Extracted from MTO on 23-May-2022 03:43,
last changed 26-Aug-2021.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 24-May-2010 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 24-May-2010 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 24-May-2010 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 24-May-2010 | |
5 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Timber Reserve 19621. | 24-May-2010 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 24-May-2010 | |
2 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines and Petroleum (DMP). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DMP. | 24-May-2010 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 24-May-2010 | |
4 | 1 | Unless the written approval of the Environmental Officer, DMP is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 24-May-2010 | |
5 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Timber Reserve 19621. | 24-May-2010 | |
Type | Number | Details |
Conversion | 380388 | New Tenement:M 15/1803Application Date:16:00 21 Jul 2011Section:S67Discontinued due to M 15/1803 Withdrawn 16:15 19 October 2011 |
Conversion | 386731 | New Tenement:M 15/1805Application Date:16:05 01 Nov 2011Section:S67Converted 00:00 29 August 2012 being commencement of term of M 15/1805 |
Forfeiture | 405363 | Initiated:04/09/2012 for non-compliance with reporting requirementsRECORDED:15:47:13 05 September 2012Notice Issued:Regulation 50 Notice sent 04/09/2012 for non-compliance with reporting requirements pursuant to Sec 115A.Compliance Date:05/10/2012FINALISED:Order by Minister on 13 December 2012 that E 15/1148 be Penalty Imposed |
Fine | 413204 | Fine in respect to:Forfeiture Process 405363Fine reason:Non-compliance with mineral exploration reporting provisionsPenalty amount:$450.00Notification date:14/12/2012Due date:25/01/2013Pursuant to:Section 96A(5)RECORDED:13 December 2012PAYMENT RECEIVED:04 January 2013Receipt Number:06-119083Amount:$450.00Remaining balance:$0.00FINALISED:04 January 2013 |
Partial Surrender - Voluntary | 444786 | Lodged:13:00 23 April 2014Surrendered Blocks:KALGOORLIE 2751 p, t, u
KALGOORLIE 2752 a, b, l, q, r, s, tSurrendered Total:10 BL.REGISTERED:13:00 23 April 2014 |
Application to Amend | 450373 | Lodged:12:30 08 July 2014Amending:AddressFrom:NORVALE PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:NORVALE PTY LTD, 2 PURSER COVE, MURDOCH, WA, 6150From:BROWN, Ronald William, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, WA, 6849To:BROWN, Ronald William, 2 PURSER COVE, MURDOCH, WA, 6150RECORDED:12:30 08 July 2014 |
Conversion | 459778 | New Tenement:M 15/1812Application Date:13:48:01 12 Dec 2014Section:S67Converted 00:00 06 July 2015 being commencement of term of M 15/1812 |
Extension / Renewal of Term | 467922 | Lodged:08:49:50 22 May 2015Applied For Period:5 YearsRECORDED:08:49:50 22 May 2015GRANTED:27 July 2015Granted Period:5 YearsTerm Extended To:23/05/2020 |
Partial Surrender - Voluntary | 472730 | Lodged:09:37:42 12 August 2015Surrendered Blocks:KALGOORLIE 2752 f, g, k, m, n, oSurrendered Total:6 BL.REGISTERED:09:37:42 12 August 2015 |
Extension of Time | 535294 | Lodged:13:37:09 18 July 2018Type:Stat DecRECORDED:13:37:09 18 July 2018APPROVED:13:33:21 20 July 2018Time to lodge extended to 10 Aug 2018 |
Conversion | 548049 | New Tenement:M 15/1862Application Date:15:20:04 19 Feb 2019Section:S67 |
Surrender - Outright | 554312 | Lodged:08:44:12 22 May 2019REGISTERED:08:44:12 22 May 2019 |