1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 31-Jul-2012 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 31-Jul-2012 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 31-Jul-2012 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 31-Jul-2012 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 31-Jul-2012 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 31-Jul-2012 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 31-Jul-2012 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 31-Jul-2012 | |
Type | Number | Details |
Application to Amend | 460371 | Lodged:10:43 15 January 2015Amending:AddressFrom:Residential : HARRIS, Linnie, 133 SPENCER ST, BUNBURY, WA, 6230 and Correspondence :HARRIS, Linnie, PO BOX 6321, BUNBURY, WA, 6230To:Residential : HARRIS, Linnie, ADDRESS NOT PROVIDED and Correspondence :HARRIS, Linnie, PO BOX 40, COOLGARDIE, WA, 6429RECORDED:10:43 15 January 2015 |
Application to Amend | 489828 | Lodged:11:52 04 July 2016Amending:Address (Including DTC Details)From:HARRIS, Linnie, PO BOX 40, COOLGARDIE, WA, 6429To:HARRIS, Linnie, LINNIE HARRIS, 76 WALYUNGA BLV, CLARKSON, WA, 6030RECORDED:11:52 04 July 2016 |
Extension of Time | 490870 | Lodged:11:45 13 July 2016Type:RentRECORDED:11:45 13 July 2016REFUSED:12:49:24 20 July 2016 |
Extension of Time | 491474 | Lodged:15:10 28 July 2016Type:RentRECORDED:15:10 28 July 2016extension of time until 30 October 2016 to pay annual rentAPPROVED:13:36:41 05 August 2016 |
Extension / Renewal of Term | 505489 | Lodged:11:15 01 May 2017Applied For Period:5 YearsRECORDED:11:15 01 May 2017GRANTED:09 June 2017Granted Period:5 YearsTerm Extended To:30/07/2022 |
Partial Surrender - Compulsory | 536023 | Lodged:10:45 27 July 2018Section:Section 65 (3)Surrendered Blocks:KALGOORLIE 2896 q, t, w, x
KALGOORLIE 2968 a, b
KALGOORLIE 2969 b, cSurrendered Total:8 BL.REGISTERED:Midnight 30 July 2018Surrendered area to be released 08:30:00 24/08/2018 under Section 65 (3)Surrendered area released 08:30:00 24/08/2018 under Section 65 (3) |
Extension of Time | 554185 | Lodged:13:57 20 May 2019Type:RentRECORDED:13:57 20 May 2019REFUSED:09:25 12 June 2019 |
Application to Amend | 557882 | Lodged:08:30 03 July 2019Amending:Address (Including DTC Details)From:Principal Residence : HARRIS, Linnie, ADDRESS NOT PROVIDED and DTC :HARRIS, Linnie, LINNIE HARRIS, 76 WALYUNGA BLV, CLARKSON, WA, 6030To:Principal Residence : HARRIS, Linnie, UNIT 16, NO. 17-19 CHRISTMAS AV., ORELIA, WA, 6167 and DTC :HARRIS, Linnie, LINNIE HARRIS, UNIT 16, NO. 17-19 CHRISTMAS AV., ORELIA, WA, 6167RECORDED:08:30 03 July 2019 |
Extension of Time | 579205 | Lodged:11:18 28 May 2020Type:RentRECORDED:11:18 28 May 2020REFUSED:12:59 09 June 2020 |
Extension / Renewal of Term | 650786 | Lodged:09:00 02 June 2022Applied For Period:2 YearsRECORDED:09:00 02 June 2022GRANTED:14 September 2022Granted Period:2 YearsTerm Extended To:30/07/2024 |
Extension of Time | 652696 | Lodged:09:53 04 July 2022Type:RentRECORDED:09:53 04 July 2022REFUSED:08:10:27 04 August 2022 |
Extension of Time | 655212 | Lodged:12:33 05 August 2022Type:RentRECORDED:12:33 05 August 2022REFUSED:14:46 12 August 2022 |
Extension / Renewal of Term | 710766 | Lodged:15:58:35 29 July 2024Applied For Period:2 YearsRECORDED:15:58:35 29 July 2024 |