Extracted from MTO on 07-Jul-2025 00:31,
last changed 28-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | Without the prior written consent of the Minister for Mines no mining (exploration) is allowed within Marine Reserve 6 and 5G Reserve 30885, the Shark Bay World Heritage Property (designated as 'FNA Area 1834' on TENGRAPH) and on the area north of the Denham-Overlander Road. | 18-Jun-1999 | |
2 | 1 | Prior to accessing the licence area, the licensee shall consult with the Regional Environmental Officer, Department of Minerals and Energy (DME), and ensure that where required all vehicles and equipment entering the licence area are washed down to remove soil and plant propagules and adhering to such conditions specified for the prevention of the spread of soil-borne diseases. | 18-Jun-1999 | |
3 | 1 | Access to and from and the movement of vehicles within the licence area being restricted to ground or seasonal conditions and routes approved under the program or otherwise agreed by the Regional Environmental Officer, DME. | 18-Jun-1999 | |
4 | 2 | Prior to any exploration activity:
the licensee preparing a detailed program for each phase of proposed exploration for written approval of the State Mining Engineer.The State Mining Engineer to consult with the Regional/District Manager, Department of Conservation and Land Management or the Department of Environmental Protection or other government agency (as relevant) prior to approval. This program to describe the environmental impacts and programs for their management and is to include:- - maps and/or aerial photographs showing the proposed locations of all ground activities and disturbances;
- the purpose, specifications and extent of each activity and disturbance;
- descriptions of all vegetation types (in general terms), land forms, and unusual features likely to be affected by such proposed disturbances;
- details on proposals that may disturb sensitive terrestrial habitats including any declared rare flora and fauna if applicable;
- procedures to protect the integrity of special ecosystems;
- techniques, prescriptions, and timetable for rehabilitation of all proposed disturbances;
- undertaking for corrective measures for failed rehabilitation;
- details of water requirements from within the designated area;
- details of refuse disposal; and
- proposals for instruction and supervision of personnel and contractors in respect to environmental conditions.
| 09-Jul-2010 | |
4 | 1 | Prior to any activity for exploration involving:The licensee preparing a detailed program for each phase of proposed exploration for written approval of the State Mining Engineer.The State Mining Engineer to consult with the Regional/District Manager, Department of Conservation and Land Management or the Department of Environmental Protection or other government agency (as relevant) prior to approval. This program to describe the environmental impacts and programs for their management and is to include:-- maps and/or aerial photographs showing the proposed locations of all ground activities and disturbances;
- the purpose, specifications and extent of each activity and disturbance;
- descriptions of all vegetation types (in general terms), land forms, and unusual features likely to be affected by such proposed disturbances;
- details on proposals that may disturb sensitive terrestrial habitats including any declared rare flora and fauna if applicable;
- procedures to protect the integrity of special ecosystems;
- techniques, prescriptions, and timetable for rehabilitation of all proposed disturbances;
- undertaking for corrective measures for failed rehabilitation;
- details of water requirements from within the designated area;
- details of refuse disposal; and
- proposals for instruction and supervision of personnel and contractors in respect to environmental conditions.
