Extracted from MTO on 06-Jul-2025 00:48,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 11-Oct-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Oct-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Oct-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 11-Oct-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 11-Oct-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 11-Oct-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Oct-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Oct-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 11-Oct-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 11-Oct-2017 | |
Type | Number | Details |
Application to Amend | 616447 | Lodged:14:27:01 23 February 2021Amending:Address (Including DTC Details)From:Principal Place of Business : ST IVES GOLD MINING COMPANY PTY LIMITED, C/- TENEMENTS, PO BOX 628, WEST PERTH, WA, 6872, xxxxxxxxxxxxxx@goldfields.com, xxxxx204 and DTC :ST IVES GOLD MINING COMPANY PTY LIMITED, GEMMA GLASS / RACHAEL CHALMERS, C/- TENEMENTS, PO BOX 628, WEST PERTH, WA, 6872, xxxxxxxxxxxxxx@goldfields.com, xxxxx204To:Principal Place of Business : ST IVES GOLD MINING COMPANY PTY LIMITED, ADDRESS NOT PROVIDED and DTC :ST IVES GOLD MINING COMPANY PTY LIMITED, GEMMA GLASS / RACHAEL CHALMERS, C/- TENEMENTS, GPO BOX 2731, CLOISTERS SQUARE PO, WA, 6850, xxxxxxxxxxxxxx@goldfields.com, xxxxx204RECORDED:14:27:01 23 February 2021 |
Extension / Renewal of Term | 658453 | Lodged:15:32:55 12 September 2022Applied For Period:5 YearsRECORDED:15:32:55 12 September 2022GRANTED:29 November 2022Granted Period:5 YearsTerm Extended To:10/10/2027 |
Partial Surrender - Voluntary | 687482 | Lodged:11:13:28 09 October 2023Surrendered Blocks:KALGOORLIE 2976 d, p, u, z
KALGOORLIE 2977 l, q, v
KALGOORLIE 3048 e
KALGOORLIE 3049 a, f
KALGOORLIE 3121 a, fSurrendered Total:12 BL.REGISTERED:11:13:28 09 October 2023 |