Extracted from MTO on 11-Jul-2025 00:37,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 14-Aug-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 14-Aug-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 14-Aug-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 14-Aug-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 14-Aug-2017 | |
6 | 1 | No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 14-Aug-2017 | |
7 | 1 | No excavation, excepting shafts, approaching closer to the Great Eastern Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Eastern Highway or Highway verge being confined to below a depth of 30 metres from the natural surface. | 14-Aug-2017 | |
8 | 1 | No interference with Geodetic Survey Station SSM-BOORABBIN 12, SSM-BOORABBIN 12T & SSM-BOORABBIN 14 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 14-Aug-2017 | |
9 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 14-Aug-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 14-Aug-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 14-Aug-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 14-Aug-2017 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 14-Aug-2017 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 14-Aug-2017 | |
6 | 1 | No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 14-Aug-2017 | |
7 | 1 | No excavation, excepting shafts, approaching closer to the Great Eastern Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Eastern Highway or Highway verge being confined to below a depth of 30 metres from the natural surface. | 14-Aug-2017 | |
8 | 1 | No interference with Geodetic Survey Station SSM-BOORABBIN 12, SSM-BOORABBIN 12T & SSM-BOORABBIN 14 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 14-Aug-2017 | |
9 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 14-Aug-2017 | |
Type | Number | Details |
Objection | 494112 | Lodged:14:01:20 19 September 2016Objectors:NORTON GOLD FIELDS LIMITEDObjection Type:Tenement ApplicationRECORDED:14:01:20 19 September 2016WITHDRAWN:00:00 22 February 2017Wardens Decision Made on:00:00 22 February 2017Wardens Decision Status:Finalised |
Application to Amend | 546645 | Lodged:14:15 25 January 2019Amending:NameFrom:GOLDEN EAGLE MINING LTDTo:COOLGARDIE MINERALS LIMITEDAmending:Address (Including DTC Details)From:Principal Place of Business : GOLDEN EAGLE MINING LTD, UNIT 6, 100 RAILWAY ROAD, SUBIACO, WA, 6008 and DTC :GOLDEN EAGLE MINING LTD, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024To:Principal Place of Business : COOLGARDIE MINERALS LIMITED, 23 ALTONA STREET, WEST PERTH, WA, 6005 and DTC :COOLGARDIE MINERALS LIMITED, MARCO TENTORI, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxxx@atmwa.net.au, xxxxxxx095RECORDED:14:15 25 January 2019 |
Application to Amend | 546647 | Lodged:14:15 25 January 2019REJECTED:14:15 25 January 2019 |
Mortgage | 547326 | Lodged:16:00 07 February 2019Mortgaged Shares:100/100 shares COOLGARDIE MINERALS LIMITEDMortgagee:SMS INNOVATIVE MINING PTY LTDREGISTERED:16:00 07 February 2019DISCHARGED:13:58:49 08 August 2023Full Discharge:683216 Registered 13:58:49 08 August 2023 |
Caveat | 564632 | Lodged:13:00:11 14 October 2019Caveat Type:Absolute CaveatCaveator:SHIRE OF COOLGARDIEShares Caveated:100/100 shares COOLGARDIE MINERALS LIMITEDRECORDED:13:00:11 14 October 2019WITHDRAWN:12:21:04 30 January 2023 |
Application to Amend | 626396 | Lodged:14:56:46 17 June 2021Amending:Address (Including DTC Details)From:Principal Place of Business : COOLGARDIE MINERALS LIMITED, 23 ALTONA STREET, WEST PERTH, WA, 6005 and DTC :COOLGARDIE MINERALS LIMITED, MARCO TENTORI, C/- ANDERSON'S TENEMENT MANAGEMENT, PO BOX 2162, WARWICK, WA, 6024, xxxxxx@atmwa.net.au, xxxxxxx095To:Principal Place of Business : COOLGARDIE MINERALS LIMITED, C/-MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997 and DTC :COOLGARDIE MINERALS LIMITED, MCMAHON MINING TITLE SERVICES PTY LTD, C/-MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxx997RECORDED:14:56:46 17 June 2021 |
Extension / Renewal of Term | 655650 | Lodged:11:24:26 12 August 2022Applied For Period:5 YearsRECORDED:11:24:26 12 August 2022GRANTED:14 October 2022Granted Period:5 YearsTerm Extended To:13/08/2027 |
Withdrawal of Dealing | 667854 | Lodged:12:21:04 30 January 2023In respect to:Caveat 564632RECORDED:12:21:04 30 January 2023 |
Mortgage - Discharge | 683216 | Lodged:13:58:49 08 August 2023In respect to:Mortgage 547326REGISTERED:13:58:49 08 August 2023 |
Partial Surrender - Compulsory | 683274 | Lodged:11:19:25 09 August 2023Section:Section 65 (3)Surrendered Blocks:KALGOORLIE 2530 b, c, g, h, n, s, w, x
KALGOORLIE 2602 c, j, o
KALGOORLIE 2674 b, g, mSurrendered Total:14 BL.REGISTERED:Midnight 13 August 2023Surrendered area to be released 08:30:00 29/09/2023 under Section 65 (3)Surrendered area released 08:30:00 29/09/2023 under Section 65 (3) |