DTC :MGK RESOURCES PTY LTD, MGK RESOURCES PTY LTD, PO BOX 1054, JINDABYNE, NSW, 2627, xxxx@altresources.com.au, xxxxxxx915RECORDED:10:11:26 15 August 2018 |
Application to Amend | 542648 | Lodged:15:40 13 November 2018Amending:Address (Including DTC Details)From:Principal Place of Business : MGK RESOURCES PTY LTD, PO BOX 1054, JINDABYNE, NSW, 2627, xxxx@altresources.com.au, xxxxxxx915 and DTC :MGK RESOURCES PTY LTD, MGK RESOURCES PTY LTD, PO BOX 1054, JINDABYNE, NSW, 2627, xxxx@altresources.com.au, xxxxxxx915To:Principal Place of Business : MGK RESOURCES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxx997 and DTC :MGK RESOURCES PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxx997RECORDED:15:40 13 November 2018 |
Extension / Renewal of Term | 682698 | Lodged:11:44:08 02 August 2023Applied For Period:5 YearsRECORDED:11:44:08 02 August 2023GRANTED:28 September 2023Granted Period:5 YearsTerm Extended To:02/08/2028 |
Application to Amend | 686021 | Lodged:14:53 14 September 2023Amending:Address (Including DTC Details)FromToRECORDED:14:53 14 September 2023 |
Application to Amend | 701878 | Lodged:14:17:25 19 April 2024Amending:Address (Including DTC Details)From:Principal Place of Business : ORIGIN GOLD MINES HOLDINGS PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :ORIGIN GOLD MINES HOLDINGS PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997To:Principal Place of Business : ORIGIN GOLD MINES HOLDINGS PTY LTD, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxx@atmwa.net.au, xxxxxxx699 and DTC :ORIGIN GOLD MINES HOLDINGS PTY LTD, NINA MAS, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxx@atmwa.net.au, xxxxxxx699RECORDED:14:17:25 19 April 2024 |
Partial Surrender - Voluntary | 710259 | Lodged:09:45:54 24 July 2024Surrendered Blocks:KALGOORLIE 2386 u, z
KALGOORLIE 2387 e, j, k, o, p, q, r, s, t, u, v, w, x, y, z
KALGOORLIE 2388 a, f, l
KALGOORLIE 2459 a, b, c, d, e
KALGOORLIE 2460 aSurrendered Total:26 BL.REGISTERED:09:45:54 24 July 2024 |