1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 09-Aug-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-Aug-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-Aug-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 09-Aug-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 09-Aug-2019 | |
Cond # | Ver | Text | Start | End |
1 | 1 | All disturbances to the surface of the land made as a result of exploration, including costeans, drill pads, grid lines and access tracks, being backfilled and rehabilitated to the satisfaction of the Environmental Officer, Department of Mines, Industry Regulation and Safety. Backfilling and rehabilitation being required no later than 6 months after excavation unless otherwise approved in writing by the Environmental Officer, Department of Mines, Industry Regulation and Safety. | 09-Aug-2019 | |
2 | 1 | All waste materials, rubbish, plastic sample bags, abandoned equipment and temporary buildings being removed from the mining tenement prior to or at the termination of exploration program. | 09-Aug-2019 | |
3 | 1 | Unless the written approval of the Environmental Officer, Department of Mines, Industry Regulation and Safety is first obtained, the use of drilling rigs, scrapers, graders, bulldozers, backhoes or other mechanised equipment for surface disturbance or the excavation of costeans is prohibited. Following approval, all topsoil being removed ahead of mining operations and separately stockpiled for replacement after backfilling and/or completion of operations. | 09-Aug-2019 | |
4 | 1 | The Licensee notifying the holder of any underlying pastoral or grazing lease by telephone or in person, or by registered post if contact cannot be made, prior to undertaking airborne geophysical surveys or any ground disturbing activities utilising equipment such as scrapers, graders, bulldozers, backhoes, drilling rigs; water carting equipment or other mechanised equipment. | 09-Aug-2019 | |
5 | 1 | The Licensee or transferee, as the case may be, shall within thirty (30) days of receiving written notification of:-- the grant of the Licence; or
- registration of a transfer introducing a new Licensee;
advise, by registered post, the holder of any underlying pastoral or grazing lease details of the grant or transfer. | 09-Aug-2019 | |
Type | Number | Details |
Extension of Time | 525907 | Lodged:14:59:28 19 March 2018Type:SecurityRECORDED:14:59:28 19 March 2018Extension granted to COB 4 April 2018APPROVED:09:45 23 March 2018 |
Extension of Time | 589497 | Lodged:11:30:03 03 November 2020Type:Stat DecRECORDED:11:30:03 03 November 2020APPROVED:12:07:53 04 November 2020Time to lodged extended to 25/11/2020 |
Forfeiture | 594271 | Initiated:11/01/2021 for non-compliance with expenditure conditionsRECORDED:10:20 21 January 2021Notice Issued:Regulation 50 Notice sent 11/01/2021 for non-compliance with expenditure conditions pursuant to Reg 15.Compliance Date:15/02/2021FINALISED:Order by Minister on 11 March 2021 that E 09/2298 be Penalty Imposed |
Fine | 617673 | Fine in respect to:Forfeiture Process 594271Fine reason:Non-compliance with expenditure obligationsPenalty amount:$858.00Notification date:18/03/2021Due date:22/04/2021Pursuant to:Section 96A(5)RECORDED:12 March 2021PAYMENT RECEIVED:15 April 2021FINALISED:15 April 2021Receipt Number:10192336Amount:$858.00Remaining balance:$0.00 |
Application to Amend | 673176 | Lodged:15:24:05 12 April 2023Amending:Address (Including DTC Details)From:Principal Place of Business : YANGIBANA PTY LTD, LEVEL 3, 5 MILL STREET, PERTH, WA, 6000 and DTC :YANGIBANA PTY LTD, YANGIBANA PTY LTD, LEVEL 3, 5 MILL STREET, PERTH, WA, 6000To:Principal Place of Business : YANGIBANA PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400 and DTC :YANGIBANA PTY LTD, AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, C/- AUSTWIDE MINING TITLE MANAGEMENT PTY LTD, PO BOX 1434, WANGARA, WA, 6947, xxxxxxxxx@austwidemining.com.au, xxxxx400RECORDED:15:24:05 12 April 2023 |
Extension / Renewal of Term | 709877 | Lodged:09:57:47 19 July 2024Applied For Period:5 YearsRECORDED:09:57:47 19 July 2024GRANTED:11 April 2025Granted Period:5 YearsTerm Extended To:08/08/2029 |
Application to Amend | 734926 | Lodged:15:17:42 03 June 2025PENDING |