Extracted from MTO on 16-Jul-2025 00:31,
last changed 02-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 18-Mar-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 18-Mar-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Mar-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Mar-2015 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 18-Mar-2015 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 18-Mar-2015 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Mar-2015 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Mar-2015 | |
Type | Number | Details |
Amalgamation | 500261 | Lodged:09:30 24 January 2017Amalgamating:Whole of former P 15/5414Situated within:External boundaries of E 15/1442Granted 27/07/2017 in respect to P 15/5414 |
Amalgamation | 500262 | Lodged:09:30 24 January 2017Amalgamating:Portion of former P 15/5426Situated within:External boundaries of E 15/1442Granted 27/07/2017 in respect to P 15/5426 |
Forfeiture | 518132 | Initiated:13/11/2017 for non-compliance with reporting requirementsRECORDED:11:40 13 November 2017Notice Issued:Regulation 50 Notice sent 13/11/2017 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:18/12/2017FINALISED:Order by Minister on 12 January 2018 that E 15/1442 be Penalty Imposed |
Fine | 521547 | Fine in respect to:Forfeiture Process 518132Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$180.00Notification date:22/01/2018Due date:26/02/2018Pursuant to:Section 96A(5)RECORDED:22 January 2018PAYMENT RECEIVED:22 January 2018FINALISED:22 January 2018Receipt Number:80574307259Amount:$180.00Remaining balance:$0.00 |
Extension / Renewal of Term | 574190 | Lodged:13:16:25 16 March 2020Applied For Period:5 YearsRECORDED:13:16:25 16 March 2020GRANTED:03 July 2020Granted Period:5 YearsTerm Extended To:17/03/2025 |
Application to Amend | 702994 | Lodged:11:49:16 03 May 2024Amending:NameFrom:MINCOR RESOURCES NLTo:WYLOO KAMBALDA PTY LTDRECORDED:11:49:16 03 May 2024 |
Application to Amend | 727218 | Lodged:14:58:46 28 February 2025Amending:Address (Including DTC Details)From:Principal Place of Business : WYLOO KAMBALDA PTY LTD, SAME AS CORRESPONDENCE and DTC :WYLOO KAMBALDA PTY LTD, PO BOX 1810, WEST PERTH, WA, 6872To:Principal Place of Business : WYLOO KAMBALDA PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :WYLOO KAMBALDA PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:14:58:46 28 February 2025 |
Extension / Renewal of Term | 728288 | Lodged:08:30 14 March 2025Applied For Period:2 YearsRECORDED:08:30 14 March 2025GRANTED:15 May 2025Granted Period:2 YearsTerm Extended To:17/03/2027 |
Referred to Native Title Date | Referral Type | Current Status | Procedure | Details | Objections | Water Comments | Determination Areas | Claims | Representative Area Bodies |
13-Feb-2017 | Tenement Amalgamation | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2017-03-082017-07-08CLEARED - Expedited Applies2017-07-2596.32 HA313643S1212925E14km SW'ly of Widgiemooltha | | | | Ngadju(WC1999/002)WC1999/002WAD6020/1998truePartially Determined | 13GoldfieldsNative Title Services Goldfields |
13-Feb-2017 | Tenement Amalgamation | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2017-03-082017-07-08CLEARED - Expedited Applies2017-07-25199.22 HA313549S1212923E14km SW'ly of Widgiemooltha | | | | Ngadju(WC1999/002)WC1999/002WAD6020/1998truePartially Determined | 13GoldfieldsNative Title Services Goldfields |
21-Oct-2014 | Tenement Application | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2014-11-052015-03-05CLEARED - Expedited Applies2015-03-173 BL31360S121300E14km SW'ly of Widgiemooltha | | | | Ngadju(WC1999/002)WC1999/002WAD6020/1998truePartially Determined | 13GoldfieldsNative Title Services Goldfields |