Extracted from MTO on 08-Mar-2021 03:42,
last changed 05-Nov-2020.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 18-Aug-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 18-Aug-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Aug-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Aug-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 18-Aug-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 18-Aug-2015 | |
7 | 1 | No interference with Geodetic Survey Station SSM-WIDGIEMOOLTHA 7T and SSM-WID7 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 18-Aug-2015 | |
8 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 18-Aug-2015 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 18-Aug-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 18-Aug-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Aug-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Aug-2015 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 18-Aug-2015 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 18-Aug-2015 | |
7 | 1 | No interference with Geodetic Survey Station SSM-WIDGIEMOOLTHA 7T and SSM-WID7 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 18-Aug-2015 | |
8 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 18-Aug-2015 | |
Type | Number | Details |
Caveat | 488434 | Lodged:09:49:26 15 June 2016Caveat Type:Absolute CaveatCaveator:MOUNT BELCHES PTY LTDShares Caveated:100/100 shares STRINDBERG, Brooke LouiseRECORDED:09:49:26 15 June 2016WITHDRAWN:14:37:28 05 February 2018 |
Application to Amend | 503341 | Lodged:13:22:40 27 March 2017Amending:Address (Including DTC Details)From:Principal Residence : STRINDBERG, Brooke Louise, SAME AS CORRESPONDENCE and DTC :STRINDBERG, Brooke Louise, 28 TORQUATA BOULEVARDE, HELENA VALLEY, WA, 6056To:Principal Residence : STRINDBERG, Brooke Louise, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977 and DTC :STRINDBERG, Brooke Louise, HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:13:22:40 27 March 2017 |
Withdrawal of Dealing | 522763 | Lodged:14:37:28 05 February 2018In respect to:Caveat 488434RECORDED:14:37:28 05 February 2018 |
Extension / Renewal of Term | 582226 | Lodged:13:21:28 17 July 2020Applied For Period:5 YearsRECORDED:13:21:28 17 July 2020GRANTED:26 August 2020Granted Period:5 YearsTerm Extended To:17/08/2025 |
Application to Amend | 582335 | Lodged:15:14:33 20 July 2020Amending:Address (Including DTC Details)From:Principal Place of Business : MOUNT BELCHES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BC, WA, 6849 and DTC :MOUNT BELCHES PTY LTD, TENEMENT AGENT, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BC, WA, 6849, xxxxx@hemts.com.au, xxxxx977To:Principal Place of Business : MOUNT BELCHES PTY LTD, C/- HG TITLE SERVICES PTY LTD, PO BOX Z5312 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxx@hopgoodganim.com.au, xxxxxxxxx163 and DTC :MOUNT BELCHES PTY LTD, SENIOR TENEMENT MANAGER, C/- HG TITLE SERVICES PTY LTD, PO BOX Z5312 ST GEORGES TERRACE, PERTH, WA, 6831, xxxxxxxxxxxxxx@hopgoodganim.com.au, xxxxxxxxx163RECORDED:15:14:33 20 July 2020 |
Caveat | 588991 | Lodged:10:03:38 26 October 2020Caveat Type:Consent CaveatCaveator:BLOOMIER RESOURCES PTY LTDShares Caveated:100/100 shares MOUNT BELCHES PTY LTDRECORDED:10:03:38 26 October 2020 |