1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 12-Nov-2014 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 12-Nov-2014 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 12-Nov-2014 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Nov-2014 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 12-Nov-2014 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 12-Nov-2014 | |
7 | 1 | The rights of ingress to and egress from Miscellaneous Licence 15/80 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 12-Nov-2014 | |
8 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 12-Nov-2014 | |
9 | 1 | In respect of the area covered by this licence if the Ngadju (being the applicants in Federal Court Application No/s. WAD6020/1998 (WC1999/002) send a request by pre-paid post to the licensee's or agent's address, not more than ninety days after the grant of this licence, the licensee shall within thirty days of the request execute in favour of Ngadju the Regional Standard Heritage Agreement (RSHA) endorsed by peak industry groups and the Goldfields Land and Sea Council. | 12-Nov-2014 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 12-Nov-2014 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 12-Nov-2014 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 12-Nov-2014 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Nov-2014 | |
5 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 12-Nov-2014 | |
6 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 12-Nov-2014 | |
7 | 1 | The rights of ingress to and egress from Miscellaneous Licence 15/80 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 12-Nov-2014 | |
8 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 12-Nov-2014 | |
9 | 1 | In respect of the area covered by this licence if the Ngadju (being the applicants in Federal Court Application No/s. WAD6020/1998 (WC1999/002) send a request by pre-paid post to the licensee's or agent's address, not more than ninety days after the grant of this licence, the licensee shall within thirty days of the request execute in favour of Ngadju the Regional Standard Heritage Agreement (RSHA) endorsed by peak industry groups and the Goldfields Land and Sea Council. | 12-Nov-2014 | |
Type | Number | Details |
Forfeiture | 480320 | Initiated:19/01/2016 for non-compliance with rent requirementsRECORDED:11:24:17 18 January 2016Notice Issued:Regulation 50 Notice sent 19/01/2016 for non-compliance with rent requirements pursuant to Reg 109/Sec 63A- non payment of rent.Compliance Date:23/02/2016FINALISED:Order by Minister on 26 February 2016 that E 15/1391 be Penalty Imposed |
Fine | 482321 | Fine in respect to:Forfeiture Process 480320Fine reason:Non-compliance with rent obligationsPenalty amount:$213.00Notification date:01/03/2016Due date:14/04/2016Pursuant to:Section 96A(5)RECORDED:26 February 2016PAYMENT RECEIVED:12 April 2016Receipt Number:06-153182Amount:$213.00Remaining balance:$0.00FINALISED:12 April 2016 |
Caveat | 486516 | Lodged:09:48:47 11 May 2016Caveat Type:Absolute CaveatCaveator:SHIRE OF COOLGARDIEShares Caveated:96/96 shares ABEH PTY LTDRECORDED:09:48:47 11 May 2016WITHDRAWN:15:55:53 10 April 2017 |
Forfeiture | 501590 | Initiated:27/02/2017 for non-compliance with reporting requirements( Form 5 )RECORDED:14:01:16 23 February 2017Notice Issued:Regulation 50 Notice sent 27/02/2017 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- late lodgement of Form 5.Compliance Date:03/04/2017FINALISED:Order by Minister on 07 April 2017 that E 15/1391 be Penalty Imposed |
Fine | 504114 | Fine in respect to:Forfeiture Process 501590Fine reason:Non-compliance with expenditure obligationsPenalty amount:$90.00Notification date:28/04/2017Due date:02/06/2017Pursuant to:Section 96A(5)RECORDED:07 April 2017PAYMENT RECEIVED:05 May 2017FINALISED:05 May 2017Receipt Number:01-030036Amount:$90.00Remaining balance:$0.00 |
Withdrawal of Dealing | 504276 | Lodged:15:55:53 10 April 2017In respect to:Caveat 486516RECORDED:15:55:53 10 April 2017 |
Extension / Renewal of Term | 566420 | Lodged:15:50 11 November 2019Applied For Period:5 YearsRECORDED:15:50 11 November 2019GRANTED:30 March 2020Granted Period:5 YearsTerm Extended To:11/11/2024 |
Excess Tonnage | 583050 | Lodged:08:40 30 July 2020RECORDED:08:40 30 July 2020GRANTED:08:30 06 August 2020An additional 8,000 tonnes |
Forfeiture | 676358 | Initiated:25/05/2023 for non-compliance with reporting requirementsRECORDED:13:53:05 18 May 2023FINALISED:Order by Minister on 24 August 2023 that E 15/1391 be Penalty ImposedNotice Issued:Regulation 50 Notice sent 25/05/2023 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:29/06/2023 |
Fine | 684671 | Fine in respect to:Forfeiture Process 676358Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$500.00Notification date:28/08/2023Due date:02/10/2023Pursuant to:Section 96A(5)RECORDED:28 August 2023PAYMENT RECEIVED:14 September 2023FINALISED:14 September 2023Receipt Number:10408680Amount:$500.00Remaining balance:$0.00 |
Application to Amend | 698053 | Lodged:12:47:08 06 March 2024Amending:Address (Including DTC Details)From:Principal Place of Business : ABEH PTY LTD, ADDRESS NOT PROVIDED and DTC :ABEH PTY LTD, 20 WANN COURT, UPPER SWAN, WA, 6069To:Principal Place of Business : ABEH PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :ABEH PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:12:47:08 06 March 2024 |
Application to Amend | 714604 | Lodged:16:21:54 12 September 2024Amending:Address (Including DTC Details)From:Principal Place of Business : ABEH PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :ABEH PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997To:Principal Place of Business : ABEH PTY LTD, C/- AURORA TENEMENT CONSULTING PTY LTD, PO BOX 1907, WEST PERTH, WEST PERTH, WA, 6872, xxxxxx@auroratenements.com, xxxxxxx800 and DTC :ABEH PTY LTD, AURORA TENEMENT CONSULTING PTY LTD, C/- AURORA TENEMENT CONSULTING PTY LTD, PO BOX 1907, WEST PERTH, WEST PERTH, WA, 6872, xxxxxx@auroratenements.com, xxxxxxx800RECORDED:16:21:54 12 September 2024 |
Extension / Renewal of Term | 719244 | Lodged:09:53:51 11 November 2024Applied For Period:2 YearsRECORDED:09:53:51 11 November 2024GRANTED:22 January 2025Granted Period:2 YearsTerm Extended To:11/11/2026 |