Extracted from MTO on 09-Jul-2025 00:31,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 06-May-2015 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 01-May-2025 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 06-May-2015 | 30-Apr-2025 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 06-May-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 06-May-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 06-May-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 06-May-2015 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 06-May-2015 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 01-May-2025 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 06-May-2015 | 30-Apr-2025 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 06-May-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 06-May-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 06-May-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 06-May-2015 | |
Type | Number | Details |
Application to Amend | 523327 | Lodged:15:26:54 09 February 2018Amending:Address (Including DTC Details)From:Principal Place of Business : AVOCA RESOURCES PTY LTD, SAME AS CORRESPONDENCE and DTC :AVOCA RESOURCES PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947To:Principal Place of Business : AVOCA RESOURCES PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :AVOCA RESOURCES PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400RECORDED:15:26:54 09 February 2018 |
Application to Amend | 556389 | Lodged:13:05:38 18 June 2019Amending:Address (Including DTC Details)From:Principal Place of Business : AVOCA RESOURCES PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400 and DTC :AVOCA RESOURCES PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxxxx400To:Principal Place of Business : AVOCA RESOURCES PTY LTD, C/- DEBLIN TENEMENT MANAGEMENT SERVICES, PO BOX 456, MOUNT HAWTHORN, WA, 6915, xxxx@deblin.com.au, xxxxxxx190 and DTC :AVOCA RESOURCES PTY LTD, THE TENEMENT MANAGER, DEBLIN TENEMENT MANAGEMENT SERVICES, PO BOX 456, MOUNT HAWTHORN, WA, 6915, xxxx@deblin.com.au, xxxxxxx190RECORDED:13:05:38 18 June 2019 |
Mortgage | 562266 | Lodged:08:30 03 September 2019Mortgaged Shares:100/100 shares AVOCA RESOURCES PTY LTDMortgagee:CORTLAND CREDIT LENDING CORPORATIONREGISTERED:08:30 03 September 2019DISCHARGED:09:14:55 15 July 2022Full Discharge:653492 Registered 09:14:55 15 July 2022 |
Extension / Renewal of Term | 576810 | Lodged:08:30 24 April 2020Applied For Period:5 YearsRECORDED:08:30 24 April 2020GRANTED:22 July 2020Granted Period:5 YearsTerm Extended To:05/05/2025 |
Mortgage - Discharge | 653492 | Lodged:09:14:55 15 July 2022In respect to:Mortgage 562266REGISTERED:09:14:55 15 July 2022 |
Mortgage | 653494 | Lodged:09:14:55 15 July 2022Mortgaged Shares:100/100 shares AVOCA RESOURCES PTY LTDMortgagee:MACQUARIE BANK LIMITEDREGISTERED:09:14:55 15 July 2022DISCHARGED:14:15 31 July 2024Full Discharge:711092 Registered 14:15 31 July 2024 |
Extension of Time | 654342 | Lodged:08:31:49 27 July 2022Type:Stat DecRECORDED:08:31:49 27 July 2022APPROVED:11:02:39 01 August 2022Time to lodge extended to 8 August 2022 |
Caveat | 700529 | Lodged:15:16:40 05 April 2024Caveat Type:Consent CaveatCaveator:KALI METALS LIMITEDShares Caveated:100/100 shares AVOCA RESOURCES PTY LTDRECORDED:15:16:40 05 April 2024 |
Extension of Time | 708136 | Lodged:09:32:07 01 July 2024Type:Form 5RECORDED:09:32:07 01 July 2024APPROVED:14:38:47 10 July 2024Time extended to lodge Form 5 to 26 July 2024 |
Mortgage - Discharge | 711092 | Lodged:14:15 31 July 2024In respect to:Mortgage 653494REGISTERED:14:15 31 July 2024 |
Extension / Renewal of Term | 732281 | Lodged:08:30 02 May 2025Applied For Period:2 YearsRECORDED:08:30 02 May 2025GRANTED:16 June 2025Granted Period:2 YearsTerm Extended To:05/05/2027 |