| 18-Jun-1999 | 08-Jul-2010 |
5 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 18-Jun-1999 | |
6 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | |
6 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 18-Jun-1999 | 11-Aug-2005 |
7 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration programme. | 18-Jun-1999 | |
8 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | |
8 | 1 | Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Jun-1999 | 11-Aug-2005 |
9 | 1 | The licensee notifying the holder of any underlying pastoral lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 18-Jun-1999 | |
10 | 1 | The licensee or transferee as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral lease details of the grant or transfer. | 18-Jun-1999 | |
11 | 1 | No interference with the Telecom Overlander to Denham Digital Radio system and Transmission Lines or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 18-Jun-1999 | |
12 | 1 | No interference with Geodetic Survey Station Yaringa 81,82 and 118 to 122 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 18-Jun-1999 | |
13 | 1 | Prior to the cessation of the exploration/prospecting activity in the designated area, the licensee notifying the Regional Environmental Officer, DME and arranging an inspection as required. | 18-Jun-1999 | |
14 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work on E09/939, E09/940, M09/103 and M09/104 for Gunson Resources Limited (Reg ID 27259)" dated 14 June 2010 signed by Paul Leandri and retained on Department of Mines and Petroleum File No. T2078/200402.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 03-Feb-2011 | |
15 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 03-Feb-2011 | |
16 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 03-Feb-2011 | |
Cond # | Ver | Text | Start | End |
1 | 1 | Without the prior written consent of the Minister for Mines no mining (exploration) is allowed within Marine Reserve 6 and 5G Reserve 30885, the Shark Bay World Heritage Property (designated as 'FNA Area 1834' on TENGRAPH) and on the area north of the Denham-Overlander Road. | 18-Jun-1999 | |
2 | 1 | Prior to accessing the licence area, the licensee shall consult with the Regional Environmental Officer, Department of Minerals and Energy (DME), and ensure that where required all vehicles and equipment entering the licence area are washed down to remove soil and plant propagules and adhering to such conditions specified for the prevention of the spread of soil-borne diseases. | 18-Jun-1999 | |
3 | 1 | Access to and from and the movement of vehicles within the licence area being restricted to ground or seasonal conditions and routes approved under the program or otherwise agreed by the Regional Environmental Officer, DME. | 18-Jun-1999 | |
4 | 2 | Prior to any exploration activity:
the licensee preparing a detailed program for each phase of proposed exploration for written approval of the State Mining Engineer.The State Mining Engineer to consult with the Regional/District Manager, Department of Conservation and Land Management or the Department of Environmental Protection or other government agency (as relevant) prior to approval. This program to describe the environmental impacts and programs for their management and is to include:- - maps and/or aerial photographs showing the proposed locations of all ground activities and disturbances;
- the purpose, specifications and extent of each activity and disturbance;
- descriptions of all vegetation types (in general terms), land forms, and unusual features likely to be affected by such proposed disturbances;
- details on proposals that may disturb sensitive terrestrial habitats including any declared rare flora and fauna if applicable;
- procedures to protect the integrity of special ecosystems;
- techniques, prescriptions, and timetable for rehabilitation of all proposed disturbances;
- undertaking for corrective measures for failed rehabilitation;
- details of water requirements from within the designated area;
- details of refuse disposal; and
- proposals for instruction and supervision of personnel and contractors in respect to environmental conditions.
| 09-Jul-2010 | |
4 | 1 | Prior to any activity for exploration involving:The licensee preparing a detailed program for each phase of proposed exploration for written approval of the State Mining Engineer.The State Mining Engineer to consult with the Regional/District Manager, Department of Conservation and Land Management or the Department of Environmental Protection or other government agency (as relevant) prior to approval. This program to describe the environmental impacts and programs for their management and is to include:-- maps and/or aerial photographs showing the proposed locations of all ground activities and disturbances;
- the purpose, specifications and extent of each activity and disturbance;
- descriptions of all vegetation types (in general terms), land forms, and unusual features likely to be affected by such proposed disturbances;
- details on proposals that may disturb sensitive terrestrial habitats including any declared rare flora and fauna if applicable;
- procedures to protect the integrity of special ecosystems;
- techniques, prescriptions, and timetable for rehabilitation of all proposed disturbances;
- undertaking for corrective measures for failed rehabilitation;
- details of water requirements from within the designated area;
- details of refuse disposal; and
- proposals for instruction and supervision of personnel and contractors in respect to environmental conditions.
| 18-Jun-1999 | 08-Jul-2010 |
5 | 1 | All surface holes drilled for the purpose of exploration are to be capped, filled or otherwise made safe after completion. | 18-Jun-1999 | |
6 | 2 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Industry and Resources (DoIR). Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, DoIR. | 12-Aug-2005 | |
6 | 1 | All costeans and other disturbances to the surface of the land made as a result of exploration, including drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the District Mining Engineer. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the District Mining Engineer. | 18-Jun-1999 | 11-Aug-2005 |
7 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration programme. | 18-Jun-1999 | |
8 | 2 | Unless the written approval of the Environmental Officer, DoIR is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 12-Aug-2005 | |
8 | 1 | Unless the written approval of the District Mining Engineer is first obtained, the use of scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 18-Jun-1999 | 11-Aug-2005 |
9 | 1 | The licensee notifying the holder of any underlying pastoral lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 18-Jun-1999 | |
10 | 1 | The licensee or transferee as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the licence; or
- registration of a transfer introducing a new licensee;
advise, by registered post, the holder of any underlying pastoral lease details of the grant or transfer. | 18-Jun-1999 | |
11 | 1 | No interference with the Telecom Overlander to Denham Digital Radio system and Transmission Lines or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 18-Jun-1999 | |
12 | 1 | No interference with Geodetic Survey Station Yaringa 81,82 and 118 to 122 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 18-Jun-1999 | |
13 | 1 | Prior to the cessation of the exploration/prospecting activity in the designated area, the licensee notifying the Regional Environmental Officer, DME and arranging an inspection as required. | 18-Jun-1999 | |
14 | 1 | The construction and operation of the project and measures to protect the environment being carried out generally in accordance with the document titled:- "Programme of Work on E09/939, E09/940, M09/103 and M09/104 for Gunson Resources Limited (Reg ID 27259)" dated 14 June 2010 signed by Paul Leandri and retained on Department of Mines and Petroleum File No. T2078/200402.
