Extracted from MTO on 06-Jul-2025 00:19,
last changed 28-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 23-Feb-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 23-Feb-2017 | |
3 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 23-Feb-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 23-Feb-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 23-Feb-2017 | |
3 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 23-Feb-2017 | |
Type | Number | Details |
Application to Amend | 528058 | Lodged:14:55:03 16 April 2018Amending:Address (Including DTC Details)From:Principal Place of Business : ALLIANCE (SA) PTY LTD, C/- GETS, PO BOX 10939, KALGOORLIE, WA, 6433, xxxx@getmining.com.au and DTC :ALLIANCE (SA) PTY LTD, TRACY BROWNING, C/- GETS, PO BOX 10939, KALGOORLIE, WA, 6433, xxxx@getmining.com.auTo:Principal Place of Business : ALLIANCE (SA) PTY LTD, SUITE 3, 51-55 CITY ROAD, SOUTHBANK, VIC, 3006 and DTC :ALLIANCE (SA) PTY LTD, GLOBAL EXPLORATION TENEMENT SERVICES, C/- GETS, PO BOX 10939, KALGOORLIE PO, WA, 6433, xxxx@getmining.com.au, xxxxxxxxx525RECORDED:14:55:03 16 April 2018 |
Surrender - Outright | 550337 | Lodged:11:31:53 27 March 2019REGISTERED:11:31:53 27 March 2019 |