Extracted from MTO on 26-Jun-2025 00:32,
last changed 27-Feb-2024.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 11-Oct-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Oct-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Oct-2017 | |
4 | 1 | No excavation, excepting shafts, approaching closer to the Coolgardie Esperance Highway Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Coolgardie Esperance Highway Highway or Highway verge being confined to below a depth of 30 metres from the natural surface. | 11-Oct-2017 | |
5 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on FNA 0010902. | 11-Oct-2017 | |
6 | 1 | No interference with Geodetic Survey Stations SSM-WID28, SSM-WID 29, SSM-WID 30 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 11-Oct-2017 | |
7 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 11-Oct-2017 | |
8 | 1 | No mining within 25 metres of either side of the Pipeline Licence contained within Pipeline Licence No 59 as shown in TENGRAPH. | 11-Oct-2017 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMIRS. | 11-Oct-2017 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Pipeline Licence 59. | 11-Oct-2017 | |
11 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMIRS. | 11-Oct-2017 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 59 without the prior written consent of the Director Petroleum DMIRS. | 11-Oct-2017 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMIRS. | 11-Oct-2017 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 59. | 11-Oct-2017 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 59. | 11-Oct-2017 | |
16 | 1 | No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land RCL0000009 as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978. | 11-Oct-2017 | |
17 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by Condition 16 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Resources Safety Division, DMIRS. | 11-Oct-2017 | |
18 | 1 | Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition 16 hereof being approved by the Resources Safety Division, DMIRS in consultation with the operator of the railway on corridor land. | 11-Oct-2017 | |
19 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 16 hereof without the prior approval of the operator of the railway on corridor land. | 11-Oct-2017 | |
20 | 1 | The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 16 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Resources Safety Division, DMIRS. | 11-Oct-2017 | |
21 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods and Petroleum Safety Branch, DMIRS. | 11-Oct-2017 | |
22 | 1 | The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA. | 11-Oct-2017 | |
23 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land. | 11-Oct-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, DMIRS. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMIRS. | 11-Oct-2017 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 11-Oct-2017 | |
3 | 1 | Unless the written approval of the Environmental Officer, DMIRS is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 11-Oct-2017 | |
4 | 1 | No excavation, excepting shafts, approaching closer to the Coolgardie Esperance Highway Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Coolgardie Esperance Highway Highway or Highway verge being confined to below a depth of 30 metres from the natural surface. | 11-Oct-2017 | |
5 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on FNA 0010902. | 11-Oct-2017 | |
6 | 1 | No interference with Geodetic Survey Stations SSM-WID28, SSM-WID 29, SSM-WID 30 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 11-Oct-2017 | |
7 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 11-Oct-2017 | |
8 | 1 | No mining within 25 metres of either side of the Pipeline Licence contained within Pipeline Licence No 59 as shown in TENGRAPH. | 11-Oct-2017 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 8 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMIRS. | 11-Oct-2017 | |
10 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 8 hereof without the prior approval of the operators of the Pipeline Licence 59. | 11-Oct-2017 | |
11 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 8 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMIRS. | 11-Oct-2017 | |
12 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 59 without the prior written consent of the Director Petroleum DMIRS. | 11-Oct-2017 | |
13 | 1 | Mining on the Safety Zone established in Condition 8 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMIRS. | 11-Oct-2017 | |
14 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 8 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 59. | 11-Oct-2017 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 59. | 11-Oct-2017 | |
16 | 1 | No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land RCL0000009 as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978. | 11-Oct-2017 | |
17 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by Condition 16 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Resources Safety Division, DMIRS. | 11-Oct-2017 | |
18 | 1 | Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition 16 hereof being approved by the Resources Safety Division, DMIRS in consultation with the operator of the railway on corridor land. | 11-Oct-2017 | |
19 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 16 hereof without the prior approval of the operator of the railway on corridor land. | 11-Oct-2017 | |
20 | 1 | The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 16 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Resources Safety Division, DMIRS. | 11-Oct-2017 | |
21 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods and Petroleum Safety Branch, DMIRS. | 11-Oct-2017 | |
22 | 1 | The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA. | 11-Oct-2017 | |
23 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land. | 11-Oct-2017 | |
Type | Number | Details |
Application to Amend | 525711 | Lodged:16:11:13 15 March 2018Amending:Address (Including DTC Details)From:Principal Place of Business : JINDALEE RESOURCES LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947 and DTC :JINDALEE RESOURCES LIMITED, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400To:Principal Place of Business : JINDALEE RESOURCES LIMITED, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxxxx400 and DTC :JINDALEE RESOURCES LIMITED, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxxxx400RECORDED:16:11:13 15 March 2018 |
Amalgamation | 576362 | Lodged:08:30 20 April 2020Amalgamating:Portion of former P 15/6108Situated within:External boundaries of E 15/1552Withdrawn 17/05/2021 in respect to P 15/6108 |
Extension / Renewal of Term | 660723 | Lodged:10:07:28 10 October 2022Applied For Period:5 YearsRECORDED:10:07:28 10 October 2022GRANTED:14 December 2022Granted Period:5 YearsTerm Extended To:10/10/2027 |
Surrender - Outright | 690302 | Lodged:13:46:39 17 November 2023REGISTERED:13:46:39 17 November 2023 |