Tenement: E15-1384

View on Landtracker Maps (logon required)

Extracted from MTO on 07-Jul-2025 00:18, last changed 26-Jun-2025.

Tenement Summary

Identifier:E 15/1384Type:Exploration Licence
Status:LiveDistrict:COOLGARDIE
Lodged:ONLINEArea:9 BL
Purposes:Term:5 Years (Extended)
Markout:Received:24-Apr-2013 11:43
Commence:23-Jan-2014 Expiry:22-Jan-2026

Holders

Company NameSharesTotal Shares
EVOLUTION MINING (MUNGARI) PTY LTD100100

Applicants on Receival

Company NameSharesTotal Shares
LA MANCHA RESOURCES AUSTRALIA PTY LTD100100

Relationships

Relationship TypeDealingDealing StatusTenementTenement Status
Amalgamation (Same Holder)Amalgamation 474553GrantedP 15/4985Dead
Amalgamation (Same Holder)Amalgamation 474553GrantedP 15/4991Dead
Amalgamation (Same Holder)Amalgamation 474553GrantedP 15/4992Dead
Amalgamation (Same Holder)Amalgamation 474553GrantedP 15/4993Dead
Amalgamation (Same Holder)Amalgamation 474553GrantedP 15/4824Dead
Amalgamation (Same Holder)Amalgamation 474553GrantedP 15/4825Dead
Amalgamation (Same Holder)Amalgamation 474553GrantedP 15/4827Dead
Amalgamation (Same Holder)Amalgamation 474553GrantedP 15/4986Dead
Amalgamation (Same Holder)Amalgamation 474553GrantedP 15/4988Dead
Amalgamation (Same Holder)Amalgamation 474553GrantedP 15/4989Dead
Amalgamation (Same Holder)Amalgamation 474553GrantedP 15/4990Dead
Amalgamation (Same Holder)Amalgamation 474553GrantedP 15/5008Dead
Amalgamation (Same Holder)Amalgamation 474553GrantedP 15/5009Dead
Amalgamation (Same Holder)Amalgamation 474553GrantedP 15/5011Dead
Amalgamation (Same Holder)Amalgamation 474553GrantedP 15/5012Dead
Amalgamation (Same Holder)Amalgamation 474553GrantedP 15/5013Dead
Amalgamation (Different holder)Amalgamation 477750GrantedP 15/5757Dead
Amalgamation (Different holder)Amalgamation 482050GrantedP 15/4944Dead
Amalgamation (Different holder)Amalgamation 482050GrantedP 15/4940Dead
Amalgamation (Different holder)Amalgamation 482050GrantedP 15/4939Dead
Amalgamation (Different holder)Amalgamation 482050GrantedP 15/4938Dead

Shires

Shire NameShire NumberStartArea
COOLGARDIE SHIRE196024-Apr-2013 9.00000 BL

Conditions

#VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.23-Jan-2014
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.23-Jan-2014
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.23-Jan-2014
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.23-Jan-2014
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.23-Jan-2014
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
23-Jan-2014
71No excavation, excepting shafts, approaching closer to the Great Eastern Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Eastern Highway or Highway verge being confined to below a depth of 30 metres from the natural surface.23-Jan-2014
82The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Landscape Protection (H23704) 45560,  NHL/106007Goldfield Water Supply Scheme, FNA 12253and FNA 4787 (Buffer Zone for Mungari Industrial Park) .11-Mar-2016
81The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Landscape Protection (H23704) 45560 and FNA 4787 (Buffer Zone for Mungari Industrial Park) .23-Jan-2014 10-Mar-2016
91The rights of ingress to and egress from Miscellaneous Licence 15/296 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.23-Jan-2014
101No interference with Geodetic Survey Station SSM- KALGOORLIE 65A and SSM-KALGOORLIE 64 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.23-Jan-2014
111No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof.23-Jan-2014
121Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof.23-Jan-2014

