Extracted from MTO on 15-Jul-2025 01:31,
last changed 18-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 04-Feb-2014 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 04-Feb-2014 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 04-Feb-2014 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 04-Feb-2014 | |
5 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Conservation of Flora and Fauna Reserve 33300, and Water Supply Reserve 33752. | 04-Feb-2014 | |
6 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 04-Feb-2014 | |
7 | 1 | No mining within 25 metres of either side of the Goldfields Pipeline Licence 59 as shown in TENGRAPH.
| 04-Feb-2014 | |
8 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP | 04-Feb-2014 | |
9 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Pipeline Licence 59. | 04-Feb-2014 | |
10 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP | 04-Feb-2014 | |
11 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 59 without the prior written consent of the State Mining Engineer DMP. | 04-Feb-2014 | |
12 | 1 | Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP . | 04-Feb-2014 | |
13 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 59.
| 04-Feb-2014 | |
14 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 59. | 04-Feb-2014 | |
15 | 1 | The rights of ingress to and egress from Miscellaneous Licences 15/61, 15/214 and 15/276 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licences. | 04-Feb-2014 | |
16 | 1 | No excavation, excepting shafts, approaching closer to the Goldfields Highway Highway, verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Goldfields Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 04-Feb-2014 | |
17 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 04-Feb-2014 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 04-Feb-2014 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 04-Feb-2014 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 04-Feb-2014 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 04-Feb-2014 | |
5 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Conservation of Flora and Fauna Reserve 33300, and Water Supply Reserve 33752. | 04-Feb-2014 | |
6 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 04-Feb-2014 | |
7 | 1 | No mining within 25 metres of either side of the Goldfields Pipeline Licence 59 as shown in TENGRAPH.
| 04-Feb-2014 | |
8 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by condition 9 hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer DMP | 04-Feb-2014 | |
9 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition 9 hereof without the prior approval of the operators of the Pipeline Licence 59. | 04-Feb-2014 | |
10 | 1 | The Licensee shall not excavate, drill, install, erect, deposit or permit to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition 9 hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer DMP | 04-Feb-2014 | |
11 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the Pipeline Licence 59 without the prior written consent of the State Mining Engineer DMP. | 04-Feb-2014 | |
12 | 1 | Mining on the Safety Zone established in Condition 9 hereof being confined to below a depth of 50 metres from the natural surface unless otherwise approved by the State Mining Engineer DMP . | 04-Feb-2014 | |
13 | 1 | The rights of ingress to and egress from the pipeline easement established in Condition 9 hereof being at all times preserved for employees, contractors and agents of the operators of the Pipeline Licence 59.
| 04-Feb-2014 | |
14 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the Pipeline Licence 59. | 04-Feb-2014 | |
15 | 1 | The rights of ingress to and egress from Miscellaneous Licences 15/61, 15/214 and 15/276 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licences. | 04-Feb-2014 | |
16 | 1 | No excavation, excepting shafts, approaching closer to the Goldfields Highway Highway, verge or the road reserve than a distance equal to twice the depth of the excavation and mining on the Goldfields Highway or Highway verge being confined to below a depth of 30 metres from the natural surface, and on any other road or road verge, to below a depth of 15 metres from the natural surface. | 04-Feb-2014 | |
17 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 04-Feb-2014 | |
Type | Number | Details |
Amalgamation | 517555 | Lodged:15:05 01 November 2017Amalgamating:Portion of former P 15/4970Situated within:External boundaries of E 15/1354Granted 30/04/2018 in respect to P 15/4970 |
Extension / Renewal of Term | 547010 | Lodged:16:00 01 February 2019Applied For Period:5 YearsRECORDED:16:00 01 February 2019GRANTED:17 April 2019Granted Period:5 YearsTerm Extended To:03/02/2024 |
Forfeiture | 676902 | Initiated:31/05/2023 for non-compliance with reporting requirements( Form 5 )RECORDED:13:11:51 25 May 2023FINALISED:Order by Minister on 19 July 2023 that E 15/1354 be Penalty ImposedNotice Issued:Regulation 50 Notice sent 31/05/2023 for non-compliance with expenditure requirements pursuant to Reg 22/Sec 63A- late lodgement of Form 5.Compliance Date:05/07/2023 |
Fine | 681645 | Fine in respect to:Forfeiture Process 676902Fine reason:Non-compliance with expenditure obligationsPenalty amount:$80.00Notification date:26/07/2023Due date:30/08/2023Pursuant to:Section 96A(5)RECORDED:20 July 2023PAYMENT RECEIVED:04 August 2023FINALISED:04 August 2023Receipt Number:10392252Amount:$80.00Remaining balance:$0.00 |
Extension / Renewal of Term | 695648 | Lodged:11:54:22 02 February 2024Applied For Period:2 YearsRECORDED:11:54:22 02 February 2024GRANTED:12 April 2024Granted Period:2 YearsTerm Extended To:03/02/2026 |
Application to Amend | 698052 | Lodged:12:47:08 06 March 2024Amending:Address (Including DTC Details)From:Principal Residence : STRINDBERG, Maxwell Peter, SAME AS CORRESPONDENCE and DTC :STRINDBERG, Maxwell Peter, 20 WANN COURT, UPPER SWAN, WA, 6069To:Principal Residence : STRINDBERG, Maxwell Peter, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :STRINDBERG, Maxwell Peter, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997RECORDED:12:47:08 06 March 2024 |
Application to Amend | 714606 | Lodged:16:29:30 12 September 2024Amending:Address (Including DTC Details)From:Principal Residence : STRINDBERG, Maxwell Peter, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997 and DTC :STRINDBERG, Maxwell Peter, MCMAHON MINING TITLE SERVICES PTY LTD, C/- MCMAHON MINING TITLE SERVICES PTY LTD, PO BOX 6301, EAST PERTH, WA, 6892, xxxx@mmts.net.au, xxxxxxxxxxx997To:Principal Residence : STRINDBERG, Maxwell Peter, C/- AURORA TENEMENT CONSULTING PTY LTD, PO BOX 1907, WEST PERTH, WEST PERTH, WA, 6872, xxxxxx@auroratenements.com, xxxxxxx800 and DTC :STRINDBERG, Maxwell Peter, AURORA TENEMENT CONSULTING PTY LTD, C/- AURORA TENEMENT CONSULTING PTY LTD, PO BOX 1907, WEST PERTH, WEST PERTH, WA, 6872, xxxxxx@auroratenements.com, xxxxxxx800RECORDED:16:29:30 12 September 2024 |