# | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-Jan-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-Jan-2017 | |
3 | 1 | The rights of ingress to and egress from Miscellaneous Licence 15/217 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 09-Jan-2017 | |
4 | 1 | No mining within 25 metres of either side of the Goldfields Pipeline Licence 59 as shown in TENGRAPH. | 09-Jan-2017 | |
5 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 6 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP | 09-Jan-2017 | |
6 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 6 hereof without the prior approval of the operators of the Pipeline Licence 59 . | 09-Jan-2017 | |
7 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 6 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP | 09-Jan-2017 | |
8 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 59 without the prior written consent of the State Mining Engineer DMP. | 09-Jan-2017 | |
9 | 1 | Mining on the Safety Zone established in Condition 6 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP . | 09-Jan-2017 | |
10 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 6 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 59 . | 09-Jan-2017 | |
11 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 59 . | 09-Jan-2017 | |
12 | 1 | No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land 9 as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978. | 09-Jan-2017 | |
13 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by Condition 14 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DMP. | 09-Jan-2017 | |
14 | 1 | Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition 14 hereof being approved by the State Mining Engineer, DMP in consultation with the operator of the railway on corridor land. | 09-Jan-2017 | |
15 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 14 hereof without the prior approval of the operator of the railway on corridor land. | 09-Jan-2017 | |
16 | 1 | The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 14 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DMP. | 09-Jan-2017 | |
17 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods Safety Branch, DMP. | 09-Jan-2017 | |
18 | 1 | The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA. | 09-Jan-2017 | |
19 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land. | 09-Jan-2017 | |
20 | 1 | No interference with Geodetic Survey Station SSM-WID 22 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 09-Jan-2017 | |
21 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 09-Jan-2017 | |
22 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Unnumbered Land Act Reserve 14. | 09-Jan-2017 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-Jan-2017 | |
2 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-Jan-2017 | |
3 | 1 | The rights of ingress to and egress from Miscellaneous Licence 15/217 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 09-Jan-2017 | |
4 | 1 | No mining within 25 metres of either side of the Goldfields Pipeline Licence 59 as shown in TENGRAPH. | 09-Jan-2017 | |
5 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 6 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP | 09-Jan-2017 | |
6 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 6 hereof without the prior approval of the operators of the Pipeline Licence 59 . | 09-Jan-2017 | |
7 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 6 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP | 09-Jan-2017 | |
8 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 59 without the prior written consent of the State Mining Engineer DMP. | 09-Jan-2017 | |
9 | 1 | Mining on the Safety Zone established in Condition 6 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP . | 09-Jan-2017 | |
10 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 6 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 59 . | 09-Jan-2017 | |
11 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 59 . | 09-Jan-2017 | |
12 | 1 | No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land 9 as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978. | 09-Jan-2017 | |
13 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by Condition 14 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DMP. | 09-Jan-2017 | |
14 | 1 | Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition 14 hereof being approved by the State Mining Engineer, DMP in consultation with the operator of the railway on corridor land. | 09-Jan-2017 | |
15 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 14 hereof without the prior approval of the operator of the railway on corridor land. | 09-Jan-2017 | |
16 | 1 | The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 14 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DMP. | 09-Jan-2017 | |
17 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods Safety Branch, DMP. | 09-Jan-2017 | |
18 | 1 | The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA. | 09-Jan-2017 | |
19 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land. | 09-Jan-2017 | |
20 | 1 | No interference with Geodetic Survey Station SSM-WID 22 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 09-Jan-2017 | |
21 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 09-Jan-2017 | |
22 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Unnumbered Land Act Reserve 14. | 09-Jan-2017 | |
Type | Number | Details |
Extension of Time | 466039 | Lodged:10:00 21 April 2015Type:Service on Tenement HolderRECORDED:10:00 21 April 2015APPROVED:16:07 30 April 2015Approved by Warden 4:07pm 30 April 2015 |
Objection | 466758 | Lodged:16:19:54 01 May 2015Objectors:MARSDEN, Sam AndrewObjection Type:Tenement ApplicationRECORDED:16:19:54 01 May 2015FINALISED:15:10:27 20 May 2016Wardens Decision Made on:00:00 20 May 2016Wardens Decision Status:FinalisedWardens Decision Text:1. Recommendation E15/1465 proceed further to grant
2. Parties excused from attendance on 20/05/2016
3. No order as to costs |
Extension of Time | 467678 | Lodged:14:20 18 May 2015Type:ObjectionRECORDED:14:20 18 May 2015APPROVED:12:25:18 16 June 2015Approved by Warden 5:00pm 18/05/2015 |
Application to Amend | 485639 | Lodged:14:26:30 26 April 2016Amending:AddressFrom:YANDAN GOLD MINES PTY LTD, 27 GENERAL MACARTHUR PL, REDBANK, QLD, 4301To:YANDAN GOLD MINES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849RECORDED:14:26:30 26 April 2016 |
Application to Amend | 490226 | Lodged:14:20:17 07 July 2016Amending:Address (Including DTC Details)From:YANDAN GOLD MINES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849To:YANDAN GOLD MINES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:14:20:17 07 July 2016 |
Amalgamation | 499550 | Lodged:15:58 11 January 2017Amalgamating:Portion of former P 15/4799Situated within:External boundaries of E 15/1465Refused 13/01/2017 in respect to P 15/4799 |
Amalgamation | 499606 | Lodged:15:43 12 January 2017Amalgamating:Portion of former P 15/4977Situated within:External boundaries of E 15/1465Granted 23/06/2017 in respect to P 15/4977 |
Forfeiture | 528083 | Initiated:18/04/2018 for non-compliance with expenditure requirementsRECORDED:15:55:15 16 April 2018Notice Issued:Regulation 50 Notice sent 18/04/2018 for non-compliance with expenditure requirements pursuant to Reg 21/Sec 63A- under expended.Compliance Date:23/05/2018FINALISED:Order by Minister on 31 May 2018 that E 15/1465 be Penalty Imposed |
Fine | 531646 | Fine in respect to:Forfeiture Process 528083Fine reason:Non-compliance with expenditure obligationsPenalty amount:$1,371.00Notification date:01/06/2018Due date:06/07/2018Pursuant to:Section 96A(5)RECORDED:01 June 2018PAYMENT RECEIVED:29 June 2018FINALISED:29 June 2018Receipt Number:06-166270Amount:$1,371.00Remaining balance:$0.00 |
Surrender - Outright | 546004 | Lodged:09:31:09 15 January 2019REGISTERED:09:31:09 15 January 2019 |