Endorsements

Cond #VerTextStartEnd
11All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion.23-Jan-2014
21All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP.23-Jan-2014
31All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program.23-Jan-2014
41Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations.23-Jan-2014
51The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment.23-Jan-2014
61The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-
  • the grant of the Licence; or
  • registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer.
23-Jan-2014
71No excavation, excepting shafts, approaching closer to the Great Eastern Highway, Highway verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Great Eastern Highway or Highway verge being confined to below a depth of 30 metres from the natural surface.23-Jan-2014
82The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Landscape Protection (H23704) 45560,  NHL/106007Goldfield Water Supply Scheme, FNA 12253and FNA 4787 (Buffer Zone for Mungari Industrial Park) .11-Mar-2016
81The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Landscape Protection (H23704) 45560 and FNA 4787 (Buffer Zone for Mungari Industrial Park) .23-Jan-2014 10-Mar-2016
91The rights of ingress to and egress from Miscellaneous Licence 15/296 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence.23-Jan-2014
101No interference with Geodetic Survey Station SSM- KALGOORLIE 65A and SSM-KALGOORLIE 64 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface.23-Jan-2014
111No interference with the transmission line or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof.23-Jan-2014
121Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof.23-Jan-2014

Dealings

TypeNumberDetails
Application to Amend423354Lodged:09:55 16 May 2013Amending:Other/Non-title changesIn respect to private land, the tenement applicant is seeking subsurface rights only, therefore section 33(1a) of the Mining Act 1978 applies to private land notices.RECORDED:09:55 16 May 2013
Application to Amend433139Lodged:14:10 11 October 2013Amending:AddressFrom:LA MANCHA RESOURCES AUSTRALIA PTY LTD, CENTRAL TENEMENT SERVICES, PO BOX 722, WEST PERTH, WA, 6872To:LA MANCHA RESOURCES AUSTRALIA PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931RECORDED:14:10 11 October 2013
Amalgamation474553Lodged:15:30 17 September 2015Amalgamating: Whole of P15/4985, P15/4991, P15/4992 & P15/4993 and portion of P15/4824, P15/4825, P15/4827, P15/4986, P15/4988, P15/4989, P15/4990, P15/5008, P15/5009, P15/5011, P15/5012 & P15/5013 Situated with: External boundaries of E15/1384 GRANTED 8th March 2016
Application to Amend475435Lodged:15:45 05 October 2015Amending:NameFrom:LA MANCHA RESOURCES AUSTRALIA PTY LTDTo:EVOLUTION MINING (MUNGARI) PTY LTDRECORDED:15:45 05 October 2015
Amalgamation477750Lodged:15:35 23 November 2015Amalgamating:Portion of former P 15/5757Situated within:External boundaries of E 15/1384Granted 31/05/2016 in respect to P 15/5757
Amalgamation482050Lodged:15:20 22 February 2016Amalgamating: Portion of former P15/4938, P15/4939; P15/4940 and P15/4944 Situated within: External Boundaries on E15/1384Granted 25 November 2016 in respect to P15/4938, P15/4939, P15/4940 and P15/4944
Application to Amend533080Lodged:15:00 18 June 2018Amending:Address (Including DTC Details)From:Principal Place of Business : EVOLUTION MINING (MUNGARI) PTY LTD, SAME AS CORRESPONDENCE and DTC :EVOLUTION MINING (MUNGARI) PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931To:Principal Place of Business : EVOLUTION MINING (MUNGARI) PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :EVOLUTION MINING (MUNGARI) PTY LTD, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 592, MAYLANDS, WA, 6931, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:15:00 18 June 2018
Extension / Renewal of Term546376Lodged:12:01:34 22 January 2019Applied For Period:5 YearsRECORDED:12:01:34 22 January 2019GRANTED:08 May 2019Granted Period:5 YearsTerm Extended To:22/01/2024
Application to Amend558242Lodged:15:10 10 July 2019Including email and telephone details in DTCRECORDED:15:10 10 July 2019
Extension / Renewal of Term694514Lodged:08:38:18 22 January 2024Applied For Period:2 YearsRECORDED:08:38:18 22 January 2024GRANTED:12 March 2024Granted Period:2 YearsTerm Extended To:22/01/2026