Where a difference exists between the above document(s) and the following conditions, then the following conditions shall prevail. | 03-Feb-2011 | |
15 | 1 | The development and operation of the project being carried out in such a manner so as to create the minimum practicable disturbance to the existing vegetation and natural landform. | 03-Feb-2011 | |
16 | 1 | All topsoil and vegetation being removed ahead of all mining operations and being stockpiled for later respreading or immediately respread as rehabilitation progresses. | 03-Feb-2011 | |
Type | Number | Details |
Partial Surrender - Voluntary | 1008H/012 | Lodged 2:25 PM on 22 May 2002 for that portion coloured yellow on the plan attached to the Partial Surrender Document
Surrendered Blocks: MEEKATHARRA 2089 t, u; MEEKATHARRA 2090 q, r, s, t, u; MEEKATHARRA 2163 l, m, q, r, s, t, u, v, w, x, y, z; MEEKATHARRA 2164 q, v; MEEKATHARRA 2235 a, b, c, d, e; MEEKATHARRA 2236 aREGISTERED 2:25 PM 22 May 2002 |
Exemption from Drop-off | 155H/012 | Lodged on 24 May 2002 applying for relief from the provisions of Section 65(1)(a)REFUSED 12 Aug 2002Pursuant to the provisions of Section 65(1b) the expiry date fo compliance with Section 65(1)(a) is deferred until 12 Oct 2002 |
Partial Surrender - Compulsory | 48H/023 | Lodged 2:30 PM on 29 Jul 2002 in accordance with Section 65(1)(a)
Surrendered Blocks: MEEKATHARRA 2089 y; MEEKATHARRA 2090 z; MEEKATHARRA 2162 e, k, p, u, z; MEEKATHARRA 2234 eREGISTERED 12.00 Midnight 12 Oct 2002Surrendered area released 25 Oct 2002 9:00 AM under Section 65 (5) |
Exemption from Drop-off | 229H/023 | Lodged 8:35 AM on 23 May 2003 applying for relief from the provisions of Section 65(1)(b)GRANTED 18 Mar 2004 |
Extension / Renewal of Term | KR158/034 | Lodged 8:54:00 AM on 02 Jun 2004 applied for a period of 2 YearsRECORDED 8:54 AM 02 Jun 2004GRANTED 19 Oct 2004 for a further period of 2 Years |
Extension of Time | 222051 | Lodged 3:38 PM on 16 Aug 2005 to extend time of lodgement of Form 5 until 19 Aug 2005Approved on 16 Aug 2005 |
Extension / Renewal of Term | KR150/056 | Lodged 9:53:00 AM on 16 Jun 2006 applied for a period of 2 YearsRECORDED 9:53 AM 16 Jun 2006GRANTED 16 Aug 2007 for a further period of 2 Years |
Extension / Renewal of Term | 291521 | Lodged 12:12:00 PM on 22 May 2008 applied for a period of 1 YearsRECORDED:12:12 22 May 2008Granted Period:1 YearsTerm Extended To:17/06/2009GRANTED:28 January 2009 |
Extension / Renewal of Term | 323511 | Lodged:15:40 17 June 2009Applied For Period:1 YearsRECORDED:15:40 17 June 2009GRANTED:10 March 2010Granted Period:1 YearsTerm Extended To:17/06/2010 |
Extension / Renewal of Term | 348786 | Lodged:16:30 04 June 2010Applied For Period:1 YearsRECORDED:16:30 04 June 2010GRANTED:03 February 2011Granted Period:1 YearsTerm Extended To:17/06/2011 |
Bond | 362183 | Lodged:13:30 23 December 2010Bond Type:Unconditional Performance BondBond Amount:$12,000.00RECORDED:23 December 2010RETIRED - MRF:02 July 2013 |
Bond Requirement | 364486 | Requirement Date:03/02/2011Amount:$12,000.00RECORDED:10:51:14 03 February 2011FINALISED:14:25:42 02 July 2013 |
