Extracted from MTO on 08-Jul-2025 00:59,
last changed 04-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 09-Apr-2013 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 09-Apr-2013 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-Apr-2013 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-Apr-2013 | |
5 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Access Reserve 44102. | 09-Apr-2013 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 09-Apr-2013 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 09-Apr-2013 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-Apr-2013 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-Apr-2013 | |
5 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Access Reserve 44102. | 09-Apr-2013 | |
Type | Number | Details |
Application to Amend | 404842 | Lodged:14:20 29 August 2012Amending Mineral Field - From: Jaurdz To: CoolgardieRECORDED:14:20 29 August 2012 |
Extension / Renewal of Term | 527322 | Lodged:15:32:50 06 April 2018Applied For Period:5 YearsRECORDED:15:32:50 06 April 2018GRANTED:07 August 2018Granted Period:5 YearsTerm Extended To:08/04/2023 |
Partial Surrender - Compulsory | 551274 | Lodged:13:16:58 09 April 2019Section:Section 65 (3)Surrendered Blocks:KALGOORLIE 2595 n, o
KALGOORLIE 2668 d, e, j, kSurrendered Total:6 BL.REGISTERED:Midnight 08 April 2019Surrendered area to be released 08:30:00 06/05/2019 under Section 65 (3)Surrendered area released 08:30:00 06/05/2019 under Section 65 (3) |
Application to Amend | 595037 | Lodged:09:27:20 29 January 2021Amending:Address (Including DTC Details)From:MLG OZ PTY LTD, C/- GETS, PO BOX 10939, KALGOORLIE PO, WA, 6433To:MLG OZ PTY LTD, C/- GETS, PO BOX 10939, KALGOORLIE PO, WA, 6433, xxxx@getmining.com.au, xxxxxxx525REJECTED:09:27:20 29 January 2021 |
Application to Amend | 617034 | Lodged:09:43:46 04 March 2021Amending:NameFrom:MLG OZ PTY LTDTo:MLG OZ LIMITEDRECORDED:09:43:46 04 March 2021 |
Application to Amend | 650710 | Lodged:14:27:51 01 June 2022Amending:Address (Including DTC Details)From:MLG OZ LIMITED, C/- GETS, PO BOX 10939, KALGOORLIE PO, WA, 6433To:MLG OZ LIMITED, C/- GETS, PO BOX 10939, KALGOORLIE PO, WA, 6433, xxxx@getmining.com.au, xxxxxxxxx525RECORDED:14:27:51 01 June 2022 |
Extension / Renewal of Term | 672634 | Lodged:13:54:32 05 April 2023Applied For Period:2 YearsRECORDED:13:54:32 05 April 2023GRANTED:07 August 2023Granted Period:2 YearsTerm Extended To:08/04/2025 |
Application to Amend | 676747 | Lodged:12:07:58 24 May 2023Amending:Address (Including DTC Details)From:Principal Place of Business : MLG OZ LIMITED, ADDRESS NOT PROVIDED and DTC :MLG OZ LIMITED, GLOBAL EXPLORATION TENEMENT SERVICES, C/- GETS, PO BOX 7070, CLOISTERS SQUARE PO, WA, 6850, xxxx@getmining.com.au, xxxxxxxxx600To:Principal Place of Business : MLG OZ LIMITED, C/- ACQUIRE, PO BOX 7070, CLOISTERS SQUARE PO, WA, 6850 and DTC :MLG OZ LIMITED, ACQUIRE TECHNOLOGY SOLUTIONS PTY LTD, C/- ACQUIRE, PO BOX 7070, CLOISTERS SQUARE PO, WA, 6850, xxxxxxxxx@acquire.com.au, xxxxxxx600RECORDED:12:07:58 24 May 2023 |
Application to Amend | 676754 | Lodged:12:07:58 24 May 2023Amending:ACNFrom:MLG OZ LIMITED ACN:To:MLG OZ LIMITED ACN:102642366RECORDED:12:07:58 24 May 2023 |
Application to Amend | 676755 | Lodged:12:07:58 24 May 2023Amending:Address (Including DTC Details)From:MLG OZ LIMITED, ADDRESS NOT PROVIDEDTo:MLG OZ LIMITED, C/- ACQUIRE, PO BOX 7070, CLOISTERS SQUARE PO, WA, 6850RECORDED:12:07:58 24 May 2023 |
Extension / Renewal of Term | 730451 | Lodged:14:36:47 08 April 2025Applied For Period:2 YearsRECORDED:14:36:47 08 April 2025 |