Extracted from MTO on 01-Jul-2025 00:25,
last changed 01-Jul-2025.
# | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 09-Oct-2008 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 09-Oct-2008 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-Oct-2008 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-Oct-2008 | |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licence 15/245 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 09-Oct-2008 | |
6 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 09-Oct-2008 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Unnumbered Land Act Reserve 13. | 09-Oct-2008 | |
8 | 1 | No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land (RCL/8) as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978. | 09-Oct-2008 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by Condition (8) hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 09-Oct-2008 | |
10 | 1 | Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition (8) hereof being approved by the State Mining Engineer, DoCEP in consultation with the operator of the railway on corridor land. | 09-Oct-2008 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition (8) hereof without the prior approval of the operator of the railway on corridor land. | 09-Oct-2008 | |
12 | 1 | The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition (8) hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 09-Oct-2008 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods Safety Branch, DoCEP. | 09-Oct-2008 | |
14 | 1 | The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA. | 09-Oct-2008 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land. | 09-Oct-2008 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe immediately after completion. | 09-Oct-2008 | |
2 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 09-Oct-2008 | |
3 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-Oct-2008 | |
4 | 1 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-Oct-2008 | |
5 | 1 | The rights of ingress to and egress from Miscellaneous Licence 15/245 being at all times preserved to the licensee and no interference with the purpose or installations connected to the licence. | 09-Oct-2008 | |
6 | 1 | Mining on a strip of land 20 metres wide with any pipeline as the centreline being confined to below a depth of 31 metres from the natural surface and no mining material being deposited upon such strip and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 09-Oct-2008 | |
7 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Unnumbered Land Act Reserve 13. | 09-Oct-2008 | |
8 | 1 | No mining within 30 metres of either side and to a depth of 15 metres of the Rail Corridor Land (RCL/8) as shown in TENGRAPH without the prior written approval of the Minister responsible for the Mining Act 1978. | 09-Oct-2008 | |
9 | 1 | No surface excavation approaching closer to the boundary of the Safety Zone established by Condition (8) hereof than a distance equal to three times the depth of the excavation without the prior written approval of the State Mining Engineer, DoCEP. | 09-Oct-2008 | |
10 | 1 | Mining below 15 metres from the natural surface of the land in the Safety Zone established in Condition (8) hereof being approved by the State Mining Engineer, DoCEP in consultation with the operator of the railway on corridor land. | 09-Oct-2008 | |
11 | 1 | No interference with the drainage pattern, and no parking, storage or movement of equipment or vehicles used in the course of mining within the Safety Zone established by Condition (8) hereof without the prior approval of the operator of the railway on corridor land. | 09-Oct-2008 | |
12 | 1 | The Licensee not excavating, drilling, installing, erecting, depositing or permitting to be excavated, drilled, installed, erected or deposited within the Safety Zone established in Condition (8) hereof, any pit, well, pavement, foundation, building, or other structure or installation, or material of any nature whatsoever without the prior written consent of the State Mining Engineer, DoCEP. | 09-Oct-2008 | |
13 | 1 | No explosives being used or stored within one hundred and fifty (150) metres of the rail corridor land without the prior written consent of the Director, Dangerous Goods Safety Branch, DoCEP. | 09-Oct-2008 | |
14 | 1 | The rights of ingress to and egress from the rail corridor land being at all times preserved to the employees, contractors and agents of the operator of the railway on corridor land, and the Public Transport Authority of WA. | 09-Oct-2008 | |
15 | 1 | Such further conditions as may from time to time be imposed by the Minister responsible for the Mining Act 1978 for the purpose of protecting the rail corridor land. | 09-Oct-2008 | |
Type | Number | Details |
Extension / Renewal of Term | 432561 | Lodged:13:50 04 October 2013Applied For Period:5 YearsRECORDED:13:50 04 October 2013GRANTED:02 January 2014Granted Period:5 YearsTerm Extended To:08/10/2018 |
Expiry - Full | 540558 | EFFECTIVE:Midnight 08 October 2018 |