Extracted from MTO on 29-Jun-2025 01:00,
last changed 29-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 24-Jan-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 24-Jan-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 24-Jan-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 24-Jan-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 24-Jan-2019 | |
6 | 1 | No interference with Geodetic Survey Station NMF 611 and ZD 76 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 24-Jan-2019 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 24-Jan-2019 | |
| 1 | Consent to explore on Stock Route Reserve 9701 De Grey Mullewa Byro & Murgoo granted subject to the following condition: | 24-Jan-2019 | |
8 | 1 | No exploration activities being carried out on De Grey Mullewa Stock Route Reserve 9701 which restrict the use of the reserve. | 24-Jan-2019 | |
| 1 | In respect to the area of land designated FNA 7618 in TENGRAPH, hereunder referred to as the designated area, the following conditions shall apply: | 24-Jan-2019 | |
9 | 1 | Prior to carrying out any on-ground activities, the Licensee developing a plan of activities to ensure that electromagnetic emissions from those activities will not interfere with the radio-quiet requirements of the Murchison Radio-astronomy Observatory. The plan shall be submitted to the "Coordinator for Radio Emissions Management Issues" at the Department of Mines, Industry Regulation and Safety (DMIRS) for approval by the Director General of DMIRS. | 24-Jan-2019 | |
10 | 1 | The approved plan to be included with any "Programme of Work" or "Mining Proposal" submitted to DMIRS for approval under the Mining Act 1978. | 24-Jan-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 24-Jan-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 24-Jan-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 24-Jan-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 24-Jan-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 24-Jan-2019 | |
6 | 1 | No interference with Geodetic Survey Station NMF 611 and ZD 76 and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 24-Jan-2019 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 24-Jan-2019 | |
| 1 | Consent to explore on Stock Route Reserve 9701 De Grey Mullewa Byro & Murgoo granted subject to the following condition: | 24-Jan-2019 | |
8 | 1 | No exploration activities being carried out on De Grey Mullewa Stock Route Reserve 9701 which restrict the use of the reserve. | 24-Jan-2019 | |
| 1 | In respect to the area of land designated FNA 7618 in TENGRAPH, hereunder referred to as the designated area, the following conditions shall apply: | 24-Jan-2019 | |
9 | 1 | Prior to carrying out any on-ground activities, the Licensee developing a plan of activities to ensure that electromagnetic emissions from those activities will not interfere with the radio-quiet requirements of the Murchison Radio-astronomy Observatory. The plan shall be submitted to the "Coordinator for Radio Emissions Management Issues" at the Department of Mines, Industry Regulation and Safety (DMIRS) for approval by the Director General of DMIRS. | 24-Jan-2019 | |
10 | 1 | The approved plan to be included with any "Programme of Work" or "Mining Proposal" submitted to DMIRS for approval under the Mining Act 1978. | 24-Jan-2019 | |
Type | Number | Details |
Surrender - Outright | 557161 | Lodged:16:04:40 26 June 2019REGISTERED:16:04:40 26 June 2019 |