Extracted from MTO on 06-Jul-2025 00:20,
last changed 27-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 27-Jul-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 27-Jul-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 27-Jul-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 27-Jul-2016 | |
5 | 1 | No interference with Geodetic Survey Station SSM-BBN 104 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 27-Jul-2016 | |
6 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 27-Jul-2016 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Crown Reserve 10138 Quarry. | 27-Jul-2016 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 27-Jul-2016 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 27-Jul-2016 | |
3 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 27-Jul-2016 | |
4 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 27-Jul-2016 | |
5 | 1 | No interference with Geodetic Survey Station SSM-BBN 104 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 27-Jul-2016 | |
6 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 27-Jul-2016 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Crown Reserve 10138 Quarry. | 27-Jul-2016 | |
Type | Number | Details |
Application to Amend | 514836 | Lodged:10:34:57 19 September 2017Amending:Address (Including DTC Details)From:REED INDUSTRIAL MINERALS PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:REED INDUSTRIAL MINERALS PTY LTD, MINERAL RESOURCES, C/- TENEMENT DEPARTMENT, PO BOX 1095, CANNING BRIDGE, APPLECROSS, WA, 6153, xxxxxxxxxxxx@mineralresources.com.au, xxxxxx600RECORDED:10:34:57 19 September 2017 |
Extension of Time | 519298 | Lodged:15:00 29 November 2017Type:Exemption from ExpenditureRECORDED:15:00 29 November 2017APPROVED:16:20 20 December 2017 |
Surrender - Outright | 541945 | Lodged:16:28:25 01 November 2018REGISTERED:16:28:25 01 November 2018 |