Extracted from MTO on 09-Jul-2025 01:19,
last changed 09-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulations and Safety (DMIRS)). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 14-Nov-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 14-Nov-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 14-Nov-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 14-Nov-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 14-Nov-2017 | |
6 | 1 | No interference with Geodetic Survey Station SSM-KG 16 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 14-Nov-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulations and Safety (DMIRS)). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 14-Nov-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 14-Nov-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 14-Nov-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 14-Nov-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 14-Nov-2017 | |
6 | 1 | No interference with Geodetic Survey Station SSM-KG 16 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 14-Nov-2017 | |
Type | Number | Details |
Application to Amend | 501750 | Lodged:15:02 27 February 2017Amending:LocalityFrom:Jeordi HillsTo:Jaurdie HillsRECORDED:15:02 27 February 2017 |
Objection | 502256 | Lodged:11:27:06 08 March 2017Objectors:MGK RESOURCES PTY LTDObjection Type:Tenement ApplicationRECORDED:11:27:06 08 March 2017WITHDRAWN:00:00 07 June 2017Wardens Decision Made on:00:00 07 June 2017Wardens Decision Status:Finalised |
Extension / Renewal of Term | 663086 | Lodged:10:19:37 11 November 2022Applied For Period:5 YearsRECORDED:10:19:37 11 November 2022GRANTED:05 January 2023Granted Period:5 YearsTerm Extended To:13/11/2027 |
Application to Amend | 678776 | Lodged:12:11:52 19 June 2023Amending:Address (Including DTC Details)From:Principal Place of Business : LYSANDER RESOURCES PTY LTD, PO BOX 366, KALGOORLIE, WA, 6433 and DTC :LYSANDER RESOURCES PTY LTD, LYSANDER RESOURCES PTY LTD, PO BOX 366, KALGOORLIE, WA, 6433To:Principal Place of Business : LYSANDER RESOURCES PTY LTD, PO BOX 404, WEST PERTH, WA, 6872, xxxxxxxxxxx@hotmail.com, xxxxxxx326 and DTC :LYSANDER RESOURCES PTY LTD, LYSANDER RESOURCES PTY LTD, PO BOX 404, WEST PERTH, WA, 6872, xxxxxxxxxxx@hotmail.com, xxxxxxx326RECORDED:12:11:52 19 June 2023 |