1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 02-Feb-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 02-Feb-2017 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 02-Feb-2017 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 02-Feb-2017 | |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licence 15/160 being at all times preserved to the licensee's and no interference with the purpose or installations connected to the licences. | 02-Feb-2017 | |
6 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Conservation of Flora & Fauna Reserve 32552. | 02-Feb-2017 | |
7 | 1 | No mining within 25 metres of either side of the Goldfields Pipeline Licence 59 as shown in TENGRAPH. | 02-Feb-2017 | |
8 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP | 02-Feb-2017 | |
9 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Pipeline Licence 59. | 02-Feb-2017 | |
10 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP | 02-Feb-2017 | |
11 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 59 without the prior written consent of the State Mining Engineer DMP. | 02-Feb-2017 | |
12 | 1 | Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP . | 02-Feb-2017 | |
13 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 59. | 02-Feb-2017 | |
14 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 59. | 02-Feb-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 02-Feb-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 02-Feb-2017 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 02-Feb-2017 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 02-Feb-2017 | |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licence 15/160 being at all times preserved to the licensee's and no interference with the purpose or installations connected to the licences. | 02-Feb-2017 | |
6 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Conservation of Flora & Fauna Reserve 32552. | 02-Feb-2017 | |
7 | 1 | No mining within 25 metres of either side of the Goldfields Pipeline Licence 59 as shown in TENGRAPH. | 02-Feb-2017 | |
8 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 7 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP | 02-Feb-2017 | |
9 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 7 hereof without the prior approval of the operators of the Pipeline Licence 59. | 02-Feb-2017 | |
10 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 7 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP | 02-Feb-2017 | |
11 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 59 without the prior written consent of the State Mining Engineer DMP. | 02-Feb-2017 | |
12 | 1 | Mining on the Safety Zone established in Condition 7 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP . | 02-Feb-2017 | |
13 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 7 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 59. | 02-Feb-2017 | |
14 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 59. | 02-Feb-2017 | |
Type | Number | Details |
Application to Amend | 490226 | Lodged:14:20:17 07 July 2016Amending:Address (Including DTC Details)From:YANDAN GOLD MINES PTY LTD, C/-HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849To:YANDAN GOLD MINES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:14:20:17 07 July 2016 |
Forfeiture | 530459 | Initiated:24/05/2018 for non-compliance with expenditure requirementsRECORDED:09:45:13 17 May 2018Notice Issued:Regulation 50 Notice sent 24/05/2018 for non-compliance with expenditure requirements pursuant to Reg 21/Sec 63A- under expended.Compliance Date:28/06/2018FINALISED:Order by Minister on 11 September 2018 that E 15/1514 be Penalty Imposed |
Fine | 539077 | Fine in respect to:Forfeiture Process 530459Fine reason:Non-compliance with expenditure obligationsPenalty amount:$1,361.00Notification date:14/09/2018Due date:19/10/2018Pursuant to:Section 96A(5)RECORDED:13 September 2018PAYMENT RECEIVED:25 September 2018FINALISED:25 September 2018Receipt Number:87215033097Amount:$1,361.00Remaining balance:$0.00 |
Surrender - Outright | 546005 | Lodged:09:31:09 15 January 2019REGISTERED:09:31:09 15 January 2019 |