1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 18-Mar-2015 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 24-Jun-2024 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 18-Mar-2015 | 23-Jun-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Mar-2015 | |
4 | 2 | Unless the written approval of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 24-Jun-2024 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Mar-2015 | 23-Jun-2024 |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licence 15/255 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 18-Mar-2015 | |
6 | 1 | No excavation, excepting shafts, approaching closer to the Coolgardie Esperance Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Coolgardie Esperance Highway or Highway verge being confined to below a depth of 30 metres from the natural surface. | 18-Mar-2015 | |
7 | 1 | No interference with Geodetic Survey Station SSM-WID 23, SSM-WID 24 & SSM-WID 25 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 18-Mar-2015 | |
8 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 18-Mar-2015 | |
9 | 1 | No mining within 25 metres of either side of the Pipeline Licence 59 as shown in TENGRAPH. | 18-Mar-2015 | |
10 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by Condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP | 18-Mar-2015 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Pipeline Licence 59. | 18-Mar-2015 | |
12 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP | 18-Mar-2015 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Pipeling Licence 59 without the prior written consent of the Director Petroleum DMP. | 18-Mar-2015 | |
14 | 1 | Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP . | 18-Mar-2015 | |
15 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 59. | 18-Mar-2015 | |
16 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 59. | 18-Mar-2015 | |
17 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 24-Jun-2024 | |
18 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 24-Jun-2024 | |
19 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 24-Jun-2024 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 18-Mar-2015 | |
2 | 2 | All Exploration and prospecting disturbances, excluding supporting infrastructure, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 12 months after completion of the activity unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 24-Jun-2024 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 18-Mar-2015 | 23-Jun-2024 |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 18-Mar-2015 | |
4 | 2 | Unless the written approval of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 24-Jun-2024 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Mar-2015 | 23-Jun-2024 |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licence 15/255 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 18-Mar-2015 | |
6 | 1 | No excavation, excepting shafts, approaching closer to the Coolgardie Esperance Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Coolgardie Esperance Highway or Highway verge being confined to below a depth of 30 metres from the natural surface. | 18-Mar-2015 | |
7 | 1 | No interference with Geodetic Survey Station SSM-WID 23, SSM-WID 24 & SSM-WID 25 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 18-Mar-2015 | |
8 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 18-Mar-2015 | |
9 | 1 | No mining within 25 metres of either side of the Pipeline Licence 59 as shown in TENGRAPH. | 18-Mar-2015 | |
10 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by Condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the Director Petroleum DMP | 18-Mar-2015 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Pipeline Licence 59. | 18-Mar-2015 | |
12 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the Director Petroleum DMP | 18-Mar-2015 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Pipeling Licence 59 without the prior written consent of the Director Petroleum DMP. | 18-Mar-2015 | |
14 | 1 | Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the Director Petroleum DMP . | 18-Mar-2015 | |
15 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 59. | 18-Mar-2015 | |
16 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 59. | 18-Mar-2015 | |
