Extracted from MTO on 13-Jul-2025 00:13,
last changed 05-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 12-Jun-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Jun-2017 | |
3 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 12-Jun-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 12-Jun-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Jun-2017 | |
3 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 12-Jun-2017 | |
Type | Number | Details |
Application to Amend | 508791 | Lodged:13:23:01 21 June 2017Amending:Address (Including DTC Details)From:WEST RESOURCE VENTURES PTY LTD, TENEMENT AGENT, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BC, WA, 6849, xxxxx@hemts.com.au, xxxxxxx977To:WEST RESOURCE VENTURES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:13:23:01 21 June 2017 |
Forfeiture | 566579 | Initiated:04/11/2019 for non-compliance with expenditure conditionsRECORDED:09:30 14 November 2019Notice Issued:Regulation 50 Notice sent 04/11/2019 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:04/12/2019LAPSED:25 November 2019 (surrendered) |
Surrender - Outright | 567012 | Lodged:13:31:40 20 November 2019REGISTERED:13:31:40 20 November 2019 |