Extension / Renewal of Term | 374194 | Lodged:15:50 16 June 2011Applied For Period:1 YearsRECORDED:15:50 16 June 2011GRANTED:29 June 2011Granted Period:1 YearsTerm Extended To:17/06/2012 |
Extension / Renewal of Term | 399651 | Lodged:14:50:43 15 June 2012Applied For Period:1 YearsRECORDED:14:50:43 15 June 2012GRANTED:22 August 2012Granted Period:1 YearsTerm Extended To:17/06/2013 |
Extension / Renewal of Term | 424705 | Lodged:15:29:37 06 June 2013Applied For Period:1 YearsRECORDED:15:29:37 06 June 2013GRANTED:19 August 2013Granted Period:1 YearsTerm Extended To:17/06/2014 |
Extension / Renewal of Term | 448981 | Lodged:12:54:53 17 June 2014Applied For Period:1 YearsRECORDED:12:54:53 17 June 2014GRANTED:31 July 2014Granted Period:1 YearsTerm Extended To:17/06/2015 |
Application to Amend | 458735 | Lodged:15:15:50 04 December 2014From:GUNSON RESOURCES LTDAmending:NameTo:STRANDLINE RESOURCES LIMITEDREJECTED:15:15:50 04 December 2014 |
Application to Amend | 458847 | Lodged:11:52:44 08 December 2014Amending:NameFrom:GUNSON RESOURCES LTDTo:STRANDLINE RESOURCES LIMITEDRECORDED:11:52:44 08 December 2014 |
Extension / Renewal of Term | 469142 | Lodged:13:28:30 12 June 2015Applied For Period:1 YearsRECORDED:13:28:30 12 June 2015GRANTED:25 June 2015Granted Period:1 YearsTerm Extended To:17/06/2016 |
Extension / Renewal of Term | 488837 | Lodged:14:49:31 17 June 2016Applied For Period:1 YearsRECORDED:14:49:31 17 June 2016GRANTED:30 August 2016Granted Period:1 YearsTerm Extended To:17/06/2017 |
Application to Amend | 490199 | Lodged:13:25:15 07 July 2016Amending:Address (Including DTC Details)From:STRANDLINE RESOURCES LIMITED, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249 PERTH BUSINESS CENTRE, PERTH, WA, 6849To:STRANDLINE RESOURCES LIMITED, C/-HETHERINGTON EXPLORATION & MINING TITLE SERVICES (WA) PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxx@hemts.com.au, xxxxx977RECORDED:13:25:15 07 July 2016 |
Extension / Renewal of Term | 508424 | Lodged:15:28:44 15 June 2017Applied For Period:1 YearsRECORDED:15:28:44 15 June 2017GRANTED:04 September 2017Granted Period:1 YearsTerm Extended To:17/06/2018 |
Partial Surrender - Voluntary | 508428 | Lodged:16:08:27 15 June 2017Surrendered Blocks:MEEKATHARRA 2089 z
MEEKATHARRA 2161 d, k, p
MEEKATHARRA 2162 d, f, g, h, j, l, m, n, o, s, t, ySurrendered Total:16 BL.REGISTERED:16:08:27 15 June 2017 |
Conversion | 516922 | New Tenement:R 09/2Application Date:14:00:31 15 Jun 2017Section:S70BConverted 00:00 11 January 2019 being commencement of term of R 09/2 |
Conversion | 516923 | New Tenement:R 09/3Application Date:14:00:31 15 Jun 2017Section:S70BConverted 00:00 08 January 2019 being commencement of term of R 09/3 |
Extension / Renewal of Term | 532848 | Lodged:08:31:11 15 June 2018Applied For Period:1 YearsRECORDED:08:31:11 15 June 2018GRANTED:17 August 2018Granted Period:1 YearsTerm Extended To:17/06/2019 |
Extension / Renewal of Term | 554780 | Lodged:13:50:04 28 May 2019Applied For Period:1 YearsRECORDED:13:50:04 28 May 2019GRANTED:22 August 2019Granted Period:1 YearsTerm Extended To:17/06/2020 |