17 | 1 | All supporting infrastructure for exploration and prospecting including core yards, laydowns, camps, and access tracks (excluding drill lines), being rehabilitated to the satisfaction of the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. Rehabilitation being required by the earlier of 12 months from the infrastructure being no longer required to support exploration, or 12 months from the relevant programme of work expiring, unless otherwise approved in writing by the Environmental Officer, Department of Energy, Mines, Industry Regulation and Safety. | 24-Jun-2024 | |
18 | 1 | The tenement holder must maintain appropriate records of exploration/prospecting activities, and associated rehabilitation undertaken, in order to demonstrate compliance with all conditions and environmental management and rehabilitation practice commitments. These records to be made available to the Department upon request. | 24-Jun-2024 | |
19 | 1 | All exploration and prospecting operations to comply with the environmental management and rehabilitation practice commitments provided in the approved programme of work. | 24-Jun-2024 | |
Type | Number | Details |
Application to Amend | 455034 | Lodged:09:20 22 September 2014Amending:Other/Non-title changesSub-surface rights onlyRECORDED:09:20 22 September 2014 |
Amalgamation | 471043 | Lodged:09:10 13 July 2015Amalgamating:Whole of former P 15/5553Situated within:External boundaries of E 15/1437Granted 15/12/2015 in respect to P 15/5553 |
Application to Amend | 499835 | Lodged:10:48 18 January 2017Amending:Address (Including DTC Details)From:ALLEN, Royce William, C/- RESOURCE MAPPING PTY LTD, PO BOX 541, MT HAWTHORN, WA, 6915To:ALLEN, Royce William, GREG BURKE, PO BOX 10080, KALGOORLIE, WA, 6433RECORDED:10:48 18 January 2017 |
Amalgamation | 518995 | Lodged:11:31 24 November 2017Amalgamating:Portion of P 15/5795Situated within:External boundaries of E 15/1437Granted 18/06/2018 in respect to P 15/5795 |
Amalgamation | 518996 | Lodged:11:31 24 November 2017Amalgamating:Whole of P 15/5858Situated within:External boundaries of E 15/1437Granted 18/06/2018 in respect to P 15/5858 |
Forfeiture | 556478 | Initiated:20/06/2019 for non-compliance with reporting requirements( Form 5 )RECORDED:12:01:29 19 June 2019Notice Issued:Regulation 50 Notice sent 20/06/2019 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- late lodgement of Form 5.Compliance Date:25/07/2019FINALISED:Order by Minister on 29 July 2019 that E 15/1437 be Penalty Imposed |
Fine | 559221 | Fine in respect to:Forfeiture Process 556478Fine reason:Non-compliance with expenditure obligationsPenalty amount:$60.00Notification date:29/07/2019Due date:02/09/2019Pursuant to:Section 96A(5)RECORDED:29 July 2019PAYMENT RECEIVED:02 August 2019FINALISED:02 August 2019Receipt Number:01-034775Amount:$60.00Remaining balance:$0.00 |
Extension / Renewal of Term | 574184 | Lodged:11:53:40 16 March 2020Applied For Period:5 YearsRECORDED:11:53:40 16 March 2020GRANTED:11 May 2020Granted Period:5 YearsTerm Extended To:17/03/2025 |
Application to Amend | 595625 | Lodged:08:30 11 February 2021Amending:Address (Including DTC Details)From:ALLEN, Vera Olive, 25 CHARLES STREET, KALGOORLIE, WA, 6430To:ALLEN, Vera Olive, C/- ENTERPRISE, PO BOX 5010 (CENTREPOINT), MIDLAND, WA, 6056, xxxxxxx@datumpeg.com.au, xxxxxxx769RECORDED:08:30 11 February 2021 |
Application to Amend | 671270 | Lodged:08:30 20 March 2023Amending:Address (Including DTC Details)From:ALLEN, Vera Olive, C/- ENTERPRISE, PO BOX 5010 (CENTREPOINT), MIDLAND, WA, 6056, xxxxxxx@datumpeg.com.au, xxxxxxx769To:ALLEN, Vera Olive, C/- ENTP, PO BOX 1112, KALAMUNDA, WA, 6926, xxxxxxx@datumpeg.com.au, xxxxxxxxx769REJECTED:08:30 20 March 2023 |
Application to Amend | 671301 | Lodged:09:05:38 20 March 2023Amending:Address (Including DTC Details)From:ALLEN, Vera Olive, C/- ENTERPRISE, PO BOX 5010 (CENTREPOINT), MIDLAND, WA, 6056, xxxxxxx@datumpeg.com.au, xxxxxxx769To:ALLEN, Vera Olive, C/- ENTP, PO BOX 1112, KALAMUNDA, WA, 6926, xxxxxxx@datumpeg.com.au, xxxxxxxxx769RECORDED:09:05:38 20 March 2023 |
Caveat | 712998 | Lodged:13:11:13 22 August 2024Caveat Type:Consent CaveatCaveator:ALLEN, Ronald William
ALLEN, Peter Thomas
ALLEN, Jeffery Gordon
ALLEN, Belinda Kaye
BUSWELL, Melissa Lee
ALLEN, Gordon JamesShares Caveated:100/100 shares ENTERPRISE METALS LIMITEDRECORDED:13:11:13 22 August 2024 |
Extension / Renewal of Term | 728449 | Lodged:16:09:10 14 March 2025Applied For Period:2 YearsRECORDED:16:09:10 14 March 2025GRANTED:09 April 2025Granted Period:2 YearsTerm Extended To:17/03/2027 |