Extracted from MTO on 14-May-2022 09:01,
last changed 04-Jul-2021.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Jul-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Jul-2017 | |
3 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 03-Jul-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 03-Jul-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 03-Jul-2017 | |
3 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 03-Jul-2017 | |
Type | Number | Details |
Extension of Time | 538171 | Lodged:13:29:41 31 August 2018Type:Form 5RECORDED:13:29:41 31 August 2018WITHDRAWN:15:28 13 September 2018 |
Extension of Time | 538173 | Lodged:13:33:44 31 August 2018Type:Form 5RECORDED:13:33:44 31 August 2018APPROVED:15:15:56 13 September 2018Time to lodge extended to 07 Sep 2018 |
Surrender - Outright | 561082 | Lodged:10:30 19 August 2019REJECTED:10:30 19 August 2019 |
Surrender - Outright | 561126 | Lodged:14:26:06 19 August 2019REGISTERED:14:26:06 19 August 2019 |