Payments

TypeYearReceipt DateReceipt No.MR LodgedAmountRental AreaEffective DateAmt DueDiscrepancy
Rental202617-Dec-2024 10724071$7,056.009 BL23-Jan-2014 $7,056.00$0.00
Rental202519-Dec-2023 10469821$6,723.009 BL23-Jan-2014 $6,723.00$0.00
Rental202408-Dec-2022 10309163$6,399.009 BL23-Jan-2014 $6,399.00$0.00
Rental202308-Dec-2021 10234449$6,093.009 BL23-Jan-2014 $6,093.00$0.00
Rental202208-Dec-2020 10174986$5,535.009 BL23-Jan-2014 $5,535.00$0.00
Rental202123-Dec-2019 10127627$2,862.009 BL23-Jan-2014 $2,862.00$0.00
Rental202022-Jan-2019 90571528142$2,700.009 BL23-Jan-2014 $2,700.00$0.00
Rental201921-Dec-2017 9639470492$1,872.009 BL23-Jan-2014 $1,872.00$0.00
Rental201825-Jan-2017 70659984486$1,813.059 BL23-Jan-2014 $1,813.05$0.00
Rental201714-Jan-2016 06-151220PERTH$1,127.259 BL23-Jan-2014 $1,127.25$0.00
Rental201609-Jan-2015 MT-210010225471-EF$1,098.909 BL23-Jan-2014 $1,098.90$0.00
Rental201524-Apr-2013 311413024773$1,050.309 BL23-Jan-2014 $1,050.30$0.00

Expenditure

YearForm 5 TypeMin ExpdExp Lodged DateTotal ExpdExemp NoExemp LodgedExemp AmtExemp StatusOutcome DateExploration ActivitiesMining ActivitiesAboriginal SurveyRentAdministrationProspectingStrike Through
2026$70,000.00false
2025$70,000.0021-Feb-2025 $48,093.0072660321-Feb-2025 $70,000.00Granted08-Apr-2025 $26,513.00$0.00$0.00$7,580.00$14,000.00$0.00false
2024$70,000.0007-Mar-2024 $132,284.00$103,039.00$0.00$0.00$7,198.00$22,047.00$0.00false
2023$70,000.0002-Mar-2023 $6,842.0067016702-Mar-2023 $70,000.00Granted11-Apr-2023 $0.00$0.00$0.00$6,842.00$0.00$0.00false
2022$70,000.0001-Mar-2022 $67,543.0064240001-Mar-2022 $70,000.00Granted16-Jun-2022 $47,306.00$0.00$0.00$6,237.00$14,000.00$0.00false
2021$50,000.0025-Feb-2021 $43,971.0061684002-Mar-2021 $50,000.00Granted24-May-2021 $30,472.00$0.00$0.00$3,537.00$9,962.00$0.00false
2020$50,000.0019-Mar-2020 $52,372.00$38,997.00$0.00$0.00$3,375.00$10,000.00$0.00false
2019$30,000.0020-Feb-2019 $45,059.00$35,433.00$0.00$0.00$2,539.00$7,087.00$0.00false
2018$30,000.0026-Feb-2018 $22,560.0052468201-Mar-2018 $30,000.00Granted16-Apr-2018 $14,101.00$0.00$0.00$2,459.00$6,000.00$0.00false
2017$20,000.0013-Feb-2017 $33,167.24$25,611.00$0.00$0.00$2,434.24$5,122.00$0.00false
2016$20,000.0017-Feb-2016 $23,190.00$17,526.00$0.00$0.00$1,664.00$4,000.00$0.00false
2015$20,000.0018-Mar-2015 $40,954.00$32,660.00$0.00$0.00$1,762.00$6,532.00$0.00false

Native Title Referrals

Referred to Native Title DateReferral TypeCurrent StatusProcedureDetailsObjectionsWater CommentsDetermination AreasClaimsRepresentative Area Bodies
15-Jun-2016 Tenement AmalgamationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2016-06-292016-10-29CLEARED - Expedited Applies2016-11-1558.36 HA305413S121152E12km NE'ly of Coolgardie13GoldfieldsNative Title Services Goldfields
15-Dec-2015 Tenement AmalgamationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2016-01-132016-05-13CLEARED - Expedited Applies2016-05-276.86 HA305458S1211614E12km NE'ly of Coolgardie13GoldfieldsNative Title Services Goldfields
23-Sep-2015 Tenement AmalgamationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2015-10-212016-02-21CLEARED - Expedited Applies2016-03-081,792.64 HA305341S1211630E12km NE'ly of Coolgardie13GoldfieldsNative Title Services Goldfields
08-Aug-2013 Tenement ApplicationExpedited Procedure : Native Title Cleared - Expedited AppliesExpedited Procedure2013-08-282013-12-28CLEARED - Expedited Applies2014-01-149 BL30540S1211630E12km NE'ly of Coolgardie13GoldfieldsNative Title Services Goldfields