Extracted from MTO on 16-May-2022 04:15,
last changed 11-Jan-2022.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 22-Sep-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 22-Sep-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-Sep-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Sep-2015 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 22-Sep-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 22-Sep-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 22-Sep-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 22-Sep-2015 | |
Type | Number | Details |
Application to Amend | 523327 | Lodged:15:26:54 09 February 2018Amending:Address (Including DTC Details)From:Principal Place of Business : AVOCA RESOURCES PTY LTD, SAME AS CORRESPONDENCE and DTC :AVOCA RESOURCES PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : AVOCA RESOURCES PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :AVOCA RESOURCES PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:15:26:54 09 February 2018 |
Application to Amend | 556389 | Lodged:13:05:38 18 June 2019Amending:Address (Including DTC Details)From:Principal Place of Business : AVOCA RESOURCES PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :AVOCA RESOURCES PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400To:Principal Place of Business : AVOCA RESOURCES PTY LTD, C/- DEBLIN TENEMENT MANAGEMENT SERVICES, PO BOX 456, MOUNT HAWTHORN, WA, 6915, xxxx@deblin.com.au, xxxxxxx190 and DTC :AVOCA RESOURCES PTY LTD, THE TENEMENT MANAGER, DEBLIN TENEMENT MANAGEMENT SERVICES, PO BOX 456, MOUNT HAWTHORN, WA, 6915, xxxx@deblin.com.au, xxxxxxx190RECORDED:13:05:38 18 June 2019 |
Mortgage | 562266 | Lodged:08:30 03 September 2019Mortgaged Shares:100/100 shares AVOCA RESOURCES PTY LTDMortgagee:CORTLAND CREDIT LENDING CORPORATIONREGISTERED:08:30 03 September 2019 |
Extension / Renewal of Term | 586398 | Lodged:08:30 17 September 2020Applied For Period:5 YearsRECORDED:08:30 17 September 2020GRANTED:10 January 2022Granted Period:5 YearsTerm Extended To:21/09/2025 |
Extension of Time | 591854 | Lodged:10:08:26 07 December 2020Type:Form 5RECORDED:10:08:26 07 December 2020WITHDRAWN:13:48 07 December 2020 |
Extension of Time | 591880 | Lodged:13:49:51 07 December 2020Type:Form 5RECORDED:13:49:51 07 December 2020APPROVED:14:41:16 07 December 2020Time extended to lodge to 7 December 2020 |