Partial Surrender - Voluntary | 556155 | Lodged:12:30:16 14 June 2019Surrendered Blocks:MEEKATHARRA 2090 v, w, x, y
MEEKATHARRA 2161 e
MEEKATHARRA 2162 a, b, cSurrendered Total:8 BL.REGISTERED:12:30:16 14 June 2019 |
Conversion | 556893 | New Tenement:R 09/4Application Date:09:24:18 04 Jun 2019Section:S70B |
Extension of Time | 563968 | Lodged:13:40 02 October 2019Type:Exemption from ExpenditureRECORDED:13:40 02 October 2019APPROVED:09:02 01 November 2019 |
Extension / Renewal of Term | 579404 | Lodged:09:11:34 05 June 2020Applied For Period:1 YearsRECORDED:09:11:34 05 June 2020GRANTED:13 July 2020Granted Period:1 YearsTerm Extended To:17/06/2021 |
Application to Amend | 590056 | Lodged:14:30 11 November 2020Amending:Address (Including DTC Details)From:Principal Place of Business : COBURN RESOURCES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxxxx@hemts.com.au, xxxxxxx977 and DTC :COBURN RESOURCES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, PO BOX 8249, PERTH BUSINESS CENTRE, PERTH, WA, 6849, xxxxxxx@hemts.com.au, xxxxxxx977To:Principal Place of Business : COBURN RESOURCES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, LEVEL 19, SUITE 4, 44 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxxxx977 and DTC :COBURN RESOURCES PTY LTD, HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, C/- HETHERINGTON EXPLORATION & MINING TITLE SERVICES PTY LTD, SUITE 404, GROUND FLOOR, 50 ST GEORGES TERRACE, PERTH, WA, 6000, xxxxx@hemts.com.au, xxxxxxx977RECORDED:14:30 11 November 2020 |
Extension / Renewal of Term | 626174 | Lodged:08:30 15 June 2021Applied For Period:1 YearsRECORDED:08:30 15 June 2021GRANTED:17 August 2021Granted Period:1 YearsTerm Extended To:17/06/2022 |
Mortgage | 629381 | Lodged:16:22:53 30 July 2021Mortgaged Shares:100/100 shares COBURN RESOURCES PTY LTDMortgagee:GLOBAL LOAN AGENCY SERVICES AUSTRALIA NOMINEES PTY LIMITEDREGISTERED:16:22:53 30 July 2021 |
Expiry - Partial | 650873 | Expired Land:Conversion - R09/4Retained Blocks:MEEKATHARRA 2162 q, r, v, x
MEEKATHARRA 2234 b, c, d, g, h, jRetained Total:10 BL.EFFECTIVE:00:00 13 April 2022 |
Extension / Renewal of Term | 651734 | Lodged:10:59:58 17 June 2022Applied For Period:1 YearsRECORDED:10:59:58 17 June 2022GRANTED:18 August 2022Granted Period:1 YearsTerm Extended To:17/06/2023 |
Extension / Renewal of Term | 678563 | Lodged:08:30 15 June 2023Applied For Period:1 YearsRECORDED:08:30 15 June 2023GRANTED:22 December 2023Granted Period:1 YearsTerm Extended To:17/06/2024 |
Extension of Time | 684567 | Lodged:10:05:31 25 August 2023Type:Exemption from ExpenditureRECORDED:10:05:31 25 August 2023APPROVED:07:40 04 October 2023Period for lodgement of Exemption from Expenditure extended to 20 October 2023 |
Extension of Time | 684568 | Lodged:10:05:31 25 August 2023Type:Form 5RECORDED:10:05:31 25 August 2023APPROVED:09:31:32 09 January 2024EOT for late lodgement Form 5 approved to COB 17/08/2023 |
Surrender - Outright | 704807 | Lodged:15:15:21 23 May 2024REGISTERED:15:15:21 23 May 2024 |