Extracted from MTO on 06-Jul-2025 00:43,
last changed 26-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 13-Mar-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Mar-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Mar-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Mar-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Mar-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 13-Mar-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 13-Mar-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 13-Mar-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 13-Mar-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 13-Mar-2019 | |
Type | Number | Details |
Extension / Renewal of Term | 694381 | Lodged:13:47:04 18 January 2024Applied For Period:5 YearsRECORDED:13:47:04 18 January 2024GRANTED:07 May 2024Granted Period:5 YearsTerm Extended To:12/03/2029 |
Partial Surrender - Compulsory | 723711 | Lodged:08:58:17 17 January 2025Section:Section 65 (3)Surrendered Blocks:MEEKATHARRA 598 t, u
MEEKATHARRA 599 q
MEEKATHARRA 671 d, e, f, g, h, j, k
MEEKATHARRA 672 a, b, f, gSurrendered Total:14 BL.REGISTERED:Midnight 12 March 2025Surrendered area to be released 08:30:00 07/04/2025 under Section 65 (3)Surrendered area released 08:30:00 07/04/2025 under Section 65 (3) |
Referred to Native Title Date | Referral Type | Current Status | Procedure | Details | Objections | Water Comments | Determination Areas | Claims | Representative Area Bodies |
08-May-2018 | Tenement Application | Expedited Procedure : Native Title Cleared - Expedited Applies | Expedited Procedure | 2018-07-252018-11-25CLEARED - Expedited Applies2019-03-1234 BL24450S1155130E74km NE'ly of Gascoyne Junction | WO2018/08712018-11-05WC1997/028Objection Withdrawn2019-03-11 | | | Gnulli(WC1997/028)WC1997/028WAD6161/1998falseDetermined | 14GeraldtonYamatji Marlpa Aboriginal Corporation |
08-May-2018 | Tenement Application | Expedited Procedure : Re-notify | Expedited Procedure | 2018-05-302018-09-30FINALISED - To Be Renotified2018-07-0534 BL24450S1155130E74km NE'ly of Gascoyne Junction | | | | Gnulli(WC1997/028)WC1997/028WAD6161/1998trueDetermined | 14GeraldtonYamatji Marlpa Aboriginal Corporation |