Extracted from MTO on 08-Jul-2025 01:23,
last changed 30-Jun-2025.
# | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 19-Jul-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 19-Jul-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 19-Jul-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 19-Jul-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 19-Jul-2019 | |
6 | 1 | No interference with Aquaculture Lease No. 23 and 877. | 19-Jul-2019 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 19-Jul-2019 | |
8 | 1 | No interference with Geodetic Survey Stations KAP 23, QUOBBA 100, 101, 89, 90, 91, 92, 93, 94, 95, 96, 97, 98, 99, and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 19-Jul-2019 | |
9 | 1 | No construction of any building within a 500 metre strip from the coast line, without the prior written approval of the Minister responsible for the Mining Act 1978 being obtained. | 19-Jul-2019 | |
10 | 1 | No interference with the Communications Tower or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 19-Jul-2019 | |
11 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Seabed foreshore and navigable waters. | 19-Jul-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 19-Jul-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 19-Jul-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 19-Jul-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 19-Jul-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 19-Jul-2019 | |
6 | 1 | No interference with Aquaculture Lease No. 23 and 877. | 19-Jul-2019 | |
7 | 1 | No interference with the use of the Aerial Landing Ground and mining thereon being confined to below a depth of 15 metres from the natural surface. | 19-Jul-2019 | |
8 | 1 | No interference with Geodetic Survey Stations KAP 23, QUOBBA 100, 101, 89, 90, 91, 92, 93, 94, 95, 96, 97, 98, 99, and mining within 15 metres thereof being confined to below a depth of 15 metres from the natural surface. | 19-Jul-2019 | |
9 | 1 | No construction of any building within a 500 metre strip from the coast line, without the prior written approval of the Minister responsible for the Mining Act 1978 being obtained. | 19-Jul-2019 | |
10 | 1 | No interference with the Communications Tower or the installations in connection therewith, and the rights of ingress to and egress from the facility being at all times preserved to the owners thereof. | 19-Jul-2019 | |
11 | 1 | The prior written consent of the Minister responsible for the Mining Act 1978 being obtained before commencing any exploration activities on Seabed foreshore and navigable waters. | 19-Jul-2019 | |
Type | Number | Details |
Objection | 526892 | Lodged:08:30 03 April 2018Objectors:DAMPIER SALT LTDObjection Type:Tenement ApplicationRECORDED:08:30 03 April 2018Minute of Programming Directions lodged to finalise the objectionFINALISED:10:00 08 June 2018Wardens Decision Made on:10:00 08 June 2018Wardens Decision Status:Finalised |
Application to Amend | 528038 | Lodged:12:30 16 April 2018Amending:Other/Non-title changesSub Surface Rights only in respect to Private LandRECORDED:12:30 16 April 2018 |
Surrender - Outright | 584857 | Lodged:10:27:26 26 August 2020REGISTERED:10:27:26 26 August 2020 |